1 / 17

ATP Annex 1, Appendix 2 § [49 (b)] Mechanically refrigerated equipment

ATP Agreement on the International Carriage of Perishable Foodstuffs and on the Special Equipment to be used for such Carriage.

zlhna
Télécharger la présentation

ATP Annex 1, Appendix 2 § [49 (b)] Mechanically refrigerated equipment

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ATP Agreement on the International Carriage of Perishable Foodstuffs and on the Special Equipment to be used for such Carriage

  2. “It shall be verified that, when the outside temperature is not lower than + 15 oC, the inside temperature of the empty equipment, which has been previously brought to the outside temperature, can be brought within a maximum period of 6 hours.” ATPAnnex 1, Appendix 2 § [49 (b)] Mechanically refrigerated equipment

  3. “It shall be… , …can be brought within a maximum period as described in the following table in the case of equipment in classes A, B, or C, to the minimum temperature, as prescribed in this table:” UNWP.11TRANS/WP.11/2004/929 JULY 2004

  4. UNWP.11TRANS/WP.11/2004/929 JULY 2004 Mean outside temperature

  5. Inspections carried out through 2001 – 2005 Evaluation with shorter cool-down time According to TRANS.WP11/2004/9 Statistics is presented in diagrams Number of passed / failed and total number of evaluated equipments Fraction of passed / failed and total number of evaluated equipments Evaluation of annual ATP-inspectionsdue to new criterias

  6. BODIES 13 THERMAL EQUIPMENT 4 MANUFACTURER

  7. Number of passed /failed of total number tested (233 units)

  8. Number of passed /failed of total number tested (233 units)

  9. Number of failed of total number tested (233 units)

  10. Number of passed of total number tested (233 units)

  11. Number of passed /failed of total number tested (233 units)

  12. Fraction of passed /failed of total number tested (233 units)

  13. Fraction of passed /failed of total number tested (233 units)

  14. Fraction of failed of total number tested (233 units)

  15. Fraction of passed of total number tested (233 units)

  16. Fraction of passed /failed of total number tested (233 units)

More Related