An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Business Improvement Techniques NVQ Level 2

  2. The Team PeterFerns Nigel Wright Adam Shephard JohnCleall MikeHarvard-Taylor

  3. AISH Technologies • Electro-mechanical design and manufacture of ruggedized defence enclosures using a wide range of processes including: • Sheetmetal/fabrication/laser cutting • Spray shop & powder coating facilities • Machine shop • Mechanical Assembly • Electrical Assembly • Flat panel display assembly • Fibre optic manufacture

  4. Typical Products

  5. Why choose BIT Implementing BIT is designed to reduce: • Poor delivery performance • Department bottle-necks • Untidy work areas • Generate additional floor space to include new processes

  6. Plan: Identification • Over cluttered • Un-used potential • Redundant machinery • Health & Safety hazards • Low morale

  7. Planning • Role responsibilities • 5W’s & 1H • Brainstorming • Action planning

  8. Communicating • Team meetings • Feedback from operators working in the area • Planning reviews

  9. Do: Confirming Current State We decided that it would be essential to carry out an extensive 5S exercise in an area that would allow us to free up space for red-tagging and the storage of some WIP. It would also yield a floor space utilization opportunity of £7500.

  10. Implementation • Red Tagging and catalogue • Create shadow boards • Purchase tooling • Encouraged employee involvement to drive change in methods and attitudes • Utilise cleared area • Introduce Standard Operating Procedures • Regular 5S audit

  11. Red Tag Area

  12. Check: Measure results Process Performance The process was re-timed with the tool boards in place, and it was now 2 minutes and 35 seconds, which compared to the ‘before’ state of 17 minutes and 37 seconds is a 93% improvement

  13. Measure Results

  14. Confirming New State • Outcome • Floor space realised and now re-deployed as a packaging and quarantine area • New tooling implemented to realise annual cost saving • 5S score improved by 1600% • Two new SOPs created, issued and displayed to help Standardise & Sustain 5S improvements Target • Realise Floor Space Utilization of £7500 • Implement new tooling methods to realise cost saving of £2250 • Improve 5S score by 300% • Confirm / re-write / amend SOP to reflect the requirements to maintain new state

  15. Personal Achievements • How to structure a LEAN activity • Better communication skills • The importance of involving those working in the areas chosen for the business improvement • Problem solving techniques • Understanding and working with personalities within the team • Spreading the philosophy of the process