1 / 3

LHCONE P2P experiment plan discussion

LHCONE P2P experiment plan discussion. We have heard about the NSI implementations needed for basic circuit setup Now need to discuss some of the first steps in the experiment

zwi
Télécharger la présentation

LHCONE P2P experiment plan discussion

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. LHCONE P2P experiment plan discussion • We have heard about the NSI implementations needed for basic circuit setup • Now need to discuss some of the first steps in the experiment • The idea has been to start with a small collection of NSPs, make sure that functional multi-domain circuits can be established between these, and then add to the mix the several sites that expressed interest

  2. Seems to me that circuit setup tests involve several steps: • Just set up circuits between NSPs • Use the circuits to connect a test application • Build a test harness that automatically sets up circuits and then stress tests them with traffic load that corresponds to the set up requested b/w • Step 1 can be done manually, but should test all combinations of domains • Step 2 requires an application. It has be en suggested that perfSONAR PS systems, appropriately configured canrovide test app

  3. The test harness should periodically set up circuits, connect them to apps, and then stress test. The result should be: I) a record of the set up II) a record of the traffic, demonstrating that the requested capability (e.g. bandwidth) was provided throughout the test. III) repeat I) and II) on a regular basis. IV) add in the sites and do the same, but with the source and destination being within the site

More Related