BIM Coordination Services for Improved Efficiency & Shorter Project Lifecycle

Seeking BIM coordination services for improved efficiency and shorter project lifecycle? Consult BIM modelers in California to get a collaborated MEP workflow.

Bim1
Télécharger la présentation

BIM Coordination Services for Improved Efficiency & Shorter Project Lifecycle

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. BIM Coordination Services for Improved Efficiency & Shorter Project Lifecycle An Initiative by Tejjy Inc. BIM Modeling Service Provider in USA (California, Florida & Texas)

  2. Table of Content • History of BIM Coordination • Purpose of BIM Coordination • Benefits of BIM Model Coordination • Process of BIM Coordination • How BIM is used during Design & MEP Coordination? • Trades involved in MEP-FP Coordination • Proven Facts: MEP Coordination Facilitating Construction • Where should I get best BIM Coordination Services in USA?

  3. History of BIM Coordination • Construction sector has progressed with changes in technology. • Earlier, most construction process relied on paper drawings. • 2D models in AutoCAD (1960s) had problems in connecting 2D drawing with 3D objects. • 1980s saw another revolutionor the paradigm shiftwith companies adopting various digital technologies like BIM. • Currently, BIM digital transformation is widely adopted and helps to resolve construction problems. • BIM clash detection&BIM coordination are interchangeable in the construction sector and are considered essentialfor design build projects. • Hence, BIM coordination facilitates collaboration amongst various services including architectural, structural &MEP.

  4. Purpose of BIM Coordination • One of the main objectives of BIM coordination is to make efficient collaboration, combining different disciplines in a construction project. • As a result, clash detection is a fundamental part of 3D BIM coordination, identifying clashes amongst different designs and models to work out in the most competent manner.

  5. Benefits of BIM Model Coordination • Easier identification of design error at the pre-construction, preventing costs while fixing at later stages. • Maximized building space utilization. • Clash detection within Revit & NavisWorks reduce the number of changes in the construction process. • Real time construction scheduling – a byproduct of 3D BIM coordination. • Design improvements with detailed mapping and extensive 3D clash detection reports. • Easier collaboration amongst different stakeholders likeengineers, architects, contractors, and so on. • Improved design accuracy, resolving issues before they’ve become crucial at later stages. • Multiple engineers working on a unified model, reflecting changes from each.

  6. Process of BIM Coordination • Correct Model Placement • Choosing BIM Coordination Tools • Selecting Common Format for Models to Work With • Integrating IFC Models • Considering the Scope of Coordination Check • Determining the Checking Rules • Performing a Model Check • Figuring out the People responsible for Fixing Collisions • Communicating with team on fixing collisions • Analyzing clash check and figure out

  7. Trades involved in MEP-FP Coordination • Mechanical - HVAC equipment like cooling tower, ducting, etc. • Electrical - Switchboards, panel, elevator, transformer, cable tray, etc. • Plumbing - Pumps, tanks, pool filtration equipment, grease, sand traps, etc. • Fire Safety - Fire sprinkler pump, shutter, smoke curtain, piping system, etc. • Exterior Building – Rooftop, external building face, etc.

  8. How BIM is used during Design & MEP Coordination? • Using the Right MEP BIM Template for Mechanical, Electrical, Plumbing & Fire Protection Services • Model Validation with Architectural, Structural & MEP Services • MEP Model Creation and collaborating with building sub-disciplines through Levels, Rooms, Horizontal & Vertical Spaces • Running Clash Detection through NavisWorks • Resolving clashes in the Revit Model

  9. Proven Facts: MEP Coordination Facilitating Construction • A well-executed MEP design coordinationsaves money and delivers project faster. • Multi-disciplinary collaboration saves designers and engineers from cumbersome efforts of updating designs. • Reality computing &Point Cloud to BIM enable complete coordination of MEP model for existing facilities in quick time. • Outsourcing BIM MEP coordination promises greater flexibility, scalability, swift turnarounds, & reduction in overhead expenditures.

  10. Where should I get best BIM Coordination Services in USA? • BIM coordination is not just automated collision checking, it’s much more than that. • Choose one of the best BIM modeling service firms - Tejjy Inc. and get BIM coordination services in California, Florida and Texas. • To schedule a free consultation, get in touch at 202-465-4830 or info@tejjy.com. Read more about Tejjy Inc.’s Case Study on BIM Modeling Solution for Clash Detection