ClearWhs
Uploaded by
9 SLIDES
1714 VUES
410LIKES

work method statement for construction works

DESCRIPTION

Clear-Whs provide you work method statement for construction works for more details please call us at our toll free number 61283104079.Clear-whs Electronically with Smartphones/tablets instead of paper. Saving time, money, effort and hassle and remove the need for handling paper.For more information please visit our site:- http://clear-whs.com/<br>

1 / 9

Télécharger la présentation

work method statement for construction works

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript

Playing audio...

  1. Work method statement for construction works By fully complying with the current WHS legislation and using a system that forces, assures and proves that you and your workers are thinking pro-actively about risk and safety thereby reducing the risk of an accident. Electronically with Smartphones/tablets instead of paper. Saving time, money, effort and hassle and remove the need for handling paper. Website:- www.clear-whs.com

  2. Construction phase plan • A description of the project such as key dates and details of key members of the project team. • The management of the work including: • The health and safety aims for the project. • The site rules. • Arrangements to ensure cooperation between project team members and coordination of their work, eg regular site meetings. • Arrangements for involving workers. • Site induction. • Welfare facilities. • Fire and emergency procedures.

  3. Benefits 1. WORK SAFER 2. WORK SMARTER 3. WORK CLEARER 4. CLEAR-WHS

  4. USP for Risk Product - No more paper copies of SWMS -  No more paper handling and storage -  SWMS sent electronically to a Mobile App -  SWMS signed on the APP by workers before the job starts -  SWMS date/time stamped when they are signed by the worker(s) -  Send the same SWMS for the same job to multiple workers -  Proof positive that the SWMS has been read before the job starts -  Protect the worker ensuring their safety at the work place -  Protect the Company by ensuring and proving the SWMS has been read before the job starts -  Faster delivery of SWMS electronically

  5. - Easily and quickly amend SWMS content and steps already created within minutes -  Use your own SWMS Master template for your company with your own format and logo -  Manage and maintain a full repository of created SWMS -  Send newly amended  SWMS through the system via the App in minutes to single or multiple workers -  Save time, effort and cost on preparing and delivering SWMS -  Save time, effort and cost on storing signed SWMS -  Easily and quickly attach signed SWMS to Invoices -  Monitor the status of SWMs to see which ones are still to be signed -  Monitor and maintain a full repository of signed SWMS -  App system sends the signed SWMS to the central repository as soon as it is signed

  6. Target Trades for Marketing of Risk System/Clear-Whs

  7. Real Estate and Property 1- Body corporate & Facilities Management 2- Maintenance  3- Retail & Property Development

  8. Trades & Services 1- Air conditioning and refrigeration 2- Building Trades 3- Carpentry 4- Cleaning  5- Electricians 6- Gardening & Landscaping 7- Handyman Services 8- Painters 9- Plumbers 10- Technicians

  9. Contact Us Contact Person:- Ed McMahom Business Email:- contact@hgsmachines.com Website:- http://clear-whs.com Address:- Address 71-75 Shelton Street, Covent Garden, London, WC2H 9JQ Mobile Number:- +61283104079

More Related