1 / 21

C9010-260 Exam Dumps from Dumpsbase

C9010-260 Exam Dumps from Dumpsbase are the latest version in the market, which can guarantee you success in the first attempt.

Télécharger la présentation

C9010-260 Exam Dumps from Dumpsbase

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. IBM C9010-260 Dumps Questions IBM Power Systems with POWER8 Sales Skills V2

  2. Question No.1 An application has a high availability requirement and is implemented with two local partitioned POWER8 servers and one remote partitioned POWER8 server. One local server runs production and replicates data to the backup local server. The backup local server replicates data to backup remote server. What is the minimum number of HMCs required to support the sites? A. 4 B. 2 C. 3 D. 1 Answer: B

  3. Question No.2 A customer needs to support an HPC cluster, and needs the maximum number of cores in a standard 19 inch rack. The customer can run either AIX or Linux. Which POWER8 server best satisfies the requirement? A. S824 B. S822 C. S822L D. S824L Answer: A

  4. Question No.3 What is a limitation of the 4-core S814 model once installed? Inability to change the: A. change rack to tower B. operating system from AIX to Linux. C. disk controller from non-cache to cache D. attached tape drive from LTO-5 to LTO-6. Answer: A

  5. Question No.4 Customers need a 4-core S814 server, which requires 1TB available disk space run the ERP applications. Customers hope to achieve the lowest TCA, at the same time to minimize rack space. Which disk storage technology meet these requirements? A. SAN B. Flash C. Internal hard disk D. Internal solid-state disk Answer: A

  6. Question No.5 A customer with an AS/400 running S/36 code needs to migrate to a new P0WER8 system. They require a deskside solution. Which solution will satisfy the customer's requirements? A. S812L running IBM i 6.2 B. S814 running IBM i 7.1 C. S822 running IBM i 7.2 D. S814 running IBM i 6.1 Answer: B

  7. Question No.6 What kind of customers' needs will lead to propose 6-core S814, not 4-core S814 server? A. Fast Ethernet Adapter B. Large cache disk controller C. Fiber connections disk D. 96GB memory Answer: D

  8. Question No.7 A customer plans to implement a web-based solution that requires 34 Power cores. They want to acquire a POWER8 solution with the best TCA. Assuming all other configuration requirements are equal, which solution provides the best TCA? A. One E870 B. One S822 C. Three S814s D. Two S824s Answer: D

  9. Question No.8 A customer is migrating from a POWER6 570 to a POWER8 S824. Which technology will have to be replaced? A. FCoE B. SAS C. Fibre Channel D. SCSI Answer: D

  10. Question No.9 A customer has an application that requires the following: - 21 cores - 24 by 7 operation - High I/O bandwidth - Lowest TCO Which solution will satisfy the requirements? A. Two S822 B. Two S814 C. Two S824 D. One E870 with two client partitions Answer: A

  11. Question No.10 A customer has a BladeCenter S (BCS) with an 8-core POWER6 blade, 1 5TB of storage and an external LTO tape drive installed. They want to upgrade to a P0WER8. Which of the following is the lowest cost recommendation to satisfy their requirement? A. Flex System and POWER8 node B. S824 C. POWER8 blade in the current BCS D. S814 Answer: D

  12. Question No.11 PowerVM Enterprise Edition provides which availability function? A. High availability failover B. Live Application Mobility incase of a system failure C. Policy based workload relocation D. Live Partition Mobility Answer: D

  13. Question No.12 Which of the RAS features only on Power Enterprise Systems provide? A. ECC memory B. Chipkill memory C. FFDC (First Failure Data Capture) D.Double FSPs (Flexible Service Processor) Answer: D

  14. Question No.13 According to the new regulations, a Power Systems customer must be at a primary site with a minimum of 120 miles (194 kilometers) away from the place to set up a disaster recovery site. What the minimum of PowerHA solution should be suggested? A. Express Edition B. Standard Edition C. Enterprise Edition D. Geographic Edition Answer: C

  15. Question No.14 A client running Oracle databases is considering a Power solution. They want the highest level of reliability, performance, and support. Which operating system on Power should be recommended? A. Red Hat B. IBMi C. AIX D. SUSE Answer: C

  16. Question No.15 Customers have no internal IT support staff; they need to implement a whole solution including relational databases, industry-leading security solution, based on standard internet technology, home network and storage management capabilities. Which operating system is able to meet customer requirements? A. AIX B. IBM i C. LINUX D. Windows Answer: B

  17. Question No.16 Customers want to replace their existing x86 server cluster, the cluster is currently running Domino, Websphere application server, file services, print services, Cognos and DB2 databases. Which operating system can provide an integrated solution to meet customer requirements? A. Red Hat B. SUSE C. IBM i D. AIX Answer: C

  18. Question No.17 What is the PVU value of IBM dual socket lateral scale-out system? A. 50 PVUs per processor B. 70 PVUs per core C. 100 PVUs per scoket D. 120 PVUs per system Answer: B

  19. Question No.18 When customers run Linux and VMware on x86 systems, they want to add a S822L into a unified virtual environment. How Power options can meet the requirements? A. Implement appropriate KVM base version on Power and x86 systems. B. Implement Kimchi as a management interface to support the both environments. C. Convert VMware into PowerVM on x86 systems to ensure the consistency of Power Systems. D. Implement PowerVM and VMware, because both their function and management interface are shared. Answer: A

  20. Question No.19 Which of the following POWER8 server and NEBS (Network Equipment Building System) are compatible? A. S814 and S822 B. S824L and S824 C. S822L and S822 D. S822L and S812L Answer: C

  21. Question No.20 Which of the following RAS features on both the scale-out system and enterprise system are provided? A. CAPI B. redundancy FSPs C. CoD memory and core D. redundant power supply Answer: D

More Related