1 / 8

2018 Killtest E22-285 Real Exam Q&As

Killtest E22-285 Real Exam Q&As cover 100% of the E22-285 exam objectives set by EMC Certification. Killtest E22-285 Real Exam Q&As are prepared by IT professionals and industrious experts who have implemented their real life experience in E22-285 exam in order to provide candidate with the best E22-285 test product available in the market. By purchasing E22-285 Real Exam Q&As, you will have all that is necessary for completing the E22-285 exam with all E22-285 test questions and answers that are always up to date.

Emma2017
Télécharger la présentation

2018 Killtest E22-285 Real Exam Q&As

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Vendor: EMC Exam Code: E22-285 Exam Name: VxRail Appliance 4.x Deployment and Implementation Exam Version: Demo Killtest E22-285 Full Version: https://www.killtest.com/Product- Technology-Specific/E22-285.asp

  2. 22.You have been asked to install a 7 node VxRail single socket 1 GbE G Series cluster. The company has requested remote KVM support. How many RJ45 cables will be required? A. 14 B. 21 C. 28 D. 35 Answer: A 23.Which step is required to enable VxRail Manager capabilities to register the system, obtain product license files, update system software, download VxRail documentation, and browse VxRail Community? A. Enable the cluster/VDS/management accounts when using an external vCenter B. Enable EMC Secure Remote Support (ESRS) C. Configure VMware Secure Support Account (vSSA) access D. Set the Username and Password for the Support Account Answer: B 24.A company has a two chassis G Series cluster and wants to change the setup. This will require a reset of the chassis. What is the correct procedure? A. Reset both chassis simultaneously through the reset script B. Reset the primary chassis first, followed by the secondary chassis, through the reset script. C. Reset both chassis simultaneously with the mobile build server D. Reset the secondary chassis first, followed by the primary chassis, through the reset script.

  3. Answer: D 25.What is a consideration for using link aggregation on the Top of Rack (ToR) switch for a VxRail? A. Should not be used for VxRail node ports, but can be used for uplink and ISL B. Is not supported on the VxRail ToR switch C. Can be configured for any connectivity, but are not required D. Should always be configured for VxRail node ports to allow for failover Answer: B 26.In a 24 node Stretched Cluster VxRail deployment, what is the acceptable Rout Trip Time (RTT) latency between sites? A. Primary to witness site RTT latency: 10 msSecondary to witness site RTT latency: 10 msPrimary tosecondary site RTT latency: 10 ms B. Primary to witness site RTT latency: 50 msSecondary to witness site RTT latency: 50 msPrimary to secondary site RTT latency: 6 ms C. Primary to witness site RTT latency: 75 msSecondary to witness site RTT latency: 75 msPrimary to secondary site RTT latency: 1 ms D. Primary to witness site RTT latency: 75 msSecondary to witness site RTT latency: 150 msPrimary to secondary site RTT latency: 5 ms Answer: A Explanation: In most vSAN Stretched Cluster configurations, latency or RTT (Round Trip Time) between sites hosting VM objects and the witness nodes should not be greater than 200msec (100msec one-way).

  4. 27.Which step of the VxRail Initialization wizard may time out if the user does not proceed to the next step within 20 minutes? A. Build complete screen B. Review expected nodes list C. Review and validate D. Configuration of the VxRail Manager IP address Answer: C 28.What is a requirement for Top of Rack (ToR) switch VxRail node ports? A. Enable Spanning Tree B. Disable IGMP Snooping C. Enable IGMP Querier D. Disable Link Aggregation Answer: D 29.Which vSAN features are specific to an all-flash model VxRail? A. Erasure Coding and Stretch Clustering B. Thin Swap Objects and Stretch Clustering C. Deduplication/Compression and Thin Swap Objects D. Deduplication/Compression and Erasure Coding Answer: D : 30.To investigate a problem on a VxRail system, the onsite engineer has to collect the complete set of logs. Which method will collect all logs at once? A. Download https://:443/appliance /support-bundle

  5. B. Export vCenter system logs C. Run/mystic/generateFullLogBundlecommand in VxRail Manager CLI D. Click “Generate New Log Bundle” in the VxRail Manager GUI Answer: B 31.What is the maximum number of hosts supported in a VxRail Stretched Cluster? A. 15 B. 16 C. 31 D. 32 Answer: C 32.Where can the latest VxRail Pre-Installation Site Checklist be obtained for a new deployment? A. Service offering index B. VxRail Master Knowledge Base article C. SolVe D. EMC Support VxRail Answer: D 33.Which VxRail node type supports only hybrid storage? A. S Series B. E Series C. G Series D. V Series Answer: A Explanation:

  6. 34.Which software component is an optional add-on for VxRail? A. Dell EMC Secure Remote Support B. VMware vRealize Log Insight C. VMware vSAN D. VMware vRealize Operations Answer: D Day-to-day, all virtualization management is done within the familiar vCenter Server interface. Additional IT and Cloud automation can be provided with optional software like VMware’s vRealize Operations and vRealize Automation allowing you to seamlessly integrate VxRail as the foundation of your data center infrastructure. 35.A company has chosen to deploy an external vCenter/PSC. They would like to use the bundled vCenter license that comes with VxRail. What is the correct procedure to do this? A. Contact EMC Licensing to have a replacement vCenter license generated.Next, license the newly created vCenter.Last, deploy VxRail with external vCenter.

  7. B. Contact VMware Licensing to have a replacement vCenter license generated.Next, license the newly created vCenter.Last, deploy VxRail with external vCenter. C. Log into VxRail Manager through SSH and extract the vCenter license key from the application properties file.Next, license the newly created vCenter.Last, deploy VxRail with external vCenter. D. Bundled vCenter license is only valid when vCenter is internally deployed. The company must provide their own vCenter license. Answer: D 36.A workstation is being configured on the management VLAN (10.150.140.0/24) to connect to VxRail Manager for first time deployment. Configuring which IP addresses on the workstation will result in a successful deployment without having to change them during initialization? A. 192.168.1.199 and 10.150.140.100 B. 192.168.1.250 and 10.150.140.255 C. 192.168.10.199 and 10.150.140.255 D. 192.168.10.250 and 10.150.140.250 Answer: C 37.The Market Place on a VxRail Manager is empty on a newly deployed system. Testing shows that the Internet is reachable through proxy in the management network. Which action should be taken to correct this situation? A. VxRail Manager has no proxy support. B. Upgrade tolatest version and add proxy configuration manually. C. Manually add the proxy information in the VxRail Manager configuration D. Reset the appliance and redeploy with proxy information filled in the deployment process. Answer: B

  8. Killtest Exam Features Real Exam Q&As Real Exam Q&As 100% Passing Guarantee 100% Passing Guarantee PDF PDF + Software + Software One Year Free Update One Year Free Update Once Failed, Full Refund Once Failed, Full Refund Subscribe Killtest Youtube To Get More Exam Info Contact Us Mail: Mail: sales@Killtest.com Tel: Tel: +1 (315) 557 +1 (315) 557- -0907 FB Messenger: FB Messenger: seedfox68@yahoo.com Live Online Support Live Online Support Killtest would be the best choice for preparing your IT certification exams. Killtest would be the best choice for preparing your IT certification exams. Just come to Killtest to choose your wish to choose your wish exam. We ensure your success. exam. We ensure your success. 0907 Just come to Killtest

More Related