An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Department of the Navy Lean Six Sigma Way Ahead Nick Kunesh Special Assistant to the Secretary of the Navy Lean Six Sigma 16 May 2007

  2. NSPS Navy ERP LSS The pillars of Business/Financial Transformation are the tools we’re employing to get a better return on our investment in people, processes, and systems. The Financial Improvement Program (FIP) focuses on heightening the quality of financial information. DON Business Transformation Performance Driven Better Resource Decisions LSS NSPS Financial Improvement Plan - Measurement - - Standardization - and Internal Controls People Processes Systems Financial Improvement Program- Auditability and Internal Controls Accurate, Timely, and Transparent Financial Visibility

  3. DoN Total Obligation Authority (TOA) FY 07 DoN Budget O&M CVN-21 DDX LCS JSF MMA V-22 ACS LPD-17 EFV LHA(R) HLR Procurement 31% 26% RDT&E M&P FY06 TOA $125.6B 13% 30% $127.3B 65% is people cost

  4. Assign a CPI/LSS focal point to coordinate with the DoD CPI/LSS Program Office. • Establish a 12 to 18 month workforce training objective of 1% LSS black belt trained and 5% green belt trained personnel. Personnel selected should include top-rated staff members. • Include CPI/LSS in individual employee performance objectives. • Provide support to the DoD CPI/LSS Program Office in DoD-wide process improvement initiatives. • Report progress and outcomes of ongoing and completed CPI/LSS projects and activities to the DoD CPI/LSS Program Office every 30 days initially.

  5. SECNAV Lean Six Sigma Deployment Session27 June 2006

  6. DoN Lean Six Sigma Three Year Action Plan

  7. SECNAV’s Guidance for Senior Executive’s Performance Align Leadership Expectations With Workforce Accountabilities • SECNAV Values Leaders Who… • Excel At Business / Process Improvement • Deliver Solutions At Best Cost • Are Change Agents • Lead Based On Insightful Metrics • Use LSS To Improve • Cascade / Measure SECNAV Guidance Penetration Throughout Organizations

  8. THE SECRETARY OF THE NAVY Washington DC SECNAV SMR FEEDBACK May 08, 2007 MEMORANDUM FOR CHIEF OF NAVAL OPERATIONS COMMANDANT OF THE MARINE CORPS ASSISTANT SECRETARIES OF THE NAVY GENERAL COUNSEL SUBJECT: SECNAV Monthly Review (SMR) – Feedback from 4 May Session Thank you for the significant effort that you and your organizations have put into the SMR.All are making progress towards depicting Department of the Navy (DON) activities and programs in an understandable way, with clear indicators of priority and value. In particular, your listings of the “Top 5 Concerns” help focus our collective efforts to take future, meaningful action. I would like to discipline our discussions to center on the most significant issues, those of near-term interest as well as those of overall importance to the DON. I would encourage each of you to use the SMR forum to help assemble a cogent picture of the multi-faceted issues we face together. I asked you last month to improve metrics, and many improvements are evident. Navy is commended for their progress in the Warfare Enterprise areas, clearly the product of hard work and careful analysis. Marine Corps depiction of Readiness is comprehensive and intuitive. ASN (RD&A) milestone charts place key points in context and timescale. ASN (FM&C) depicted complex reprogramming actions in an easily understandable way. In as many areas as possible, metrics and measures used at the SMR should be built on an “information” basis, assembling or depicting data in a structured way that builds insight. Continue to focus efforts on metric improvements in this regard for the next session. The improvements in DON metrics adds to the “measure” step in the DMAIC process which underpins SMR. Continue to press your organizations to improve SMR based on our individual discussions last month. Though the turn-around is quick, I would ask you to reflect our agreements in the June SMR reports. As much as possible, I ask you to address the “Top 5 Concerns” by ensuring that the strategy to improve each one is clearly depicted in the SMR with its accompanying metrics. Many of the “Top 5” concerns should also be addressed using Lean Six Sigma (LSS) precepts, either for the effort itself or for its underlying processes. Where that is the case, the LSS effort should be clearly depicted, as well. Several good examples were discussed in the latest session: Navy efforts in SEAL recruiting and training; ASN (M&RA) Comprehensive Casualty Care; Marine and ASN (RD&A) efforts in delivering Mine Resistant Ambush Protected (MRAP) vehicles. I want to understand how you are using LSS to move your organizations forward. To that end, LSS reporting should continue to document training progress to support our reporting responsibilities to OSD in the DoD enterprise LSS effort. High Impact Core Value Streams should also continue to be reported. Details of those Lean Six Sigma efforts should be clearly depicted in the SMR report, either in the separate LSS section or in the details of the reporting of the activity, as best suits. Underutilized Green and Black Belts should be assigned to Lean Six Sigma activity relative to your “Top 5 Concerns” or our department goals and objectives. Attachment (1) lists actions for specific organizations. Please find the best approach to address them before our next session on 15 June. The SIPRNet SMR Quickplace web-site is populated with the May SMR report, as well as archived reports from previous months for your personal use. Please contact Mr. Griffes, Mr. Ferko, or Mr. Tesch for further assistance. Donald C. Winter

  9. CNO Guidance for 2007 2 February 2007 Focus on Execution Each objective will be pursued using discrete, measurable goals. The accountable Executive Agent is listed: “Develop effective business strategies for the day-to-day management of Navy processes through the use of Lean Six Sigma and other business practices (DNS)" The Director of Navy Staff will develop an execution plan for the achievement of this objectives within 60 days. The Vice Chief of Naval Operations will review and approve the execution plan.

  10. Lean Six Sigma Champions Trained or Scheduled% of Direct Reports and 1st Tier 92% (average) Secretary of the Navy 100% Under Secretary of the Navy 100% 100% 100% 100% 100% ASN (RD&A) ASN (M&RA) ASN (FM&C) ASN (I&E) OGC 74% 90% CNO CMC 8 Dec 06

  11. DoN Lean Six Sigma (LSS) Journey SECNAV Directs roll-out across all DoN Service, Support and Transactional Activities. DoD Senior Leadership Directs Use of LSS ASN RD&A Directs Use of LSS 2007 2006 2005 Navy and USMC Industrial Base Demonstrates Output From LSS 2004 2003 TQL/TQM ISO 9000 2002 2001 2000 Transactional Projects Yield Output LEAN Events on Three AIRCRAFT CARRIERS 1999 NAVSEA Task Force Lean 1990 DEPOTS and SHIPYARDS COMMENCE LEAN NAVAL AVIATION ENTERPRISE NAVAIR HQ AIRSPEED

  12. Transformational Team Leaders (TTL) Forum LSS Network DON LEAN SIX SIGMA Team and Process Flow Financial Harvesting WG Jim Brice, SES NAVSEA Education & Training WG RDML Skinner NAVAIR WG #1 WG #2 CNO CMC UNDER RD&A TTL Chair Nick Kunesh SECNAV SA, LSS FM&C M&RA I&E GC WG #3 WG #5 Metrics WG CAPT Snedeker SECNAV OPA Tools WG CAPT Stabile NAVAIR WG #4 Communications WG Steve Santos, GS-15 NAVSUP Four Outputs: 1. Knowledge Based Sharing 2. Training Standardization 3. Roll Out Scalability 4. Financial Harvesting

  13. FWG Membership Executive Leader:Value Stream Champion Mr. Nick Kunesh, SECNAV SA Ms. Caral Spangler ASN (FM&C) Team Leader:Black Belt: Mr. Jim Brice, SEA TFL Ms. Chris Cummings, NAVAIR Team Members Sally Reams, ASN (FM&C) David VanDornick, Mike Hansley, Susan Yang, NAVSEA Capt. Bob Novak, NAVAIR Dale Criswell, NAVSUP Bob Kamensky, Greg Hansford, Tom Straughn, SPAWAR Dave Clifton, Pat Lynch, USMC Katherine Clark, NAVAUDSVC Carla Moore, PEO(IS) Gary Younes, DASN (CHR)/OCHR Cdr. Duane Schatz, Junius Wright, (ONR) Oscar Friedman PEO(LMW) Capt Chuck Mingonet, Cdr Steve Evans, OPNAV N8 Gloria Tuck, OPNAV N4 Heidi Bopp, ASN(M&B)

  14. Benefits Categorization Types 1, 2, and 3 (Phase 1) • Type 1:Permanent cost reduction identified to BLI(s) (Hard Savings)* • Example: Elimination of non-labor cost; reduced CSS Support; elimination of whole work-year(s) and associated billets • Type 2:Potential cost reduction from decreased cycle times or improved equipment/space utilization(Soft Savings)* • Example: Improved resource utilization to produce a product (work-year reduction, but does not eliminate a billet, improved capital equipment utilization, partial footprint reduction) • Type 3: Other benefits(Cost Avoidance)* • Example: Improves safety, customer satisfaction, quality, and work-life. No financial validation required *(Industry Equivalent Terms)

  15. Financial Benefits Validation Process – Phase 1 Project Charter Pre-Launch Define Measure Analyze Improve Control Validate Start End (R/A) Updates DMS (R) Projects Financial Benefits & Enters project into DMS (R/A) Updates DMS DC (R) Calculates and completes initial FBW (as-is) baseline data (DMS Metric 2) (R) Completes FBW with Manpower and BLIs (DMS Metrics 3&5) (R) Examines expected benefits during define phase. Reviews/ updates project charter. Ensures benefits are realistic. (R) Prints out FBW and the “FR Documentation of Review Sheet” and brings to TG. (R) Updates project charter benefit estimate if root cause analysis results in any change. (R) Requests FR from SFL (Electronically) (R) Updates FBW (Non-Recurring and To-Be Costs) (DMS Metric 2) (R) Contacts FR for planning purposes Belt (R) Electronically notifies FR of FBW to be reviewed/validated early in Control Phase. (NLT 2 weeks before tollgate) (R) Identifies the appropriate FSME and informs FSME and Belt (R/A) Validates Process and Financial Benefits PS (R/A) Notifies Customers of Financial Impact to BLIs (R) Reviews FBW and inserts comments on the “FR Documentation of Review Sheet”. (Locks Estimate in DMS) (R) Reviews charter for familiarization. (R) Validates Financial Benefits (Locks Actuals in DMS) FR (R) Reviews project charter and assigns FR. Informs Belt, FR, PS and DC. SFL Key: DC Deployment Champion (Lean Champion) PS Project Sponsor (Value Stream Champion) FR Financial Representative (Independent Reviewer) SFL Site Financial Lead CLFR Command Level Financial Rep FSME Financial Subject Matter Expert (R/A) consolidates & reports Command Type 1 & Type 2 Benefits CLFR FSME Assists Belt with compilation of financial information

  16. Leveraging Financial Benefits – Phase 2 ExecutionYear BudgetYear Out years Start Key: CLFR: Command Level Financial Rep PM: Program Manager/Responsible Manager PEO: Program Executive Officer Ent: Enterprise FMB: Navy Comptroller (ASN/FM) CNO/CMC Chief of Naval Operations /Commandant Marine Corps (OPNAV) 1B Disseminates Type 1 Benefits by BLI for all Fiscal Years and identifies as Type A or B PBIS Report CLFR 1A Enterprise is defined as follows: For Navy: Fleet Readiness Enterprise for Current Readiness and Provider Enterprise for Future Capabilities & Support of Current Readiness. For MC: Deputy Commandants, MARFOR Commanders, Commander MCSC and Director C4I. PM/PEO Reprioritizes and Reprograms Type 1A Benefits in YOE PM/PEO/ OPBUD HOLDERS PM/PEO Informs Appropriate Enterprise and CNO of Benefits Enterprise keeps Book on BY Benefits - Offsets Congressional Reductions or Holds for Execution Year Enterprise Informed of BY Benefits Enterprise Reprioritizes & Reprograms and Informs CNO/CMC Enterprise: Provider or Fleet Readiness CNO/CMCACMC, DC PROG & RES. CNO/CMC Informed of outyear benefits CNO/CMC Prioritizes & Structures Budget in POM Years CNO/CMC Informed FMB Approves via normal BTR or ATR process FMB Approves via normal BTR or ATR Process FMB

  17. Department of the Navy Lean Six Sigma Density & Event Metrics As of Feb 07

  18. Standardization of Definitions Standardize the terminology of specific CPI programs DoN definitions have been approved for Lean, Six Sigma, Theory of Constraints (TOC) and Kaizen. Lean:A systematic methodology for continuous process improvement based on the principles of customer value, waste elimination, and pursuit of process perfection. Lean is unique from traditional process improvement strategies in that its primary focus is on eliminating non-value added activities and creating flow and pull in the value added activities. A major result of Lean is an improvement in cycle time. Lean attacks waste. Six-Sigma:A systematic methodology for process improvement that focuses on reducing variation, producing highly repeatable processes, and creating customer satisfaction. Six-Sigma utilizes the Define-Measure-Analyze-Improve-Control (DMAIC) methodology to make process change through disciplined use of facts, data, and statistical analysis and control of existing processes. It also includes an understanding of customer needs and diligent attention to managing, improving, and reinventing business processes. Six-Sigma attacks variation. Theory of Constraints (TOC): A systematic approach to optimize resource utilization by identifying, exploiting, subordinating, elevating and reassessing constraints in the process. Scientific principles are applied as a set of logical thinking processes to develop transformational, breakthrough business solutions. A constraint is any resource whose capacity is less than the demand placed upon it. TOC attacks constraints and barriers (a restriction or other block to increases in output). Kaizen (also known as “Kaizen Event”):A Japanese term meaning “Continuous Improvement”. In Lean Six-Sigma terms, it refers to a highly focused, short-term rapid improvement event performed by cross-functional teams at the work-group level that identifies and removes waste from a process. Good Kaizen events follow the Define-Measure-Analyze-Improve-Control (DMAIC) recipe, can be performed quickly (usually less than two months), and involve the use of basic Lean Six-Sigma tools to implement process improvement solutions. Kaizen is focused on rapid improvement.

  19. Black Belt Training Certification Process (Approved) Testing Training Projects Teaching/ Other Mentoring Min 160 hrs over min four (4) weeks covering Navy-wide Body of Knowledge (BOK) including project work Comprehensive (to BOK) Training Completion Test with >75% passing score and allowance for one (1) retest. DoN ASQ Certification Exam encouraged. Successful (signed off final tollgate) completion of: two (2) LSS Full DMAIC projects minimum 3-6 month projects and one (1) RIE/ KAIZEN event Mentor two (2) GBs through one project each or three (3) RIEs/KAIZENs for each Certification by each Command's Head of LSS Office or Approval Board Green Belt Training Certification Process (Approved) Training Testing Projects Other Min 40 hrs covering Navy-wide BOK for GBs including project work Comprehensive (to BOK) Training Completion Test w/ >75% passing score and allowance for one (1) retest. Successful (signed off final tollgate) completion of: two (2) LSS Full DMAIC projects (minimum 2-4 month); or four (4) RIEs/ KAIZENs; or one (1) LSS and three (3) RIEs/ KAIZENs None Certification by each Command's Head of LSS Office or Approval Board Standardize DoN certification process for Mentoring

  20. DoN/ASQ Lean Six Sigma (LSS) Black Belts

  21. Lean Six Sigma Software Tools • iGrafx Process for Six Sigma • LSS expert/Black Belt/Green Belt process mapping and analysis tool • Optimizes processes via modeling and simulation capability • Captures knowledge (value stream and process maps) for sharing and enabling replication • Minitab • Statistical software designed to support Lean Six Sigma and other quality improvement projects • Integrates seamlessly with iGrafx • Deployment Management System (DMS) • Web-based application for managing enterprise-wide Lean Six Sigma deployment • Currently in Phase I deployment at NAVAIR

  22. Lean Six Sigma Improvements for CVN-21 Milestone B

  23. TEMP ILA CARD VAR II LFT&E C4ISR PLCCE CVN-21’s Milestone B Documentation Effort • 7 CVN-21 MS B documents analyzed: • Man-hours expended: 245,742 • Total cost: $18.4M Total review touch points: 6,952 • Non value add (NVA) touch points: 6,654 • 56 different organization ‘touch-points’ • Average number of organizations touched per document = 22 • NVA cost: $11.171M (96%) • NVA man-hours: 148,939 Team’s Perspective $11.17M NVA touch points Note: Above data based on CVN-21 Milestone B complexity analysis. NVA determined from CVN-21 team perspective.

  24. CVN-21’s Milestone B TEMP Time and Motion Study • TEMP Doc Data Summary • Queue Time: included in NVA routing + 26 days for approvals • Total Man-hours: 16,612 • Total Cost: $1.246M • Total Arrows: 377 • VA = 47 (12%) • NVA = 330 (88%) • NVA Cost = $1.091 Note: Arrows represent review loops, red are non value added, black are value added.

  25. Current State Analysis 41 day average flow time 51 Hand offs 1% first pass yield 40% submitted electronically Five serial reviews Future State Solution 5.4 day average flow time 11 Hand offs 74% first pass yield 100% submitted electronically Three serial reviews Justification and Approval (J&A) ProcessRapid Improvement Event Goal:Reduce J&A flow time and rework; increase review time flexibility • Streamlined process • Increased automation -all reviews electronic --instant receipt notification • Reduced serial reviews / rework • Content requirements communicated to SYSCOM; submittal templates created

  26. Justification and Approval (J&A) ProcessRapid Improvement Event/Value Stream Mapping

  27. Pre-VSA State 30 plus steps (all serial) 16 queues 8 work-arounds Multiple hard copies 12 review and approval steps 28 day average processing time Current State Solution 15 steps (4 performed concurrently) 4 queues No work-arounds Fewer hard copies 5 review and approval steps 4 day average processing time BFMC Lean Pilot SolutionOutcomeReimbursable Funding Documents to NAVAIR Field Activities • Moved downstream activities up front • Brought all parties to table – expanded IPT • Removed WAIT time (queues) • Ensured complete and accurate product early • Reduced rework/rejects • Leveraged ERP ensuring all financial links match project plan to performing activity

  28. Summer Hire ProcessNAVAIR AIRSpeed Type Study: KAIZEN Goal: Streamline and reduce costs of summer hire program Pre-VSA State • 4,000 man hours expended to execute process • 24 Process Steps • 70 day Process Cycle Time • $12.8K per recruit • Voice of Customer not identified Current State • 1,000 man hours expended to execute process • 4 process Steps • 45 day Process Cycle Time • $2.4K per recruit • Voice of Customer integrated Savings: One man-year in labor, faster, simpler, customer friendly

  29. SECNAV Congressional Response Process Kaizen Project Problem/Goal Statement Business Impact Problem: Currently Department of Navy Congressional Responses are not meeting internal Navy cycle time requirements of 7 work days and the quality of the responses is not consistent. SECNAV has established the ASN (I&E) project as a prototype for replication purposes. Since the beginning of 2006, the mean ASN (I&E) Process Cycle Time has been 17.8 work days. Scope: The scope of this project will include the response categories of: Congressional Constituent, Congressional Member of Congress. Goal: Decrease the mean Process Cycle Time from 17.8 to 7 work days. • Financial Impact • Type I Savings – none anticipated at this time • Type II Savings – TBD • Non-Quantifiable Benefits • Better customer relations with Congress Core Team Timeline • Dr. Donald Winter Project Sponsor/Process Owner/Green Belt • CDR Jim Aiken Deployment Champion • Phil Zalesak Black Belt • Steve Bonacorsci Master Black Belt Core TeamRoleLSS Training • LT Ball SME Yellow Belt • Catherine Timco SME Yellow Belt • YN1 Suggs SME Yellow Belt • Alan Anglin SME Yellow Belt • Jim Ives SME Yellow Belt • Denise Brown SME Green Belt • Oral John SME Green Belt Extended Team • TBD (ASN I&E) • EventDate • Initial tasking 7/6 • Scoping 7/17 – 8/23 • Kaizen preparation 8/24 – 9/9 • SECNAV Brief 9/12 • Kaizen 9/18 – 9/21 • Implementation 10/2