An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Compiled By: A. Murugesan_Quality_ ZF Wind Power_ Coimbatore How to Calculate the OEE??? • What is mean by OEE??? • What is mean by NAT??? • What is mean by NOT??? • What is mean by IOT??? • What is mean by LOT???

  2. Compiled By: A. Murugesan_Quality_ ZF Wind Power_ Coimbatore • OEE=> Overall Equipment Effectiveness • NAT=> Net Available Time = (Scheduled production time- Planned down time ) • NOT=> Net Operating Time = ( Net available time- Unplanned down time ) • IOT=> Ideal Operating Time = ( Time to produce all parts at rate ) • LOT=> Lost Operating Time = ( Due to production of scrap or non saleable product.

  3. Compiled By: A. Murugesan_Quality_ ZF Wind Power_ Coimbatore • OEE Comprised of 3 Factors. • Availability • Performance • Quality

  4. Compiled By: A. Murugesan_Quality_ ZF Wind Power_ Coimbatore Formulae's • Availability % = (NOT/ NAT) * 100 • Performance % = (IOT/ NOT) * 100 • Quality % = (IOT- LOT) / IOT * 100 • OEE = Availability* Performance* Quality Note: You will notice that a quick way to check your OEE result is to calculate the time required to make good parts divided by the net available time. • OEE = IOT-LOT/NAT

  5. Compiled By: A. Murugesan_Quality_ ZF Wind Power_ Coimbatore Examples: OEE = (IOT-LOT) /NAT = 373.33-8.33/455*100 = 80.21 %

  6. Compiled By: A. Murugesan_Quality_ ZF Wind Power_ Coimbatore Thank You for your attention