Implementing Lean Six Sigma at the Yellow Belt level isn't about rewriting the company bylaws; itu2019s about incremental wins. You are the "eyes and ears" on the shop floor or in the office.

Tharun12
Télécharger la présentation

How to Implement Lean Yellow Belt Six Sigma Principles

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. How to Implement Lean Yellow Belt Six Sigma Principles Implementing Lean Six Sigma at the Yellow Belt level isn't about rewriting the company bylaws; it’s about incremental wins. You are the "eyes and ears" on the shop floor or in the office. To implement these principles effectively, follow this tactical 5-step approach. Step 1: Identify the "Low-Hanging Fruit" Don't try to solve world hunger. Look for small, repetitive annoyances that affect your daily work. The "Pain Point" Test: Ask your team, "What is the most frustrating part of your Monday morning?" The Waste Walk: Take a literal walk through your workspace and look for DOWNTIME (the 8 wastes). If you see a pile of paper waiting for a signature, you’ve found Waiting and Inventory. Step 2: Use the 5S System (The Quickest Win) This is the most visible way to implement Lean. It turns a chaotic workspace into a functional one. 1.  Sort: Get rid of what you don't use. 2.  Straighten: A place for everything, and everything in its place. 3.  Shine: Clean and inspect the area. 4.  Standardize: Create a checklist so everyone keeps it that way.

  2. 5.  Sustain: Make it a habit. Step 3: Measure the "Before" Before you change anything, you need a baseline. You cannot prove you improved something if you don't know how bad it was to start with. Data Collection: Keep a simple tally sheet. (e.g., "How many times did the software crash today?") Cycle Time: Time how long a specific task to start to finish. Step 4: Map the Process (The "As-Is" State) Sit down with the people who actually do the work and draw a Value Stream Map or a simple Flowchart. Highlight Non-Value-Added steps: These are steps the customer wouldn't pay for (like moving a file from one folder to another just to store it). The "Post-It" Method: Write every step of a process on a sticky note. Physically move them around to see where the "bottleneck" (the backup) is happening. Step 5: Run a "Plan-Do-Check-Act" (PDCA) Cycle Instead of a massive rollout, run a small experiment. Plan: "I think if we move the printer closer, we'll save 10 minutes a day." Do: Move the printer for 48 hours. Check: Did we actually save time? Did it cause a new problem? Act: If it worked, bolt it down. If not, try something else. Comparison: Why Yellow Belt Implementation is Different Feature Yellow Belt Approach Black Belt Approach Focus Local, day-to-day tasks. High-level, cross- departmental. Tools 5 Whys, 5S, Checksheets. Regression analysis, ANOVA, DoE. Timeline Days or weeks. 3 to 6 months. Goal Consistency and waste reduction. Statistical variance reduction.