1 / 17

TWIN-ENGINE HELICOPTER OPERATIONS

TWIN-ENGINE HELICOPTER OPERATIONS. WHY A TWIN?. Direct routings in urban areas: saves time Can do Commercial Air Transport at night Can fly IFR (cloud/low visibility) subject to temperature and pilot qualification/training Operates to smaller landing sites than single-engine helicopters

Thomas
Télécharger la présentation

TWIN-ENGINE HELICOPTER OPERATIONS

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. TWIN-ENGINE HELICOPTER OPERATIONS AV8 Helicopters Ltd

  2. WHY A TWIN? • Direct routings in urban areas: saves time • Can do Commercial Air Transport at night • Can fly IFR (cloud/low visibility) subject totemperature and pilot qualification/training • Operates to smaller landing sites than single-engine helicopters • Can be used for over-water CAT flights AV8 Helicopters Ltd

  3. TWIN ENGINE: ENHANCED OVERALL SAFETY AND OPERATIONAL FLEXIBILITY THE AIRCRAFT OF CHOICE FOR CORPORATE AND EXECUTIVE WORK AV8 Helicopters Ltd

  4. PROS AND CONS OF COMMON LIGHT TWIN HELICOPTERS • Agusta 109: sleek, fast, up to 7 pax seats • EC 135: state of art, quiet, high capital cost, not • widely available, but lower DOC than some • MD 902 Explorer: ‘NOTAR’ high capital costs, • history of technical and support difficulties • Bell 427: unusually for Bell, has not been a • commercial success • AS355 Twin Squirrel F1/F2/N: easy availability • predictable DOC, good cabin configurations AV8 Helicopters Ltd

  5. TWIN SQUIRREL • AS 355-F1: 2 x RR Allison Engines, 2400 kg MAUW • AS 355-F2: 2 x RR Allison Engines, 2540 kg MAUW • AS 355-N: 2 x TM Arrius Engines, 2600 Kg MAUW AV8 Helicopters Ltd

  6. Agusta 109 Power 2 x PW206 or Arrius 2 Engines, 2850 Kg MAUW AV8 Helicopters Ltd

  7. COMPARISON OF COMMON SINGLE ENGINE AND TWIN ENGINE HELICOPTERS: PAYLOAD AND RANGE Typical Weights will vary with standard of equipment and cabin layout/trim AV8 Helicopters Ltd

  8. AGUSTA A109E POWER SERIAL NO 11011 REGISTRATION NO 5N-BGX (Former N108WP, N27BD) AV8 Helicopters Ltd

  9. AV8 Helicopters Ltd

  10. AV8 Helicopters Ltd

  11. AV8 Helicopters Ltd

  12. A109-Power 5N-BGX AV8 Helicopters Ltd

  13. AV8 Helicopters Ltd

  14. AV8 Helicopters Ltd

  15. Survey Findings # 2 engine intake shroud burnt/corroded Oil leak in gearbox well area Play in # 2 eng. Mounts L.H. brake calliper leaking, main wheel contaminated # 1 U/C actuator weeping Mandolin frame repair – check safety of Hi-locks T/R pitch change mechm. fixed link (pt.no. 109-0130-60-109) worn T/R connecting link (2 off) [pt.no. 109-0133-04-105] worn to limits 0.25 inch crack in frame 8339.3 (ADF access panel, looking aft) T/R/D/S bearings, rubber dust shields show signs of distress ECS scat tube holed P1 heater control knob missing Very noisy fuel boost pump Fuel Qty. indications mismatch (124/93 Kgs) DME/Indicator inop. ASI discrepancy (130/115 Kts.) AV8 Helicopters Ltd

  16. PENDING TECHNICAL BULLETINS • BT- 39 (Batt. Bus, Compliance due 31/03/04) • BT- 40 (Radio Master Sw., Compliance due 31/12/03) • BT- 41 (Emer. Bus relay. Repetitive?) • BT- 42 (Oil cooler hose, Compliance due 31/08/05) • BT- 43 (M.G.B attach. Hardware, Compliance due 30/09/04) • BT- 46 (Relocate ELT aerial, not mandated by National Authority, but is in Europe) • BT- 56 (Pitot heater, optional) • ITEMS SHORTLY DUE • BT - 57 (Audio warning panel, Compliance due 28/02/06) • BT - 59 (ECS overheat, Compliance due 30/09/06) • BT - 60 (U/C actuators, Compliance due 31/12/06) • BT - 61 (CAD’s, Compliance due 31/03/06) • BT - 63 (Fire control panels, Compliance due 30/04/06) • BT - 66 (Generator loom, Compliance due 31/07/06) AV8 Helicopters Ltd

  17. QUESTIONS? AV8 Helicopters Ltd

More Related