SPECTROMETER(S) Prospects for a New Neutrino CERN-PS Experiment:. NESSiE. N eutrino E xperiment with S pectrometer S i n E urope. Technical Proposal jointly submitted to SPS-C: arXiv:1230.3432, April 2012. Experimental motivations.

1 / 17

Télécharger la présentation

NESSiE

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript

Playing audio...

  1. SPECTROMETER(S) Prospects for a New Neutrino CERN-PS Experiment: NESSiE Neutrino Experiment with SpectrometerSin Europe Technical Proposal jointly submitted to SPS-C: arXiv:1230.3432, April 2012 Alessandro Bertolin / Luca Stanco - CdS Padova

  2. Experimental motivations • In the last decade a set of experimental results challenged the 3 n framework no one conclusive, but all pointing toward the same direction LSND MiniBooNE n and n-bar Gallium MCi exposure Cosmology Reactor n-bar anomaly

  3. A conclusive experiment A coupled system of LAr detector + muon spectrometer for • Observation ofall reaction channels(nm, ne; CC, NC)through the uniqueLAr-TPC imagingcapabilities • Charge separationand muon momentumextension with amagnetized ironspectrometer • Different sitesnear (300 m) + far (1600 m)

  4. Where: CERN North Area • 100 GeV primary beam fast extracted from SPS • Target station next to TCC2 • Decay pipe: L =100 m, ø = 3 m • Beam dump: 15 m of Fe with graphite core, followed by μ stations • Neutrino beam angle: pointing upwards, at -3m in the far detector, ~5 mrad slope

  5. The ICARUS-NESSIE Collaborators M. Antonello1, D. Bagliani2, B. Baibussinov5, M. Benettoni5, P. Bernardini25,26, A. Bertolin5, H. Bilokon6, F. Boffelli8, M. Bonesini9, C. Bozza31, R. Brugnera4,5, E. Calligarich8, N. Canci1, A. Cecchetti6, S. Cecchini24, S. Centro4,5, A. Cesana10, K. Cieslik11, D. B. Cline12, A. G. Cocco14, G. Collazuol5,6, P. Creti26, F. Dal Corso5, I. De Mitri25,26, D. Dequal4,5, A. Dermenev15, G. De Robertis22, M. De Serio22, L. Degli Esposti24, D. Di Ferdinando24,R. Dolfini7,8, M. De Gerone2,3, U. Dore28,29, S. Dusini5, S. Dussoni2,3, P. Fabbricatore3, C. Fanin5, C. Farnese4, A. Fava5, A. Ferrari16, R. A. Fini22, G. Fiore26, G. Fiorillo13,14, A. Garfagnini4,5,G. T. Garvey17, F. Gatti2,3, G. Giacomelli23,24, R. Giacomelli24, D. Gibin4,5, S. Gninenko15, G. Grella30, C. Guandalini24,F. Guber15, M. Guerzoni24,A. Guglielmi5, M. Haranczyk11, J. Holeczek18, A. Ivashkin15, M. Kirsanov15, J. Kisiel18, I. Kochanek18, U. Kose5, A. Kurepin15, J. Łagoda19, G. Laurenti24, M. Laveder4,5, I. Lippi5,F. Loddo22, A. Longhin6, P. Loverre28,29,G. Lucchini9, W. C. Louis17, G. Mancarella25,26, G. Mandrioli24, S. Mania18, G. Mannocchi6, S. Marchini5, A. Margiotta23,24, G. Marsella26,27, V. Matveev15, N. Mauri6, E. Medinaceli4,5, A. Menegolli7,8, G. Meng5, A. Mengucci6, M. Mezzetto5, R. Michinelli24, G. B. Mills17, C. Montanari8, M. T. Muciaccia21,22, M. Nicoletto5, D. Orecchini6, S. Otwinowski12, T. J. Palczewski19, A. Paoloni6, G. Passardi16, A. Pastore21,22, L. Patrizii24, F. Perfetto13,14, P. Picchi6, F. Pietropaolo5, P. Płoński20, M. Pozzato23,24, A. Rappoldi8, G. L. Raselli8, R. Rescigno30, G. Rosa28,29, M. Rossella8, C. Rubbia1,16, P. Sala10, A. Scaramelli10, E. Segreto1, S. Simone21,22, M. Sioli23,24, G. Sirri24, M. Spurio23,24, L. Stanco5, S. Stellacci30, D. Stefan1, J. Stepaniak19, R. Sulej19, A. Surdo26, O. Suvorova15, M. Tenti23,24, M. Terrani10, D. Tlisov15, V. Togo24, R. G. Van de Water17, G. Trinchero6, M. Turcato5, F. Varanini4, M. Ventura6, S. Ventura5, C. Vignoli1, H. G. Wang12, X. Yang12, M. Zago5, A. Zani8 and K. Zaremba20.

  6. Produced documentation so far • Relevant documents sent to SPS Committee by the ICARUS and NESSiE Collaborations: • a Memorandum from the ICARUS collaboration (SPSC-M-773) of March 9, 2011 • Proposal “A comprehensive search for <<“anomalies>>” from neutrino and anti-neutrino oscillations at large mass differences (Dm2 ≈ 1eV2) with two LAr–TPC imaging detectors at different distances from the CERN-PS” (SPSC-P-345) of Oct. 14th, 2011;·   •   Proposal “Prospect for Charge Current Neutrino Interactions Measurements at the CERN-PS” with two magnetic spectrometers for measuring CC neutrino interactions (SPSC-P-343) of Oct. 11th, 2011; • Joint Technical proposal: “Search for “anomalies” from neutrino and anti-neutrino oscillations at Dm2 ≈ 1eV2 with muon spectrometers and large LAr–TPC imaging detectors”(SPSC-P-347) of March 15th, 2012.

  7. Beam Studies at SPS • 100 GeV proton, Fast Extraction (10.5 ms), Luminosity as at CNGS (conservative) On-Axis !! CC muons CC electrons Scenario defined for DATA Taking: 2 years of anti-n followed by 1 year n

  8. NESSiE detector concept NESSiE (Neutrino Experiment with SpectrometerS in Europe) • Goal: • Allow charge separation and momentummeasurement of as many muons as possibleescaping from LAr (large statistics ↔ low sin22q) • Go as low as possible in muon momentum(low momenta ↔ low Dm2) • Possibility to also study (NESSiE) internal events(coarser resolution w.r.t. LAr) • Solution: • Air-core magnets for low momentum muons escaping from LAr(Em < 0.5 GeV/c in NESSiE ↔ En < 1 GeV in LAr) • Downstream massive iron dipolar magnets for higher momenta extension Statistics Dm2 Spectrun sin22q

  9. Air-core magnet • New concept for a largetransverse area magnetic fieldin air (~40 m2) • B = 0.15 T • Power < 2 MW • To be coupled to a mm detector(different possibilities under study)

  10. NESSiE iron dipolar magnets B = 1.5 T Coils 1800 + 700 m2 of RPC 20000 + 12000 digital channels 586 cm 410 cm 875 cm detector layers B B NEAR FAR

  11. Detector configuration (far position) ACM dipolar (1 arm) dipolar (2 arms) Charge mis-reconstructionat few percent level in alldynamical range of interest (full simulation includingselection, efficiency andrecontruction) n Picture credits: G. Sirri

  12. NESSiE time schedule • Physics proposal submitted to SPSC in Oct 2011 [arXiv: 1111.2242v1] • In the meanwhile: • Request to switch PS ↔ SPS • Joint technical proposal submitted to SPSC in March 2012 [arXiv:1203.3432] • From green-light, we expect 3 years of prototyping and construction run in 2016

  13. Actions in the near future SEPTEMBER: evaluation at European Strategy Group (CERN) evaluation at Research Board evaluation at CN-II OCTOBER: submission to CTS JANUARY: requests s.j. (A) for Prototypes and Technical Studies End 2013: requests s.j. (B, extra CN-II) for starting tenders Alessandro Bertolin / Luca Stanco - CdS Padova

  14. NESSiE Collaboration Bari: 0.6 FTE/3 Bologna: 2.0/5 Frascati: 0.5/2 Lecce: 3.2/7 TOTAL: 10.7 FTE / 29 people Padova: 3.8/9 Roma1: 0.6/3 almost factor 3 in FTE with respect last year • In the near future: • joint submission to EuropeanStrategy for • R&D for far future LBL • enlarge Physics investigation in case of discovery Alessandro Bertolin / Luca Stanco - CdS Padova

  15. Coinvolgimenti: BARI: Simulazione, Front-End BOLOGNA: Simulazione, Software, DAQ, Disegno, Meccanica FRASCATI: Simulazioni, Disegno, Rivelatori, Meccanica LECCE: Rivelatori, Meccanica, Front-End, DAQ PADOVA: Simulazione, Disegno, DAQ, Meccanica ROMA-1: Simulazione e Software Alessandro Bertolin / Luca Stanco - CdS Padova

  16. NESSiE Gruppo di Padova: M. Benettoni (30%) A.Bertolin (60%). Responsabile Locale F.Dal Corso (10%) S. Dusini (40%) C.Fanin (10%) U.Kose (30%) M. Laveder (20%) I.Lippi(60%) E.Medinaceli(40%) M.Mezzetto (20%) C.Sirignano (20%) L.Stanco (40%). Responsabile Nazionale 3.8 FTE • Riferimenti nella collaborazione • Stefano Dusini: Simulazione Detector e DAQ • - Luca Stanco: Supervisione Collaborazione Nel 2013 dovranno partire con le gare, test di rivelatori, allestimento sale sp. A Padova si chiedono 6 mesi-uomo di Ingegnere e 12 mesi-uomo di disegnatore Alessandro Bertolin / Luca Stanco - CdS Padova

  17. NESSiE Richieste finanziarie 2013 (Richieste molto corpose, modulo l’approvazione) Missioni Interne: 146+55(s.j.) (30+20 a PD) Missioni Estero: 109+20(s.j) (45+20 a PD) Consumo: 142+860(s.j.) (25+0 a PD) Inventario: 15 (0 a PD) Tot 412 K€ + 935(s.j.), di cui a Padova 100+40(s.j.)  Inoltre, per fine 2013 chiesti 2000 K€ Richieste ai servizi PADOVA per il 2013: Elettronica: 2 m.u. per consulenza DAQ 2 m.u. per consulenza Front-End Meccanica: 12 mesi uomo prototipizzazione Uffico Tecnico: 6+12 mesi per Struttura meccanica Alessandro Bertolin / Luca Stanco - CdS Padova