40 likes | 130 Vues
This guide addresses the issue of securing a free-standing mast to brickwork, ensuring stability and safety near Faraday Building. By bolting the mast securely, the increased distance to the instrument room in Renold building is achieved.
E N D
Option 1: tilt Problems with securing
Option 2: free-standing Mast could move
Option 3: bolted to brickwork Increased distance to instrument room
Main & Renold blgs Faraday blg MSS tower