1 / 11

North American Network Operations Group (NANOG)

North American Network Operations Group (NANOG). October 23, 2000 Washington, DC PJ Aduskevicz AT&T. Internet Reliability. Industry and Government Joint Initiatives Independent Initiatives Infrastructure Protection Network Reliability and Interoperability Council (NRIC) NRIC V

abram
Télécharger la présentation

North American Network Operations Group (NANOG)

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. North American Network Operations Group(NANOG) October 23, 2000 Washington, DC PJ Aduskevicz AT&T

  2. Internet Reliability Industry and Government • Joint Initiatives • Independent Initiatives • Infrastructure Protection Network Reliability and Interoperability Council (NRIC) • NRIC V • Focus Groups for Network Reliability Infrastructure Protection • Network Reliability Steering Committee • Facilities Solution Team • Common Ground Alliance

  3. NRIC V Focus Group 2: Network Reliability Focus Group 2A1 on Best Practices Chair: Rick Harrison, Telcordia Focus Group 2B1 on Data Reporting and Analysis Chair: P.J. Aduskevicz, AT&T • Evaluate and report on how well the Best Practices are being implemented by carriers • Update existing Best Practices as appropriate • Implement voluntary one year trial of outages of ISP, CMRS, Satellite, Cable and Data Networking Service Providers, that are likely to have significant public impact • Evaluate outage reporting requirements and guidelines currently used by wireline carriers to improve the quality of outage reporting • Evaluate and report on the reliability and availability of the PSTN utilizing NRSC quarterly reports Focus Group 2A2 on Best Practices Packet Switching Chair: Karl Rauscher, Lucent Focus Group 2B2 on Data Reporting and Analysis for Packet Switching Chair: Michael Caloyannides, Miretek Systems • Raise awareness in Packet Networks of existing Best Practices • Determine which existing Best Practices are applicable to Packet Networks • Monitor Voluntary Outage Reporting to determine Best Practices implications • Continue to monitor FCC reportable outages for Best Practices implications • Define exactly how packet networks fail by identifying all known major ways of failing • Extrapolate from how packet networks fail what a packet network outage is • Determine what would make sense to report as a packet network outage

  4. Infrastructure Protection Network Reliability Steering Committee Mission: The Alliance for Telecommunications Industry Solutions’ Network Reliability Steering Committee (NRSC) is a consensus – based industry committee. The NRSC will analyze the industry’s reporting of network outages to identify trends, distribute the results of its findings to industry, and where applicable, refer matters to appropriate industry forums for further resolution in order to help ensure a continued high level of network reliability. Data Assembly & Analysis Team Bill Klein ATIS Procedural Error Team Clyde Miller Nortel Networks Facilities Solutions Team John Healy Telcordia Technologies • Investigated Procedural Errors as a category unto itself rather than a subset of existing categories • Made recommendations to improve outage reporting in areas of product design, documentation, training and root cause analysis • Recommend Procedures for data analysis • Perform data analysis of outage reports • Issue quarterly and annual results of outage reports • Analyze FCC facility reliability data • Provide input to cross industry groups aimed at facility damage prevention • Develop and evolve best practices

  5. NRIC Focus Group 3 Subcommittee 2Voluntary Trial Criteria

  6. Outage Index Aggregated By Failure Category

  7. Number of Outage Reports byFacility Failure Sub-Category of Outage

  8. Outage Index Aggregated By Facility Failure Sub-Category

  9. Number Of Outage Reports By Procedural Error Root Cause Subcategory

  10. Common Ground Alliance Common Ground Alliance (www.commongroundalliance.com) “Call, Design, Locate and Dig Safely” Alliance works cooperatively to • Foster shared responsibility • Support research • Develop public awareness and education programs • Identify and disseminate “best practices” • Serve as a data clearinghouse Common Ground Study Identified Best Practices for Damage Prevention Such as • Encourage participation by all stakeholders in One Call Center Program • Include location of existing utilities on plans • Record actual placement of utilities upon installation • Utilize technologies and methods that render underground facilities easy to locate • Call before you dig • Know local one-call laws, policies and practices before beginning excavation activities

More Related