1 / 17

Internal Audit ISOTS16949:2002

Internal Audit ISOTS16949:2002. Lecturer: Soroush Avakh. ISOTS/16949 Requirement. 0.1 General 0.2 Process Approach 0.3 relationship with ISO9004 0.4 IATF Guidance to ISO/TS 0.5 Compatibility with other management sys. Continue:. 1. general 2. normative reference

adin
Télécharger la présentation

Internal Audit ISOTS16949:2002

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Internal Audit ISOTS16949:2002 Lecturer: Soroush Avakh

  2. ISOTS/16949 Requirement • 0.1 General • 0.2 Process Approach • 0.3 relationship with ISO9004 • 0.4 IATF Guidance to ISO/TS • 0.5 Compatibility with other management sys

  3. Continue: • 1. general • 2. normative reference • 3. Terms and definitions • 4. Quality management system • 4.1 General requirement • 4.2 Documentation requirements • 4.2.2 Quality manual

  4. Outputs Inputs Customer oriented process

  5. Continue: • 4.2.3 Control of documents • 4.2.3.1 Engineering specifications • 4.2.4 Control of records • 5. Management responsibility • 5.1.1 Process efficiency • 5.2 Customer focus • 5.3 Quality policy

  6. Continue: • 5.4 Planning • 5.5 Responsibility, authority and communication • 5.6 Management review • 6. resource management • 6.2 Human resources • 6.2.2 Competence, awareness and training

  7. Continue: • 6.2.2.1 Product design skills • 6.2.2.2 Training • 6.2.2.3 Training on the job • 6.2.24 Employee motivation and empowerment • 6.3 Infrastructure • 6.3.1 Plant, facility and equipment planning

  8. Continue: • 6.3.2 Contingency plan • 6.4 Work environment • 7. Product realization • 7.1 planning of product realization • 7.1.4 change control • 7.2 Customer oriented processes • 7.2.1 Determination of requirement related to product

  9. Continue: • 7.2.2 Review of requirements related to the product • 7.2.3 Customer communication • 7.3Design and development • 7.3.1 Design and development planning • 7.3.2 Design and development in put • Design and development output

  10. Continue: • 7.3.4 Design and development review • 7.3.5 Design and development verification • 7.3.6 Design and development validation • 7.3.7Control of design and development changes • 7.4 Purchasing • 7.4.1 Purchasing Process • 7.4.2 Purchasing information

  11. Continue: • 7.4.3 Verification of purchased product • 7.5 Production and service provision • 7.5.1 Control of production and service provision • 7.5.2 Validation of processes for production and service provision • 7.5.3 Identification and traceability • 7.5.4 Customer property

  12. Continue: • 7.5.5 Preservation of product • 7.6 Control of monitoring and measuring devices • 7.6.1 Measurement system analysis • 7.6.2 calibration • 7.6.3 laboratory requirements

  13. Continue: • 8. Measurement, analysis and improvement • 8.1 General • 8.1.1 Identification of statistical tools • 8.1.2 Knowledge of basic statistical concepts • 8.2 Monitoring and measurement

  14. Continue: • 8.2.1 Customer satisfaction • 8.2.2 Internal audit • 8.2.2.1 Quality management system audit • 8.2.2.2 Management process audit • 8.2.2.3 process audit • 8.2.2.4 Internal audit plans • 8.2.2.5 Internal auditor qualification • 8.2.3 Monitoring and measurement of processes

  15. Continue: • 8.2.4 Monitoring and measurement of product • 8.2.4.1 Layout inspection and functional testing • 8.2.4.2 Appearance items • 8.3 Control of nonconforming product • 8.3.4 Customer waiver

  16. Continue: • 8.4 analysis of data • 8.4.1 Analysis and use of data • 8.5.1 Continual improvement’ • 8.5.2 Corrective action • 8.5.3 Preventive action

  17. Questions?

More Related