An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. RISER PROJECT K kitchen & bathroom

  2. The lay of the land

  3. A PICTURE IS WORTH……

  4. Wall opening for pipe exposure Bathroom

  5. Temporary shower wall

  6. Bathroom fixtures out with the old! Not to city of Chicago code To city of Chicago code

  7. Throne/water closet/commode, byany other name, is still a toilet! before after

  8. Sloan valve Toilet replacement • We can provide a two piece toilet with a round or oblong bowl that is comfort (ada) height • The cost for this is $220 • If you prefer to get your own toilet, let the office know and we will have the plumber come to your unit to measure the rough-in dimension. You can then order it with that information • it must be in your unit the day that we start your plumbing • The association will provide the installation for the one you purchase , as long as there is no feature requiring wiring

  9. Tile replacement • In each unit, where we will remove a wall with tiles on it, the association will Reimburse that owner up to $187 to buy tiles of their own choice. The condo owner will make sure the tiles are in their unit at the time the contractor is ready to install them. Provide an invoice to be reimbursed.

  10. Tile replacement continued • The association will pay for the removal and the installation of 55’ of ceramic tile surrounding the tub. • If you choose to not use the association contractor/want to install tiles of other material, or want more square footage, A reimbursement check will be provided for up to $995. provide a copy of your invoice.

  11. TILE REPLACEMENT continued if you have re-done your bathroom, and still have enough extra tiles left over, from your remodel, have them in your unit when the riser work is finished there. The selected contractorS will install ceramic tiles, ONLY. If you have glass or stone (marble, granite, etc.) tiles then, the owner will need to negotiate with the contractor for the installation. Submit an invoice and, the association will reimburse up to $995.

  12. Some positives… Cleaner water Hotter water Better water pressure Shut-off valves are concealed No more sloan valve toilet noises in the middle of night!

  13. General information • Work will be done from 8am until 5pm, Monday thru Friday • Water will be shut off, on that riser throughout the workdays • At the end of each day there will be water in the bathroom fixtures • When the water is turned back on, it might have low pressure or be discolored, let it run a couple of minutes. The pressure may remain low throughout the duration of the project • There will be a lot of noise • The service elevator will be used intermittently to bring in pipes, etc. • When riser is complete, the walls affected will be patched and prime coated

  14. Time line (using the term loosely) • The contractor started removing the wall sections from the top floor down, on Tuesday, may 9, 2019. • Soon after, the plumbers will follow them. the plumbing and construction will take approximately 4-6 weeks • This estimation does not include any tile replacement

  15. How to prepare • Plumbers and contractors will be coming in and out of your units throughout the project • If you have pets - who want to bolt out the front door - put them behind a closed door or gate • Put a post-it note on your door saying how many and what type of animals that you have, that are ambulatory • Cover the furniture in the area where work is being done

  16. How to prepare - continued All of these ‘Housekeeping’ items should remain, in place, for the duration of the project • Remove items in and on your vanity cabinets • Remove everything in the shower/tub that is on the plumbing wall (shampoo caddy etc.) • Remove everything on or around your toilet

  17. How to prepare - continued • move any over-the-toilet storage units or artwork from the plumbing wall • Clean out medicine cabinet • Clear a 42” wide path from your entry door to your bathroom • In your kitchen, remove everything under the sink

  18. How to prepare - continued • If you have a dishwasher, clear it out. • When they are doing the wall removal, items on the kitchen wall will be jostled – valuable items should probably be moved.

  19. After… When the plumbers and contractors are finished in your unit- the demolished walls will be patched and prime coated. If your tile was removed, The association will not be responsible for scheduling/coordinating the tile work. Only you know what your schedule is. Because of so many unexpected delays, we don’t recommend you reaching out to a contractor until all of the work is complete.

  20. After, continued… • two contractors who are reasonably priced and have been working in the building, throughout the project are Ratko nikolic 773-330-3058 Oscar Ramirez 773-971-8987