Workplan for First 12 Months: AARDDVARK Site Installation and Data Analysis

This workplan outlines the key activities for the initial 12 months in establishing AARDDVARK sites. It identifies potential locations including Seattle, Fairbanks, Iceland, Greenland, and Boston for site deployment. The plan includes purchasing necessary instrumentation, such as PCs and GPS systems, as well as software licenses. Setup and deployment are scheduled for September 2011. Key research papers are also planned, focusing on EMIC responses, precipitation studies, and event databases. The year will see collaboration with universities for various research initiatives.

adsila
Télécharger la présentation

Workplan for First 12 Months: AARDDVARK Site Installation and Data Analysis

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. WP4: Workplans for first 12 months Identify site: Seattle? Fairbanks? Iceland? Greenland? Boston Buy instrumentation (including Pc): buy - Pc, GPS system (James), software licence (Ultra, James), Preamp (James), mast (James), aerials (James). Setup software . Ship and deploy at site – September 2011? D4.1 : Installation and setup of one new AARDDVARK site Note: D4.2 - Installation and setup of 2 more new AARDDVARK sites, year 2 :- Combine purchase for all 3 sites in first 12 months

  2. WP4: Workplans for first 12 months • Paper plan (First 12 months and ongoing): • Rio/VLF response to EEP – Craig lead with U.Alberta • EMIC evening precipitation paper – Mark lead on 15Oct’10 event? • Compression EMIC paper – Mark lead with U.Alberta • Shock precipitation paper – Fred Menk lead with Mark • EMIC-POES study – Craig lead (based on newest POES product) • EEP fluxes from Churchill data – Mark (Flux time sequence) • Substorm papers (relevant?) – AARDDVARK data available • Plume precipitation study – Mark lead with Borovsky/Denton D4.3 : Build event database of characteristics of REP What is missing: inner plasmasphere paper – waiting on new AARDDVARK deployments including Edmonton site (in place, not operational)

  3. WP4: Workplans for first 12 months • Paper plan (First 12 months and ongoing): • Rio/VLF response to EEP – Craig lead with U.Alberta • EMIC evening precipitation paper – Mark lead on 15Oct’10 event? • Compression EMIC paper – Mark lead with U.Alberta • Shock precipitation paper – Fred Menk lead with Mark • EMIC-POES study – Craig lead (based on newest POES product) • EEP fluxes from Churchill data – Mark (Flux time sequence) • Substorm papers (relevant?) – AARDDVARK data available • Plume precipitation study – Mark lead with Borovsky/Denton D4.3 : Build event database of characteristics of REP What is missing: inner plasmasphere paper – waiting on new AARDDVARK deployments including Edmonton site (in place, not operational)