1 / 7

SC-214/WG-78

SC-214/WG-78. Plenary 10: 3-7 May 2010 Palma de Mallorca. Position Papers and Contributions (1). Position Papers DO306/ED122 Amendment for ITP Final (Airbus/Boeing) Presentation :Comments received (focus Plenary Issues) Seamless ATC Transfers (Airbus)

afric
Télécharger la présentation

SC-214/WG-78

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. SC-214/WG-78 Plenary 10: 3-7 May 2010Palma de Mallorca

  2. Position Papers and Contributions (1) • Position Papers • DO306/ED122 Amendment for ITP Final (Airbus/Boeing) • Presentation :Comments received (focus Plenary Issues) • Seamless ATC Transfers (Airbus) • Presentation : Comments received (focus Plenary Issues) • Contributions • Seamless ATS Comm Transition – Patent (Boeing) • Patent Issue discussed by AD-Hoc Mgt SG • SPR Analysis of D-TAXI (Thales) • Forwarded to CSG and new 44/217 Tiger team • Draft Charter 217/44 an 214/78 D-TAXI Tiger Team 1.1 (217/44) • To be reviewed by Ad-Hoc Mgt SG • Update DO306/ED122 based on ICAO Gold + Annex A (FAA) • Policy ED122/DO306 update to be discussed by Ad-Hoc Mgt SG

  3. Position Papers and Contributions (2) • Contributions - continued • Safety Issues FANS Accomodation (EUROCONTROL) • Presentation, confirmation activity is covered by TORS • SPR Oceanic Integration Approach (30 April) (FAA) • Presentation Paper • Presentation additionals slides • SESAR (DFS) • Presentation • EUROCAE WG78 Revised TORs 2.0 and Slides (co-Chair 78/214) • Presentation • Security • IM

  4. Coordination with SC186/WG51 • Request from SC186 to conduct Change 1/ITP of DO306/ED122 • New Request from SC186 to include CPDLC messages for Interval Mgt

  5. Coordination with SC217/WG44 • Coordination on-going since 2009 • Purpose was to identify the INT mechanism to exchange references to Airport Map DB in support of D-TAXI graphical • 44/217 and 78/214 Tiger Team being established • Draft Charter to be reviewed this week • First Telcon – Wednesday 4pm • Proposal for Co-lead 78/214 : Matt Johnson (FAA) • 78/214 members to be identified • Input Telecon Wednesday • Draft Charter • SPR 78/214 version 0.H (D-TAXI) • SPR Analysis of D-TAXI (Thales) • 44/217 Connectivity SG Status • Paper « Taxi Network Features »

  6. Topics for Ad-Hoc Mgt SG • Review WG44/SC217 draft Charter; 78/214 membership • Co-Chairman 78/214 – Matt Johnson • Five 78/214 members • Revised Charter for approval • Request (ISR) from SC186/WG51 for CPDLC in support of Interval Mgt – Assess impact on planning • Impact on 78/214 material is limited to: • Development of extra Messages for inclusion in SPR and INT material • Verification whether existing CPDLC OSA meets SRs for new messages • Expectation is that all OSD material is contained in IM SPR of WG51/SC186 • Results from initial analysis • Around 6 new CPDLC messages identified to support IM • Position paper required for P11 with new message definitions and OSA/OPA analysis results • Patent Issue between FANS ground and 78/214 ground for double stack A/C • Boeing Intention to Release Patent • ISR for SC206 (RTCA only) • Organization of SGs work until September • SG meeting in US – last week of June • Oceanic integration meeting in last week of August

  7. SC-214/WG78 Meetings Plan

More Related