1 / 117

NuSTAR Critical Design Review Ae 105 June 3, 2008 California Institute of Technology

NuSTAR Critical Design Review Ae 105 June 3, 2008 California Institute of Technology. Structural/Thermal Elah Bozorg-Grayeli Elliott Pallett Matt Wierman Zac Lizer Alireza Moammad Karim Francisco Montero Chacon Vahe Gabuchian Dynamics/Control Silas Hilliard In Ki Choi

ahanu
Télécharger la présentation

NuSTAR Critical Design Review Ae 105 June 3, 2008 California Institute of Technology

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. NuSTAR Critical Design ReviewAe 105June 3, 2008California Institute of Technology Structural/Thermal ElahBozorg-Grayeli Elliott Pallett Matt Wierman ZacLizer AlirezaMoammadKarim Francisco Montero Chacon VaheGabuchian Dynamics/Control Silas Hilliard In KiChoi PrakharMehrotra Kevin Watts Derek Chan Metrology Nick Boechler Jason Damazo Manuel Fuentes David Gutschick 1

  2. Project Introduction • Project conducted as part of an 8 week interactive JPL-Caltech course • Performed analysis on multiple aspects of JPL flight project: NuSTAR 2

  3. NuSTAR Mission Overview • X-Ray Observatory • Obtain higher resolution images of x-ray sources • Two hard x-ray optics with 10 m focal lengths • 24 month mission (2) X-Ray Mirrors Mast & Canister (2) Focal Plane Modules Spacecraft Bus 3

  4. NuSTAR Description (2) X-Ray Mirrors S/C Bus 10.9 m Extendible Boom 4

  5. Chief Concern • X-Ray optics require precise pointing and alignment • Mirrors are mounted on end of extensible boom • Required accuracy of optics mandate determination of boom behavior 5

  6. JPL Level 1 Requirements 6

  7. Ae 105 Project Goals • Analyze the performance of NuSTAR observatory • Conduct structural and thermal analysis of the boom • Predict attitude and dynamics of the S/C • Design a metrology system to determine the position and orientation of the mirrors with respect to the bus • Assure JPL level 1 and below requirements are met 7

  8. Project Structure 8

  9. Structural/Thermal • Goal: • Generate integrated structural/thermal model of boom • Translate disturbances/forces into deflections/frequencies • Input: disturbance forces estimated by dynamics • Output: modal analysis results to dynamics and metrology 9

  10. Dynamics • Goal: • Generate S/C orbital/ADCS model • Input: Frequencies from structures • Output: forces to structures 10

  11. Metrology • Goal: • Design and select a mirror measurement system • Generate model to translate between measurements and real position/orientation • Input: frequencies from structures • Output: metrology system 11

  12. Introduction • Objectives • Pre-PDR • Requests for Action • Post-PDR • Boom Description • CALFEM/ANSYS Verification • Cases (1-4) • Thermal Analysis • Deliverables • Conclusions 13

  13. Structural/Thermal Objectives • Goal: • Create a FEM model of the NuSTAR boom. • Determine static loading cases • Perform modal analysis on the model to determine natural frequencies. • Create an FD thermal model of the NuSTAR boom • Model shall be capable of determining temperatures based on loading conditions • Integrate structural and thermal models into one package. 14

  14. JPL Level 1 Requirements 15

  15. Pre-PDR • Populated material properties list • Developed static loading case CALFEM model • Completed analytic thermal model • Wrote thermal FD code for worst case scenario 16

  16. Requests for Action • Consider the pre-stress of the cables in the deployed boom. Accepted • Standardize material properties for all boom models. Accepted • Define thermal distortions for more standard loading cases. Accepted • Consider various CTEs of thermal coatings. Accepted • Take into account the joints when modeling thermal distortion. Accepted • Consider how change of truss orientation effects calculations of thermal loading. Accepted 17

  17. Post-PDR • Standardized material properties in all models • Created ANSYS model of boom • Verified static analysis of ANSYS with CALFEM • Verified modal analysis of ANSYS with CALFEM • Completed thermal FD code for any S/C orientation 18

  18. Boom Description 19

  19. CALFEM/ANSYS Verification • CALFEM – less capable, more open • ANSYS – more capable, less open • CALFEM will be used to verify results from ANSYS to establish ANSYS as a proper modeling package 20

  20. Case Types 21

  21. Case #1 22

  22. Case #1: CALFEM - Bending 23

  23. Case #1: ANSYS - Bending 24

  24. Case #1: Axial Mode 25

  25. Case #1: Torsion 26

  26. Case #1: Comparisons • Conclusion- CALFEM and ANSYS are internally consistent 27

  27. Case #2 28

  28. Case #2: CALFEM - Bending 29

  29. Case #2: ANSYS - Bending 30

  30. Case #2: Axial Mode 31

  31. Case #2: Torsion 32

  32. Case #2: Comparisons • Conclusion- CALFEM and ANSYS are internally consistent 33

  33. Case #3 34

  34. Case #3: CALFEM - Bending 35

  35. Case #3: ANSYS - Bending 36

  36. Case #3: Axial Mode 37

  37. Case #3: CALFEM - Torsion 38

  38. Case #3: Comparisons • Conclusion- CALFEM and ANSYS are internally consistent 39

  39. CALFEM/ANSYS Verification • ANSYS is verified as a modeling package for the NuSTAR boom • Based on results under multiple scenarios using CALFEM and ANSYS • CALFEM – less capable, more open • ANSYS – more capable, less open 40

  40. Case #4: ANSYS Modal Analysis 41

  41. Case #4: ANSYS - Bending 42

  42. Case #4: ANSYS - Elongation 43

  43. Case #4: ANSYS - Torsion 44

  44. Case #4: Modes 45

  45. Thermal • Assumptions • Isothermal members • No conduction between members or joints • Radiative coupling between members • Tilted at 10o away from Sun • All material properties measured at 298.15 K. • CTE-Al = 24 ppm/K • CTE-C = -1 ppm/K • Orbital period = 5700 s • Earth albedo = 0.3 • S/C coating • Absorptivity = 0.17 • Emissivity = 0.83 46

  46. Thermal Red - Insolated Black - Shaded 47

  47. Thermal 48

  48. Thermal • Assuming calibration at 298 K • Sunside: ∆x = 903 μm • Shadeside: ∆x = 861 μm • Across Boom ∆x = 42.6 μm ∆Θ = 182.6 μrad 49

  49. Structural/Thermal Deliverables • To Dynamics • Moment of Inertia matrix • Stiffness matrix • Calculated natural frequencies • To Metrology • Deflections • Calculated natural frequencies • To JPL • CALFEM and ANSYS models of boom • ANSYS verified through CALFEM modeling • FD model of thermal loading of the boom • 3D Modal Mass matrix calculator for CALFEM library 50

  50. Conclusion • ANSYS is a verified static and modal analysis software • Have created a more robust thermal and structural model of S/C flight conditions • Spacecraft meets level 1 structural/thermal requirements 51

More Related