1 / 7

Carl Wilén, Saab AB Huntsville, AL 2006-10-31/11-01

Carl Wilén, Saab AB Huntsville, AL 2006-10-31/11-01. The ASD suite of ILS standards. ASD/AIA/ATA?. ASD/AIA/ATA. ASD/AIA/ATA?. Development started Jan 2006. Planned issue date late 2006. S1000D. ASD and AIA work together since 2003 ATA joined Jan 2005 to evaluate future use of S1000D

akamu
Télécharger la présentation

Carl Wilén, Saab AB Huntsville, AL 2006-10-31/11-01

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Carl Wilén, Saab ABHuntsville, AL 2006-10-31/11-01

  2. The ASD suite of ILS standards ASD/AIA/ATA? ASD/AIA/ATA ASD/AIA/ATA? Development started Jan 2006 Planned issue date late 2006

  3. S1000D • ASD and AIA work together since 2003 • ATA joined Jan 2005 to evaluate future use of S1000D • May 2006: ATA to go S1000D • A400M to go Iss 2.2 (2.3) • 787 and A350 to go S1000D Iss 3.0 • Current issue is Iss 2.2 • Common MoU ASD-AIA-ATA in process Iss 2.3 2007-02-28/Iss 3.0 200….

  4. PLCS – S1000D DEXes are needed to tie S1000D and engineering data together • CAWG – CMBT (Config Management Business Team) • DEX1 A&D Basic parts data/Structure/Config data • CAWG - MRPT (Maintenance Requirements PT) • DEX3 A&D Task information • EPWG - EAUSWG (Eff, Appl, Update and Sensitivity WG) • DEX1 A&D and DEX3 A&D • CAWG – EPWG • DEX2 A&D Fault isolation and reporting The S1000D work IS BUSINESS DRIVEN (which involves some struggling with the anoraks in the technical team). Data needed by manufacturer and/or user is taken care of.

  5. PLCS – S3000L • S3000L needs an ”LSAR data set” • DEX3 A&D incl Refdata • Work will start mid 2007 • Coordinated with S1000D-0007-PLCS work Leif G • has introduced PLCS to EPWG • will brief S3000L project at next F2F meeting

  6. DEX1 S2000M S3000LS4000A DEX3 Task information S1000D Acquisition logistics main business processes Acquisition logistics management Logs Mat Data OPS Data Provisioning Logs Mat Logs Mat Requ. Order admini- stration Provi- sioning Logistic Support Analysis Data and Data LSA Data Design Functional of IN IP Data Breakdown Systems Subsets Equipment and SERVICE Identification Support Design Data Equipment USE IETP Technical docu- mentation LSA data Other Media Design data

  7. The Board Standing WG The Steering CommitteeTPSMG Task Team Sea Publ WG(SPWG) Land Publ WG(LPWG) Air Publ WG(APWG) Electronic Publications WG(EPWG) Civil Aviation WG(CAWG) Editorial WG(EDWG) Defense WG(DWG) XX Task Team(XXTT) XX Task Team(XXTT) XX Task Team(XXTT) XX Task Team(XXTT) Proposed newOrganizational structure ASD - CPSC Customer & Product Support Committee AIA Product SupportCommittee ATA ATA e-business Parent org

More Related