1 / 1

PLANS HIRLAM version 7.1.2 operational 2007Q4 with 4D-VAR 66 km linear grid

SMHI operational HIRLAM EWGLAM 2007 8-11 october, DUBROVNIK Lars Meuller Swedish Meteorological and Hydrological Institute. Rotated lat/lon South pole at -30 / -10. Operational HIRLAM 4 forecasts a day. 00, 06, 12 and 18 UTC HIRLAM C22 – analysis +48 hours

alaire
Télécharger la présentation

PLANS HIRLAM version 7.1.2 operational 2007Q4 with 4D-VAR 66 km linear grid

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. SMHI operational HIRLAMEWGLAM 2007 8-11 october, DUBROVNIKLars MeullerSwedish Meteorological and Hydrological Institute Rotated lat/lon South pole at -30 / -10 • Operational HIRLAM • 4 forecasts a day. 00, 06, 12 and 18 UTC • HIRLAM C22 – analysis +48 hours • 2 hours data cutoff • HIRLAM E11 – analysis +72 hours • 1 hour 25 min data cutoff • HIRLAM G05 – analysis + 48 hours • nested to E11 • ECMWF preprocessing • SYNOP,SHIP,TEMP,PILOT, • BUOY,AIREP,AMDAR • BUFR AMDAR • ATOVS AMSU-A radiances – EARS • HIROMB oceanographic model for ice cover and SST • HIRLAM system • Based on HIRLAM version 6.3.5 • 3D-VAR FGAT ( analysis ) • DFI ( initialisation ) • ISBA ( surface scheme ) • moist CBR ( turbulence ) • Kain-Fritsch ( covnvection ) • Rasch-Kristjansson ( large scale ) HIRLAM domain’s C22 E11G05 Levels: 40 60 60 Hor. Res. 0.2° ( 22 km ) 0.1° ( 11 km ) 0.05° ( 5.6 km ) Gridpoints 306×306 256×288 294×441 Boundaries ECMWF 3 hour ECMWF 3 hour E11 every hour Time step 600 sec 300 sec 150 sec • PLANS • HIRLAM version 7.1.2 operational 2007Q4 • with • 4D-VAR • 66 km linear grid • SL, SETTLS • vert. diff. + large scale cond. linearised simplified physics • weak digital constraint • linear propagation of assimilation increments • statistical balance background constraint • 11 km / 60 levels on ~ C-domain 2008Q2 ( on new cluster ) • Forecast Index: • Hit rate for t2m +/- 2-4° • Kuipers index for total cloud cover. • 3 classes. 0-3, 4-6 and 7-8 octas • Kuipers index for precip. • 2 thresholds. 1 and 5 mm / 12 hours • Hit rate for 10m wind • +/- ( 1.7 m/s + 0.195×forecasted value ) • Swedish stations Test with new model Cop – oper Hirlam 6.3.5, 3DVAR Cnn – Hirlam 7.1.2 4DVAR HIRLAM-A at SMHI ALADIN and AROME have been run in research mode with daily forecasts. Results have been used to gain experience in meso-scale modelling. AROME at 2.5 km covering all of Sweden is to expensive to run at present. As a start, ALARO at 5 km (corresponding to G05) will be set up in an pre-operational mode 2007Q4. Version 32t3 Computer system at the National Supercomputing Centre at Linköpings University www.nsc.liu.se • Operational: • BLIXT • Linux • 82 nodes • dual Intel Xeon • 3.2 Ghz, 2 GB memory • Infiniband interconnect • Scali MPI connect • Intel compilers • Open PBS • Backup • BRIS • Linux – Home-made • 16 nodes • dual Intel Xeon • 2.2 Ghz, 1 GB memory • Scali interconnect • ScaMPI, MPICH, LAM • Intel compilers • Open PBS Compuer plans Replacement of BRIS New cluster, BORE, to run HIRLAM with 4D-VAR on 11 km horisontal resolution 606*606*60 gridpoints + AROME Operational 2008Q1 • > 8 cores per node • > 100 nodes • Intel / AMD / ? • Infiniband / InfiniPath / • Myrinet / Qadrics / ? • open until 20071120

More Related