QC 9.2. Prepared By  Sriraman K. Objectives. Test Management Tool – What, Why, Benefits etc To make participants aware of Test Process and controlling the process through security. Test Management Tool. Test Management Overview What is Test Management Tool?

albert
Télécharger la présentation

QC 9.2

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. QC 9.2 Prepared By  Sriraman K

  2. Objectives • Test Management Tool – What, Why, Benefits etc • To make participants aware of Test Process and controlling the process through security.

  3. Test Management Tool • Test Management Overview • What is Test Management Tool? • Why Test Management Tool to be used? • What are the benefits and false notion of using Test Management Tool? • Various Test Management Tool tool in the market • Introduction to QC • QC course Content

  4. Test Management Overview Definition • “Manage and measure the application delivery process from a quality perspective” Process • Validate application functions against the functional specification, i.e., functions yield the expected results? • Report and track defects • Measure test coverage and track application quality

  5. What isTest Management Tool • Test Management Tool is a repository. • It is meant for storing Requirements, Test Scenarios, Test Cases and Defects. • Use of Test Management Tool tools reduces the reporting time as well as the cost.

  6. Why Test Management Tool • Avoid the errors that human make when they compile reports received from various people. • The tool captures all the information entered by the users and gives the report to the management instantaneously. • Sends mail or trigger an alert based on the type of data captured by the end user. • Customizable to the need of the organization • Process compliance

  7. Benefits of Test Management Tool • More consistent • Reliable in compilation of reports • All the reports are instantaneous and hence the status of delivery is clearly visible to management. • Security • Traceability Matrix • Managing Change Request

  8. Caution • Needs discipline in entry otherwise the report will go havoc. • The tool maintains history and hence one cannot cook-up data – hence more compliance is required

  9. What are the different tools available in the market (for functional testing) • Rational Clear Quest • Rational Test Manager • Silk Central • HP Quality Center • Open Source Tools – Bugzila, Jira etc.

  10. Introduction to QC • Developed by Mercury interactive Owned by HP presently • QC is web based application, server being IIS or Jboss, Database as MS SQL or Oracle. • QC is formally known as Test Director. • Customization Script developed on VB Script • QC can be installed on Windows, Linux and Solaris

  11. Add Ins of QC • For integrating with automation tool like QTP, Winrunner, QC requires Add in • By Default QC supports • Winrunner • LR • Other Addin • QTP

  12. Course Objective • Quality Center • Release & cycle • Requirements • Managing Requirement • Customizing Requirements • Reports • Test Plan • Test Lab • Defects • Export From XLS • Export From Word • Site Administrator • Managing Domain • Managing Projects • Managing Users • Making user as Administrator to the project • Site Connections • License • Site Analysis • Quality Center • Customization • Users • Groups • Module Access • Project Entities • Project Lists • Requirement Type • Risk Based Quality Management • Auto Mail • Traceability • Alert

  13. Site Administrator • Manage Domain – • Domain is a folder which can handle any no. of projects. • Create Domain • Rename Domain • Manage Projects • Projects are the specific project by itself, whose Requirement, test case and defects needs to be maintained. • Each project is an database by itself • Cannot link one project to another project

  14. Projects – Contd. • Manage Project • Creation of Project • Renaming a Project • Pinging a Project • Coping a Project • Managing users to the project • Making an user as Administrative user for a project • Manage Users • Creation of Users • Association of users to the projects

  15. Quality Center • Customization • Project Users • Assigning users to the project • Creation of new user to the project • Mapping groups to the users • Project Groups (what is groups and its importance) • Creation of Groups • Assigning users to the groups • Customizing control using groups • Field level control • Setting the permission to change the data by created user and other user

  16. Customization contd. • Module Access • Controlling license using Module access • Need of Module Access • Project Entities – Works with Database Tables • System Defined Fields • Change Logical name for existing fields • To configure history, Mandatory and searchable criteria to a field • User defined fields • As String • As Date • As Number • As Blob • As List and User List

  17. Customization Contd. • Project Entities • How to make a field as mandatory (Required) • How to make a history to a field • How to give formatting to a field • How to include the field for search • Creation of User defined field • Mapping the field as String, List, UserList, Blob, Number • Formatting the field (Masking)

  18. Customization – Project Lists • Project List • Creation of New List and configuring the list using project entities • Managing the existing list with new values • Importance of checking the check box as Verify value of the project list in project Entities • Controlling the work flow for a list box contents using Groups • Effect of those in Requirements, Test Plan and Defects

  19. Requirements • Requirements • Creating a Requirement • Creating a sub requirement • Testing the changed workflow in the project groups in requirements • Testing the Mandatory, history setting at project groups • Customizing the columns • Different views of Requirements • Coverage view • Grid view etc.

  20. Test Plan • Test Plan • Creation of Test Scenarios (Folders), Sub Folders • Creation of Test Cases under Folders • Checking the effect of permission by changing the setting in groups for various users. • Customizing user defined field and its effect under test plan • Test Plan Details • Different View for Test Plan • Mapping Test cases to the requirement • Reports – Summary, Progress, Trend

  21. Test Lab • Test Lab • Creation of Rounds (Folder) • Creation of Test Set • Mapping test case to the test set • Execution of Round • Finding the actual result in the requirement after mapping • Creation of defect while executing through execution screen • Different execution reports

  22. Defects • Defects • Creation of Defects • Managing the defect cycle by configuring through groups • Effectiveness of security features of the defect status change • Customizing defect for various groups • Customizing the add defect screen • Customizing the modify defect screen • Various defect reports • Defect aging • Linking defects – Requirements, Test case, Through test lab

  23. Export From XLS file • All Requirements, Test Cases and Defects can be imported from XLS Sheet. Steps include • Block the content which needs to be imported in xls sheet

  24. Export From XLS Contd. • Select Export to XLS from Tools and Connect to QC using valid user name and password as shown below

  25. Export From XLS Contd. • Enter User Name and Password and select the domain and project from the list for that user.

  26. Export From XLS Contd. • Select the Module to which the import to take place (Requirements or Tests or Defects) • Select Temporary Map file (if you want edit latter you can save the file with map name)

  27. Export From XLS Contd. • Select the fields from the list and use “>” and map to Excel column name

  28. Export From XLS Contd. • Click on finish • Go to QC and we can see the Requirements got added. • Same way we can do for defects or Test Case

  29. Export From Word • Install the Word Add in provided by the QC • Open the word doc file • Tool bar has got added to the word open document • Under Tools, Quality Center Link has got introduced.

  30. Export From Word Contd. • Requirement Adding • Click Open req. Icon. • Enter the Requirement Name and Press Enter • Click Description • Enter Description and press Enter • Click Review • Enter Review value (as in the list box) (same way for author, priority) • Enter Author (as in the list box) • Enter priority (as in the list box) • Click Close Requirement

  31. Export From Word Contd. • After the entry the word document will look as shown. • For every requirement we need to close the requirement. • For non selected Field it will take the default value

  32. Export From Word Contd. • In the same way we need to do for Test case and it will look as shown • Test Folder • Test Case Name • Designer • Test Case Description • Test Step • Test Step Description • Expected Result • Close the folder at the end

  33. Export From Word Contd. • Once done, Click on Export To QC icon • Select the Server • Enter UserName and Pass word

  34. Export From Word Contd. • Select the domain and Project for which import has to happen • Select Next and finish

  35. Export From Word Contd. • Go to QC • Login and you can see the requirement added

  36. Export From Word Contd. • In the test plan module, you can see that test folder and test cases with test steps got added.

  37. Application Programming Interface • What is API • It is an Application Programming Interface • Need of API • Company cannot customize for every customer certain workflows or controls due to specific requirement of that client. • Customizing for individual customers leads to poor product maintenance in long run as product. • Product release and version control gets affected by customizing to individual customers at release level

  38. API Contd. • How API helps end customer? • API allows customer to program there own logic within a release and can be migrated to any new release they receive from the company. • API role in Site Administrator • Prevention of Multiple Login • Changing programmatically Site configuration Settings • Example – Changing the attachment size for particular mail from default 3000KB • Changing the mail format from html to text or vice versa • Getting information on how many connections are used and type of license used

  39. API – Quality Center • API role on Quality Center • Control to their workflow for any module • Customizing forms for any individual groups or users • Can create dependency or trigering alerts for specific incident at all module level • Customizing Default Selection in list box for any users or groups