aldis
Uploaded by
11 SLIDES
1107 VUES
190LIKES

Introduction to bibliographic database

DESCRIPTION

Introduction to bibliographic database. InMagic DB/Textworks. Textbase vs database Opening sample databases (textbases) Searching Manipulating records Creating a database. Assignment 2. Plan for work – email to m.middleton@qut.edu.au by September 6 th Competed project by 9th October.

1 / 11

Télécharger la présentation

Introduction to bibliographic database

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Introduction to bibliographic database

  2. InMagic DB/Textworks • Textbase vs database • Opening sample databases (textbases) • Searching • Manipulating records • Creating a database

  3. Assignment 2 • Plan for work – email to m.middleton@qut.edu.au by September 6th • Competed project by 9th October

  4. Bibliographic data base • ‘Bibliographic’ as per page 12 of Unit information • The 45 records • The 6 categories listed must all be represented, but they need not be mutually exclusive, e.g. a digital document may also be an item within item or a graphic.

  5. Project plan • Team and roles • Topic/user group • Timeline (plan) • Sample records (any form) • Analysis of 3 of the records • Rules about fields • This may help to identify some validation ideas for your db • Diary • You may wish to try Teamworker (teamworker.qut.edu.au)

  6. Report • Project management component • Still required for individuals; emphasis on personal decisions regarding research, standards and formats • Searching • You don’t hand in the database • You do hand in reports and screens that make its content and functionality obvious. • Evaluation criteria • Research required, but check under Resources>Topics ….Library catalogue evaluation … on OLT

More Related
SlideServe
Audio
Live Player
Audio Wave
Play slide audio to activate visualizer