Principles of Corporate Finance Brealey and Myers Sixth Edition. Making Investment Decisions with the Net Present Value Rule. Slides by Matthew Will. Chapter 6. Irwin/McGraw Hill. The McGraw-Hill Companies, Inc., 2000. Topics Covered. What To Discount IM&C Project

aliya
Télécharger la présentation

Slides by Matthew Will

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Principles of Corporate Finance Brealey and Myers Sixth Edition • Making Investment Decisions with the Net Present Value Rule Slides by Matthew Will Chapter 6 Irwin/McGraw Hill • The McGraw-Hill Companies, Inc., 2000

  2. Topics Covered • What To Discount • IM&C Project • Project Interaction • Timing • Equivalent Annual Cost • Replacement • Cost of Excess Capacity • Fluctuating Load Factors

  3. What To Discount Only Cash Flow is Relevant

  4. What To Discount Only Cash Flow is Relevant

  5. What To Discount • Do not confuse average with incremental payoff. • Include all incidental effects. • Do not forget working capital requirements. • Forget sunk costs. • Include opportunity costs. • Beware of allocated overhead costs. Points to “Watch Out For”

  6. Inflation • Be consistent in how you handle inflation!! • Use nominal interest rates to discount nominal cash flows. • Use real interest rates to discount real cash flows. • You will get the same results, whether you use nominal or real figures. INFLATION RULE

  7. Inflation Example You own a lease that will cost you $8,000 next year, increasing at 3% a year (the forecasted inflation rate) for 3 additional years (4 years total). If discount rates are 10% what is the present value cost of the lease?

  8. Inflation Example You own a lease that will cost you $8,000 next year, increasing at 3% a year (the forecasted inflation rate) for 3 additional years (4 years total). If discount rates are 10% what is the present value cost of the lease?

  9. Inflation Example - nominal figures

  10. Inflation Example - real figures

  11. IM&C’s Guano Project Revised projections ($1000s) reflecting inflation

  12. IM&C’s Guano Project • NPV using nominal cash flows

  13. IM&C’s Guano Project Cash flow analysis ($1000s)

  14. IM&C’s Guano Project Details of cash flow forecast in year 3 ($1000s)

  15. IM&C’s Guano Project Tax depreciation allowed under the modified accelerated cost recovery system (MACRS) - (Figures in percent of depreciable investment).

  16. IM&C’s Guano Project Tax Payments ($1000s)

  17. IM&C’s Guano Project Revised cash flow analysis ($1000s)

  18. Timing • Even projects with positive NPV may be more valuable if deferred. • The actual NPV is then the current value of some future value of the deferred project.

  19. Timing Example You may harvest a set of trees at anytime over the next 5 years. Given the FV of delaying the harvest, which harvest date maximizes current NPV?

  20. Timing Example - continued You may harvest a set of trees at anytime over the next 5 years. Given the FV of delaying the harvest, which harvest date maximizes current NPV?

  21. Timing Example - continued You may harvest a set of trees at anytime over the next 5 years. Given the FV of delaying the harvest, which harvest date maximizes current NPV?

  22. Equivalent Annual Cost Equivalent Annual Cost - The cost per period with the same present value as the cost of buying and operating a machine.

  23. Equivalent Annual Cost Equivalent Annual Cost - The cost per period with the same present value as the cost of buying and operating a machine.

  24. Equivalent Annual Cost Example Given the following costs of operating two machines and a 6% cost of capital, select the lower cost machine using equivalent annual cost method.

  25. Equivalent Annual Cost Example Given the following costs of operating two machines and a 6% cost of capital, select the lower cost machine using equivalent annual cost method. Year Machine1 2 3 4 PV@6% EAC A 15 5 5 5 28.37 B 10 6 6 21.00

  26. Equivalent Annual Cost Example Given the following costs of operating two machines and a 6% cost of capital, select the lower cost machine using equivalent annual cost method. Year Machine1 2 3 4 PV@6% EAC A 15 5 5 5 28.37 10.61 B 10 6 6 21.00 11.45

  27. Machinery Replacement Annual operating cost of old machine = 8 Cost of new machine Year: 0123NPV @ 10% 15 5 5 5 27.4 Equivalent annual cost of new machine = 27.4/(3-year annuity factor) = 27.4/2.5 = 11 MORAL: Do not replace until operating cost of old machine exceeds 11.

  28. Cost of Excess Capacity A project uses existing warehouse and requires a new one to be built in Year 5 rather than Year 10. A warehouse costs 100 & lasts 20 years. Equivalent annual cost @ 10% = 100/8.5 = 11.7 0 . . . 56 . . . 1011 . . . With project 0 0 11.7 11.7 11.7 Without project 00 0 0 11.7 Difference 0 0 11.7 11.7 0 PV extra cost = + + . . . + = 27.6 11.711.711.7 (1.1)6 (1.1)7 (1.1)10

  29. Fluctuating Load Factors

  30. Fluctuating Load Factors

  31. Fluctuating Load Factors