1 / 8
1545
80 likes | 299 Vues
1545. Tune 1545. Tune correction 1545. 1580: QPH correction. 1580: QPV correction. Naked versus correction. 1584 – no tune feedback. Observations. Tunes and chromaticities more-or-less identical for both beams
Télécharger la présentation
1545
An Image/Link below is provided (as is) to download presentation
Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.
Content is provided to you AS IS for your information and personal use only.
Download presentation by click this link.
While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.
During download, if you can't get a presentation, the file might be deleted by the publisher.
E N D
Presentation Transcript
1545 LHC startup progress
Tune 1545 LHC startup progress
Tune correction 1545 LHC startup progress
Observations • Tunes and chromaticities more-or-less identical for both beams • Watch carefully de-convolution of tune correction of tune modulation given by RF frequency modulation • Pseudo spikes at start of ramp; offset in estimate • b3 snapback correction 50% of total swing • Approx total swing: H -34.8 V 25.42 • Snapback time constant looks more or less OK • Most of it’s over after around 21 seconds
More Related