1 / 9

Presented By _______________________________________ Patrick S. Sullivan, R.E.A., C.P.P.

Landfill Management Practices for Reducing GHG Emissions CIWMB Strategic Policy Development Committee Public Workshop May 8, 2007 Sacramento, CA. Presented By _______________________________________ Patrick S. Sullivan, R.E.A., C.P.P. Outline of Presentation. Early Installation of LFG System

altessa
Télécharger la présentation

Presented By _______________________________________ Patrick S. Sullivan, R.E.A., C.P.P.

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Landfill Management Practices for Reducing GHG EmissionsCIWMBStrategic Policy Development Committee Public Workshop May 8, 2007Sacramento, CA Presented By _______________________________________ Patrick S. Sullivan, R.E.A., C.P.P.

  2. Outline of Presentation • Early Installation of LFG System • Maximizing LFG Design • Landfill Design/Operational Practices • Enhanced Monitoring

  3. Early Installation of LFG System • Use of LCRS for LFG Collection • Horizontal Collectors in Early Lifts of Waste • Earliest Possible Vertical Wells • Monitor and Collect When Sufficient Quantity (Pressure) Available • Obstacles • Low Gas Quality and Quantity • Significant Air Intrusion • Lack of BTUs for Combustion of Methane

  4. Maximizing LFG Design • Early Installation as Previous • Tighter Well Spacing---conservative radius of influence calculations • Dual Wells for Greater Vertical Coverage • Adequate Control and Backup Capacity • Maximize Blower Sizing and Include Redundancy • Maximize Pipe Sizing

  5. Maximizing LFG Design (cont.) • Maximize Borehole and Well Diameter • Use Combination of Vertical and Horizontal Wells Strategically • Limit Well Extensions Before Additional Well Installation • Increase Automation to Minimize Downtime • Use of VFD Blowers to Control Vacuum

  6. Maximizing LFG Design (cont.) • Design for Ease of Expansion • Design Include Collection from LCRS When Gas is Found • Enhanced Waste Degradation (bioreactor or leachate recirculation) means Enhanced LFG Collection • Looped Piping System for Multi-Directional Connection to Wells

  7. Landfill Design/Operational Practices • Design LFG Collection Component in Bottom Liner System • Seal Liner Anchor Trench • Improve Daily Cover Practices; Upgrade to Intermediate ASAP • ADC Must Provide Comparable LFG Barrier to Soil • Earliest Possible Final Cover System • Partial Final Cover if Entire Site Possible

  8. Landfill Design/Operational Practices (cont.) • Use of Biologically Active Covers • Avoid Cover Penetration When Possible and Seal Around Cover Penetrations • Landfill Expansion Design to Accommodate Gas Collection • Sequence Operations to Avoid Damage or Impact to LFG Systems

  9. Enhanced Monitoring • More Stringent Performance Standard for Surface Emissions (vs. 500 ppm) • More Frequent Monitoring (vs. quarterly) • Other Forms of Monitoring • Integrated Surface Sampling • Remote Sensing • Flux Chambers • Metric for Measuring Increase Performance ?

More Related