altsoba-wright
Uploaded by
13 SLIDES
333 VUES
130LIKES

WBS Software Requirements

DESCRIPTION

WBS Software Requirements. Frank Schmülling. The WBS requires software support to achieve full performance. ICU On Board Software: instrument tuning (attenuation) 16 bit data transfer timing constraints in fast chop mode ICC Data analysis software frequency calibration

1 / 13

Télécharger la présentation

WBS Software Requirements

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. WBS Software Requirements Frank Schmülling The WBS requires software support to achieve full performance • ICU On Board Software: • instrument tuning (attenuation) • 16 bit data transfer • timing constraints in fast chop mode • ICC Data analysis software • frequency calibration • power correction (TBD) F. Schmülling; WBS Software Requirements; WBS CDR 2-3rd April 2003

  2. WBS data format F. Schmülling; WBS Software Requirements; WBS CDR 2-3rd April 2003

  3. ICU: Dark Pixel correction Dark pixels measure the variable offset that is introduced to reduce DNL effects of the ADC • Subtract dark pixels from data that is to be used for on board instrument tuning. • For rearranged (sorted) WBS data the corrected spectrum c is:c(2i) = p(2i) - de and c(2i+1) = p(2i+1) - dofor each CCD, i=0..2048/2 • Note: dark pixel correction is also necessary for ZERO scans that are used for on board instrument tuning F. Schmülling; WBS Software Requirements; WBS CDR 2-3rd April 2003

  4. ICU: WBS Attenuator tuning 3. Optimize (2 iterations) • Start integration, read scan, subtract ZERO and bin data • Optimize attenuator setting • Command new setting 1. Prepare • Read ZERO scan • Set attenuators to maximum attenuation (TBD) • Put HOT load into signal path 2. First Guess • Start integration, read scan, subtract ZERO and bin data • Calculate optimum attenuator setting • Command new setting F. Schmülling; WBS Software Requirements; WBS CDR 2-3rd April 2003

  5. ICU: WBS Attenuator tuning (cont.) • Fixed number of iterations • Total procedure takes in the order of 5 seconds • Robust against spikes • Store settings in the ICU so they can be reused after COMB/ZERO measurements F. Schmülling; WBS Software Requirements; WBS CDR 2-3rd April 2003

  6. WBS raw data (24 bit) 0.08s ≤ t ≤ 1.28s 1.28s ≤ t ≤ 2.56s 2.56s ≤ t ≤ 5.12s ICU: Convert data to 16 bit For integration times between 0.1 and 5 seconds the 24 bit WBS data can be converted to 16 bit F. Schmülling; WBS Software Requirements; WBS CDR 2-3rd April 2003

  7. ICU: Convert data to 16 bit (cont.) • Information how the data was shifted must be included in the data header • ZERO and COMB with 1 sec integration time • Maximum integration time is 5 seconds • Truncated data is guaranteed to • Cover full range of possible values:represent maximum pixel-count • Have enough precision to resolve RMS:make digitization noise negligible F. Schmülling; WBS Software Requirements; WBS CDR 2-3rd April 2003

  8. 10ms 10ms 10ms ICU: Timing constraints Fast chop timing of the WBS CCD readout frames Timing-Jitter of the start command affects the performance of the WBS (Memory effect of the CCD) start stop start Tstop-start=N•10ms + 5ms ± 0.5ms Tstart-start=(N+n)•10ms + 5ms ± 10µs F. Schmülling; WBS Software Requirements; WBS CDR 2-3rd April 2003

  9. ICU: Timing constraints (cont.) CCD memory effect: about 3% charges from the previous scan Maximum integration times in fast chop mode: Note: fast chop mode has 2 seconds dead-time for every read-out F. Schmülling; WBS Software Requirements; WBS CDR 2-3rd April 2003

  10. ICC: Data handling overview F. Schmülling; WBS Software Requirements; WBS CDR 2-3rd April 2003

  11. 2. Find exact peak position by fitting Gaussians 3. Fit frequencies (100MHz, 200MHz..) to Comb positions 1. Identify peaks ICC: generate frequency calibration polynomials Find coarse peak positions Fit polynomial. Plot showslinear fit - 100*residuals Fit exact (sub-pixel resolution) peak positions F. Schmülling; WBS Software Requirements; WBS CDR 2-3rd April 2003

  12. ICC: Frequency calibration • Use a Gaussian filter-curve to resample data: • The frequency fn for every pixel is computed using the frequency calibration polynomial • The resolution of the resampled spectrum can be defined (Q2) F. Schmülling; WBS Software Requirements; WBS CDR 2-3rd April 2003

  13. ICC: Power correction Platforming effects Raw data Corrected data Effects in uncorrected data due to non-linear behaviour of WBS components.Spectrum: (S-R)(R-Z), S≈2•R F. Schmülling; WBS Software Requirements; WBS CDR 2-3rd April 2003

More Related