amos-branch
Uploaded by
25 SLIDES
438 VUES
250LIKES

ESTMD System -- A Web-based EST Model Database System

DESCRIPTION

ESTMD System -- A Web-based EST Model Database System. Yinghua Dong. Outline. Project Review Architecture Design Formal Requirement Specification Test Plan Formal Technical Inspection Project Status References Acknowledgments. Project Review. Objective

1 / 25

Télécharger la présentation

ESTMD System -- A Web-based EST Model Database System

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ESTMD System -- A Web-based EST Model Database System Yinghua Dong MSE Presentation II

  2. Outline • Project Review • Architecture Design • Formal Requirement Specification • Test Plan • Formal Technical Inspection • Project Status • References • Acknowledgments MSE Presentation II

  3. Project Review Objective Build a web-based, user-friendly Expressed Sequence Tags model database (ESTMD) system to help biologists search expression sequences and related information to make further decisions MSE Presentation II

  4. Architecture Design -- Use Case Diagram MSE Presentation II

  5. Architecture Design -- Main Object Model (1) MSE Presentation II

  6. Architecture Design -- Main Object Model (2) MSE Presentation II

  7. Architecture Design -- Object Model of Search In Detail MSE Presentation II

  8. Architecture Design-- Object Model of Search By Keyword MSE Presentation II

  9. Architecture Design -- Object Model of Gene Ontology MSE Presentation II

  10. Architecture Design -- Object Model of GO Classification MSE Presentation II

  11. Architecture Design -- Object Model of Pathway Search MSE Presentation II

  12. Architecture Design-- Sequence Diagram of Gene Ontology MSE Presentation II

  13. Architecture Design-- Sequence Diagram of GO Tree View MSE Presentation II

  14. Formal Requirement Specification-- Overview • Language: Alloy 1.1 -- a structural modeling language based on first-order logic • Tool: ACA (Alloy Constraint Analyzer) • Purpose: explore abstract software designs, simulate execution of operations, and check user-specified properties of a model • Scopes: Gene Ontology Query and Gene Ontology Tree Generation • References: Dr. John Hatcliff, CIS 771 Lectures Alloy web site, http://sdg.lcs.mit.edu/alloy MSE Presentation II

  15. FRS (cont’d) -- For Gene Ontology Query • The user who submits a form is the user who gets the form's query result. all f : Form | f.whoPut = f.query.whoGet • The link belongs to the result which its corresponding output item belongs to. all l : Link | l.linkedBy in l.linkBelongTo.includeOutputItem • The input item is written by the user who put the corresponding query form. all ii: InputItem | ii.belongToUser=ii.belongToForm.whoPut MSE Presentation II

  16. FRS (cont’d) -- For Gene Ontology Query • Each sequence ID links to a sequence link all oi: OutputItem | oi /in SequenceID <-> oi.linkTo /in Sequence_link • Each GOID links to a tree link all oi: OutputItem | oi /in GOID <-> oi.linkTo /in TreeView_link • Detail Document MSE Presentation II

  17. FRS (cont’d) -- For Gene Ontology Tree Generation • No Item is its own ancestor. no i: Item | i in i.+parents • There is exactly one Root in each tree. one i: Item | i /in Root • Each item except Root is Root's descendant. all i: Item - Root | Root in i.+parents • Root has no parents or ancestor all r: Root | no r.+parents • Leaf has no children or descendant all l: Leaf | no l.+children • NonLeafItem must have at least one parent and at least one child. all nl: nonLeafItem | some nl.parents && some nl.children MSE Presentation II

  18. FRS (cont’d) -- For Gene Ontology Tree Generation • Operation – Add a new Item in the tree op AddItem (l: Leaf'!) { // pre-condition l !in Item // post-condition Item' = Item + l all p: l.parents' | p in Item // frame-condition Root' = Root all i: Item | i.parents' = i.parents } • Detail Document MSE Presentation II

  19. Test Plan • Test Phases: • Unit testing, Integration testing, and System testing • Test Items: • Connection between server and database • Each page • Test Features: • Features to be tested: each function • Features not to be tested: quality of the data MSE Presentation II

  20. Test Plan (cont’d) • Methodology: • Functional testing (Black box) method • Pass/Fail Criteria • The system will pass if the authentication works correctly and if the results from the queries are displayed within one minute. • Otherwise the test will fail and the code will be revised. • Deliverables: • Test plan, Test case specification, and Test result • Detail Document MSE Presentation II

  21. Formal Technical Inspection • Purpose To ensure consistency in the software development life cycle and quality of the software requirements • Organization • Developer: Yinghua Dong • Inspectors: Acharaporn Pattaravanichanon (Ann) and Zhigang Xie • Software Inspection Checklist * Completeness * Consistency * Correctness * Feasibility * Modifiablility * Traceability * Understandability * Clarity * Functionality * Reliability • Detail Document MSE Presentation II

  22. Project Status • Finished: • Documentation: 1/2 of the whole project • Implementation: About 1/3 • Future Work: • Implementation: 2/3 workload • Documentation: User Manual, Test Report, and Evaluation • Final Presentation MSE Presentation II

  23. References • Modeling Web Application Architectures with UML, Jim Conallen, http://www3.software.ibm.com/ibmdl/pub/software/rational/web/whitepapers/2003/webapps.pdf • Software Formal Inspections, Software Assurance Technology Center (SATC), 1997, http://satc.gsfc.nasa.gov/fi/fipage.html • Software Requirements, 2nd Edition, Karl Wiegers, Microsoft Press, 2003, http://www.processimpact.com/process_assets/requirements_review_checklist.doc • Software Engineering: A practitioner’s Approach, 5th Edition, Roger. S. Pressman, • Alloy web site, http://sdg.lcs.mit.edu/alloy • CIS771 lecture, Dr. Hatcliff • CIS 540, CIS 841 lecture, Dr. Gustafson MSE Presentation II

  24. Acknowledgments Committee: • Dr. Mitchell L. Neilsen • Dr. Gurdip Singh • Dr. Daniel Andresen MSE Presentation II

  25. Suggestions and Comments Thank You! MSE Presentation II

More Related