1 / 7

Thermal Compensation System

Thermal Compensation System. Status of components procuring and installation planning. INFN Roma Tor Vergata. Components procuring. Access Laser Co contacted: Lasers were sent on January 21st, 2008 Landed in Florence on January 28th. Being machined in Tor Vergata Workshop.

anitra
Télécharger la présentation

Thermal Compensation System

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Thermal Compensation System Status of components procuring and installation planning INFN Roma Tor Vergata

  2. Components procuring Access Laser Co contacted: Lasers were sent on January 21st, 2008 Landed in Florence on January 28th Being machined in Tor Vergata Workshop Being machined at Galli&Morelli Due to budget availability: no spare purchased!

  3. Overall planning A. Rocchi – 30.01.2008 – Detector meeting

  4. Chiller Electronics A. Rocchi – 30.01.2008 – Detector meeting

  5. Installation planning Operations preliminary to installation ITF down time A. Rocchi – 30.01.2008 – Detector meeting

  6. The End A. Rocchi – 30.01.2008 – Detector meeting

More Related