50 likes | 161 Vues
This document captures the key discussions from the ITS Engineering Meeting held on November 17, 2004, led by Pier-Luigi Barberis. It covers various aspects of patch panel positioning and duct services, including insights on the front and lateral views of the installations. The meeting aimed to address updates in ITS services related to patch panels, PM boxes, and electronic boxes, ensuring efficient service delivery and maintenance. A comprehensive overview of the relevant technical parameters was presented to the team for further action.
E N D
ITS SERVICES RB26 side : Services Support Lateral View ITS-Engineering Meeting 17-11-2004 Pier-Luigi BARBERIS
ITS SERVICES RB26 side : Patch-Panel position Patch-Panel … ITS-Engineering Meeting 17-11-2004 XPSSDU26040107 Services Ducts Patch-Panel … XPSDDU26010005 FMD Box V0 Box V0 PPanel Pier-Luigi BARBERIS
ITS SERVICES RB26 side : front view Patch-Panel position ITS-Engineering Meeting 17-11-2004 Pier-Luigi BARBERIS
ITS SERVICES RB26 side : VO Duct , PM-Box and Patch-Panel ITS-Engineering Meeting 17-11-2004 Pier-Luigi BARBERIS
ITS SERVICES RB26 side : VO PM-Box and Electronic-Box ITS-Engineering Meeting 17-11-2004 Pier-Luigi BARBERIS