annice
Uploaded by
19 SLIDES
392 VUES
190LIKES

Minimizing Latency and Memory in DSMS

DESCRIPTION

Minimizing Latency and Memory in DSMS. CS240B Notes By Carlo Zaniolo CSD--UCLA. Query Optimization in DSMS Opportunities and Challenges. ∑1. Sink. O 2. Source. σ. ∑ 2. Sink. Source. O 1. Sink. O 3. . ∑ 1. Sink. Source1. U. Source2. σ. ∑ 2. Sink.

1 / 19

Télécharger la présentation

Minimizing Latency and Memory in DSMS

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Minimizing Latency and Memory in DSMS CS240B Notes By Carlo Zaniolo CSD--UCLA

  2. Query Optimization in DSMSOpportunities and Challenges ∑1 Sink O2 Source σ ∑2 Sink Source O1 Sink O3  ∑1 Sink Source1 U Source2 σ ∑2 Sink • Simple DBMS-like opportunities: e.g. pushing selection. • Sharing of operators and buffers can be important. • No Major saving in execution time from reordering, indexes and operator implementation. Except for these cases: • Total execution time is determine by the query graphs and the buffer contents.

  3. Optimization Objectives • Rate-based optimization [VN02]: Overall objective is to maximize the tuple output rate for a query • Minimize Memory Consumption: with large buffer memory could become scarce • Minimize response time (latency): • Time from source to sink • Maximize user satisfaction

  4. Rate Based Optimization • Rate-based optimization [VN02]: • Take into account the rates of the streams in the query evaluation tree during optimization • Rates can be known and/or estimated • Overall objective is to maximize the tuple output rate for a query • Instead of seeking the least cost plan, seek the plan with the highest tuple output rate. • maximizing output rate normally leads to optimum response-time. But no actual proof of that. • As opposed to Chain that guarantees optimality for memory [Babcock 2003]

  5. Progress charts • Each step represents an operator • The ith operator takes (ti – ti-1) units of time to process a tuple of size si-1 • Result is a tuple of size si • We can define selectivity as the drop in tuple size from operator i to operator i+1. O1 Source O2 O3 O1 O2

  6. Chain Scheduling Algorithm Source O1 O2 O3 Sink Original query graph is partitioned into sub-graphs that are prioritized eagerly O1 O1 Lower Memory Memory O2 O2 envelope O3 O3 Time

  7. State of the Art • Chain Limitations: • Latency minimization not supported—only memory • Generalization to general graphs leaves much to be desired • Assumes every tuple behaves in the same way • Optimality achieved only under this assumption---what about if tuples behave differently?

  8. Query Graph: Arbitrary DAGs  Source1 U Sink Source2 σ Sink O2 Source σ ∑1 ∑2 Sink Source O1 Sink O3  ∑1 Sink Source1 U Source2 σ ∑2 Sink

  9. Chain for Latency Minimization? • Chain Contributions: • Use the efficient chart partitioning algorithm to break up each component into subgraphs, where • resulting subgraphs are scheduled greedly (steepest slope first). • How can that be used to minimize latency on arbitrary graphs? (assuming that the idle-waiting problem has been solved--or does not occur because of massive and balanced arrivals).

  10. Example, one operator: Latency: the Output Completion Chart Total Output Remaining Output 3 3 2 Remaining Output 2 1 N 1 Time Time Source O1 Sink tuple1 tuple2 tuple3 tuple1 tuple2 tuple3 S Time • Suppose we have 3 input tuples at operator O1 • Horizontal axis is time, vertical axis is # remaining output to be produced • Many waiting tuples  curve smoothes into the dotted slope • The slope is average tuple processing rate

  11. Latency Minimization Remaining Output O1 O2 O3 O4 Time A: Source O1 Sink B: Source O2 Sink Remaining Output: A first • Example for latency optimization: multiple independent operators • Total area under the curve represents total latency over time • Minimizing total area under the curve—same as lower envelope • Order operators by non-increasing slopes B first B SB A SA A B SB Time SA Time

  12. Latency Optimization on Tuple-Sharing Fork O1+O2 2N 2N O1+O2 O1+O2+O3 O1+O2+O3 N O3 N O3 Time Time N(1 + 2+3 ) N x 3 N(1+2) Sink Sink O2 O2 Source Source O1 O1 Sink Sink O3 O3 Tuples shared by multiple branches: scheduling choices at forks: • Finish all tuples on the fastest branch first (break the fork) • Achieve fastest rate over the first branch • Take each input through all branches (no break) • FIFO , achieves the average rate of all branches Partition at Fork No Partition atFork

  13. Latency Optimization on Nested Fork E D Remaining Output G+H+P C+A+B O A Sink C B Sink D Sink Source E H Sink P Sink G O Sink • Recursively apply the partitioning algorithm from bottom-up • Starting from forks closest to sink buffers • Similar algorithms can be used for memory minimization • Slopes are memory-reduction rates • Require branch-segmentation, more complicated

  14. Optimal Algorithm-Latency Minimization Source A Sink Source B Sink Source C Sink • We have so far assumed which buffer to process next by the average costs of the tuples in each buffer. Thus for the simple case above the complete schedule is a permutation of A, B, and C. • Scheduling based on individual tuple cost: make a scheduling decision for each tuple and the basis of its individual cost. • Scheduling is still constrained by tuple-arrival order—thus at each step, we chose between the heads of each buffer. • A greedy approach that selects the least expensive head is not optimal!

  15. Optimal Algorithm:when cost of each tuple is known Source A Sink Source B Sink Source C Sink • For each buffer chart the costs of the tuples in the buffer: Partion each chart into groups of tuples • Schedule group of tuples eagerly, i.e. by decreasing slope • Optimality as minimization of resulting:area = cost × time.

  16. Example: Optimal Algorithm Source A Sink Source B Sink A5,A4,A3,A2,A1 B3,B2,B1 \ / \ / A1 A2 a B1 B2 SA1 A3 SB1 A4 B3 A5 Time SB2 Time SA2 • * Naïve Greedy would take B1 before A1 • ** Optimal Order: SA1=A1,A2,A3,A4. Then SB1=B1,B2, then SB2=B3, finally SA2=A5.

  17. Experiments – Practical vs. Optimal Latency Minimization Over many tuples, the practical component-based algorithm for latency minimization closely resemble the performance of the (unrealistic) optimal algorithm.

  18. Results • Unified scheduling algorithms for both latency and memory optimization • The proposed algorithms are based on the chart-partitioning method first used by Chain for memory minimization • Also a better memory minimization for tuple-sharing forks. • Derived optimal algorithms under the assumption that the processing costs of individual tuples is known. • Experimental evaluation shows that optimization based on the average costs of tuples in buffer (instead of their individual costs ) produces nearly optimal results.

  19. References S. Viglas, J. F. Naughton: Rate-based query optimization for streaming information sources. SIGMOD Conference 2002: 37-48 [VN02] B. Babcock, S. Babu, M. Datar, R. Motwani: Chain: Operator Scheduling for Memory Minimization in Data Stream Systems. SIGMOD Conference 2003: 253-264 This is the chain paper referred to as [BBDM03] or [Babcock et al.] Yijian Bai and Carlo Zaniolo: Minimizing Latency and Memory in DSMS: a Unified Approach to Quasi-Optimal Scheduling. The Second International Workshop on Scalable Stream Processing Systems, March 29, 2008, Nantes, France.

More Related
SlideServe
Audio
Live Player
Audio Wave
Play slide audio to activate visualizer