Presenting Northwind. Frank Coenen For InControl SA CEO Northwind NV. Northwind project. Concession granted: 15 May 2006 Fully permitted Permit for construction and exploitation Export Cable Permit Land cable Declaration of public use Flemish road permit Federal road permit

annora
Télécharger la présentation

Presenting Northwind

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Presenting Northwind Frank Coenen For InControl SA CEO Northwind NV

  2. Northwind project • Concession granted: 15 May 2006 • Fully permitted • Permit for construction and exploitation • Export Cable Permit • Land cable • Declaration of public use • Flemish road permit • Federal road permit • Building permit • Area: 14,5 km² • Water depth: 16 to 29 m • Distance from shore: 37 km

  3. Northwind project 216 MW 72 Vestas turbines V112 3 MW Yearly production estimated: 0,875 Terrawatthours = 875 million kilowatthours Meaning: 1% of the yearly electricity consumption in Belgium in 2011. Green energy for 230.000 households each year.* Reduce CO2 emission by 245.000 tons each year.** * cfr VREG ** cfr Eurostat

  4. General information • Turbine model: Vestas V112 – 3.0 MW • Rotor diameter: 112 m • Foundation type: Monopiles • Export cable: 220 kV • Length export cable: 43 km • Construction will start: spring 2013

  5. Shareholders Parkwind

  6. Offshore windfarm • Monopile • Transition piece • Windturbine Inter array cables OHVS (transformation station) Export cable 5 3 Connection to transmission grid 2 1 4 6

  7. Contractors WE Power

  8. Contractors Installation export cable & dredging: Supply and termination land cable: WTG installation vessel: Supply and termination export cable:

  9. Contractors WTG: Supply & installation Offshore High Voltage Station:  HV equipment: CG Power systems Foundation design certification: Power purchase agreement:

  10. Partners Insurance • Profin • Marsh Belgium • CodanForsikring A/S • AXA Versicherung AG • AXIS Specialty Europe Ltd. • HDI-Gerling Verzekeringen N.V Financial & legal • BnP Parisbas Fortis • Mott Macdonald • Green giraffe • Loyens & Loeff • White & Case • Contrast • JLT • Freshfields • KPMG

  11. Belgian content Belgian content: 50% Deme-GeoSea Jan De Nul CG Power systems Belgium GI Windforce Vanden Bergh/Heijmans • Other than procurement • WE-Power • Aspiravi Offshore • Electrabel • LoyensLoeff Lawyers • White & Case Lawyers Brussels & London • Contrast Lawyers • Marsh Belgium • KPMG Tax advice • Freshfields Lawyers Brussels • BNPParibasFortis • Belfius Bank • ING Bank • IMDC • Tractebel-Technum • ONDD-Delcredere.

  12. TeamPartners • InControl SA • WE Power • ABS • Aspiravi offshore • Chevalyse • Ensol • EPCM • IMDC • Noren quality consulting • Offshore wind power consulting • Polymira • Qualsurv • SGS • TechnumTractebel • Verenigde fiducaires • Wind Support Limited

  13. Belgian support • FOD economy • Federal authorities • MUMM • Flemish authorities • Elia • CREG • DG Leefmilieu & Northwind team