Health & Safety in Construction

Health & Safety in Construction. Key Issues for Designers, Managers & Contractors. NOT MY FAULT !. IT WAS HIM !. SHE LET IT HAPPEN !. Where does the root cause of all construction accidents lie?. Over 60% accidents due to decisions before work began!.

anoush
Télécharger la présentation

Health & Safety in Construction

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Health & Safety in Construction Key Issues for Designers, Managers & Contractors.

  2. NOT MY FAULT ! IT WAS HIM ! SHE LET IT HAPPEN ! Where does the root cause of all construction accidents lie? Over 60% accidents due to decisions before work began!

  3. What Sort of Accidents Occur on Construction & Civil Engineering Sites?

  4. Which sectors of industry are affected the most?

  5. Reasons ? • During construction the ‘work place’ and activities are constantly changing. • Designers are looking ahead to work which will be undertaken by others (employees/ sub-contractors) in a manner managed by others (main contractor).

  6. Constant Change? • Prototype nature of work • Lack of standardisation of components • Diverse sites and locations. • Constantly changing workforce. • Loss of traditional apprentice training • Influx of foreign workers with poor command of English • Pressures to meet deadlines. • Habit of sub-contracting • Low returns on capital outlay

  7. Founding Legislation • 1974 Health & Safety at Work Act • Enables a framework of supporting ‘Regulations’ with ‘Approved Codes of Practice’ for guidance. • Goal setting • European Union Directive ‘Temporary & Mobile Construction Sites’ • Takes precedence over UK law • But enacted through UK legislation

  8. Main Enabled H & S ‘Regulations’ for Designers & Managers on Construction Projects. • Construction (Design & Management) Regulations 2009 “CDM” • Management of Health and Safety at Work Regulations 1999 “MHSW”

  9. Construction Design & Management Regulations • Places a duty on Clients, Designers & Contractors to place H&S first, to co-ordinate and mange throughout all stages from inception to completion. • This includes: • Conception, design & planning, execution of site works, following maintenance & repair, even to final demolition & removal.

  10. Duty Holders under CDM • Client • Planning Coordinator • Designers • Principal Contractor • Other Contractors

  11. Main Features of CDM • Competence & Adequate Resources • Risk Assessment • Co-operation & Co-ordination • Production of Information • H&S Plan - in advance of work happening • H&S File - as an ‘owners’ handbook

  12. Application of the CDM Regulations

  13. Management of Health and Safety at Work Regulations 1999 • required to undertake Risk Assessments; • appoint competent people; • set up emergency procedures; • provide clear information and training to employees; • work together with other employers sharing the same workplace.

  14. What are the hazards? Who could be harmed & how? What is the risk? What are you already doing? What further action is necessary? By who and when? Hazard is something that can cause HARM! Risk Assessment Considerations: Operatives, Other workers & the public! Chance vs. Severity ? High / Medium / Low Examine your control measures

  15. Key Issues: Health & Safety in Construction • The Construction Industry is a hazardous environment; • H&S is everyone’s responsible whether a designer, planner or contractor; • Every aspect of a project needs to be assessed for risk; • Control measures need to be in place and need to be checked & audited.