1 / 30

Bluespec-7: Scheduling & Rule Composition Arvind Computer Science & Artificial Intelligence Lab

This document discusses the complexities of scheduling multiple rules within a highly non-deterministic GAA execution model. It introduces the essential components of rule composition as state transformers, focusing on how to execute rules concurrently without violating one-rule-at-a-time semantics. The key concepts include the decomposition of rules into predicates and state transformation functions, the implementation of concurrent executions while ensuring conflict-free conditions, and managing mutually exclusive rules that cannot be activated simultaneously.

arlais
Télécharger la présentation

Bluespec-7: Scheduling & Rule Composition Arvind Computer Science & Artificial Intelligence Lab

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Bluespec-7: Scheduling & Rule Composition Arvind Computer Science & Artificial Intelligence Lab Massachusetts Institute of Technology http://csg.csail.mit.edu/6.375/

  2. Highly non-deterministic GAA Execution model Repeatedly: • Select a rule to execute • Compute the state updates • Make the state updates User annotations can help in rule selection Implementation concern: Schedule multiple rules concurrently without violating one-rule-at-a-time semantics http://csg.csail.mit.edu/6.375/

  3. Rule: As a State Transformer A rule may be decomposed into two parts p(s) and d(s) such that snext = if p(s) then d(s) elses p(s)is the condition (predicate) of the rule, a.k.a. the “CAN_FIRE” signal of the rule. (conjunction of explicit and implicit conditions) d(s) is the “state transformation” function, i.e., computes the next-state value in terms of the current state values. http://csg.csail.mit.edu/6.375/

  4. Compiling a Rule rule r (f.first() > 0) ; x <= x + 1 ; f.deq (); endrule enable p f f x x d current state next state values rdy signals read methods enable signals action parameters p = enabling condition d = action signals & values http://csg.csail.mit.edu/6.375/

  5. R d1,R dn,R Combining State Updates: strawman p1 p’s from the rules that update R OR pn latch enable OR d’s from the rules that update R next state value What if more than one rule is enabled? http://csg.csail.mit.edu/6.375/

  6. R d1,R dn,R Combining State Updates f1 Scheduler: Priority Encoder p1 OR p’s from all the rules pn fn latch enable OR d’s from the rules that update R next state value Scheduler ensures that at most one fi is true http://csg.csail.mit.edu/6.375/

  7. One-rule-at-a-time Scheduler p1 Scheduler: Priority Encoder f1 p2 f2 pn fn 1. fi  pi 2. p1  p2  ....  pn  f1  f2  ....  fn 3. One rewrite at a time i.e. at most one fi is true Very conservative way of guaranteeing correctness http://csg.csail.mit.edu/6.375/

  8. Executing Multiple Rules Per Cycle:Conflict-free rules rule ra (z > 10); x <= x + 1; endrule rule rb (z > 20); y <= y + 2; endrule Parallel execution behaves like ra < rb = rb < ra Rulea and Ruleb are conflict-free if s . pa(s)  pb(s)  1. pa(db(s)) pb(da(s)) 2. da(db(s)) ==db(da(s)) Parallel Execution can also be understood in terms of a composite rule rule ra_rb((z>10)&&(z>20)); x <= x+1; y <= y+2; endrule http://csg.csail.mit.edu/6.375/

  9. Executing Multiple Rules Per Cycle:Sequentially Composable rules rule ra (z > 10); x <= y + 1; endrule rule rb (z > 20); y <= y + 2; endrule Rulea and Ruleb are sequentially composable if s . pa(s)  pb(s) pb(da(s)) Parallel execution behaves like ra < rb Parallel Execution can also be understood in terms of a composite rule rule ra_rb((z>10)&&(z>20)); x <= y+1; y <= y+2; endrule http://csg.csail.mit.edu/6.375/

  10. rule ra_rb(z>10 && z>20); x <= 2; endrule Behavior ra < rb rule rb_ra(z>10 && z>20); x <= 1; endrule Behavior rb < ra Sequentially Composable rules ... rule ra (z > 10); x <= 1; endrule rule rb (z > 20); x <= 2; endrule Parallel execution can behave either like ra < rb or rb < ra but the two behaviors are not the same Composite rules http://csg.csail.mit.edu/6.375/

  11. Compiler determines if two rules can be executed in parallel Rulea and Ruleb are conflict-free if s . pa(s)  pb(s)  1. pa(db(s)) pb(da(s)) 2. da(db(s)) ==db(da(s)) Rulea and Ruleb are sequentially composable if s . pa(s)  pb(s) pb(da(s)) D(Ra)  R(Rb) =  D(Rb)  R(Ra) =  R(Ra)  R(Rb) =  D(pb)  R(Ra) =  These properties can be determined by examining the domains and ranges of the rules in a pairwise manner. These conditions are sufficient but not necessary. Parallel execution of CF and SC rules does not increase the critical path delay http://csg.csail.mit.edu/6.375/

  12. Mutually Exclusive Rules • Rulea and Ruleb are mutually exclusive if they can never be enabled simultaneously s . pa(s)  ~ pb(s) Mutually-exclusive rules are Conflict-free even if they write the same state Mutual-exclusive analysis brings down the cost of conflict-free analysis http://csg.csail.mit.edu/6.375/

  13. p1 f1 Scheduler p2 f2 Scheduler Scheduler pn fn Multiple-Rules-per-Cycle Scheduler Divide the rules into smallest conflicting groups; provide a scheduler for each group 1. fi  pi 2. p1  p2  ....  pn  f1  f2  ....  fn 3.Multiple operations such that fi  fj  Ri and Rj are conflict-free or sequentially composable http://csg.csail.mit.edu/6.375/

  14. Conflict Free (Mutually exclusive) d1 p1 d2 d2 p2 p2 Sequentially composable d1 p1 and ~p2 and and or or and and Muxing structure • Muxing logic requires determining for each register (action method) the rules that update it and under what conditions CF rules either do not update the same element or are ME p1  ~p2 http://csg.csail.mit.edu/6.375/

  15. p1 pn d1 dn Scheduling and control logic Modules (Current state) Modules (Next state) “CAN_FIRE” “WILL_FIRE” Rules p1 f1 Scheduler fn pn d1 Muxing cond action dn http://csg.csail.mit.edu/6.375/

  16. some insightPictorially rule steps Ri Rj Rk Rules Rj HW Rk clocks Ri • There are more intermediate states in the rule semantics (a state after each rule step) • In the HW, states change only at clock edges http://csg.csail.mit.edu/6.375/

  17. Parallel executionreorders reads and writes Rules rule steps reads writes reads writes reads writes reads writes reads writes reads writes reads writes clocks HW • In the rule semantics, each rule sees (reads) the effects (writes) of previous rules • In the HW, rules only see the effects from previous clocks, and only affect subsequent clocks http://csg.csail.mit.edu/6.375/

  18. Correctness rule steps Ri Rj Rk Rules Rj HW Rk clocks Ri • Rules are allowed to fire in parallel only if the net state change is equivalent to sequential rule execution (i.e., CF or SC) • Consequence: the HW can never reach a state unexpected in the rule semantics http://csg.csail.mit.edu/6.375/

  19. Synthesis Summary • Bluespec generates a combinational hardwarescheduler allowing multiple enabled rules to execute in the same clock cycle • The hardware makes a rule-execution decision on every clock (i.e., it is not a static schedule) • Among those rules that CAN_FIRE, only a subset WILL_FIRE that is consistent with a Rule order • Since multiple rules can write to a common piece of state, the compiler introduces appropriate muxing logic • For proper pipelining, dead-cycle elimination and value forwarding, the user needs some understanding and control of scheduling http://csg.csail.mit.edu/6.375/

  20. rf pc CPU fetch & decode execute bu Two-stage Pipeline rule fetch_and_decode (!stallfunc(instr, bu)); bu.enq(newIt(instr,rf)); pc <= predIa; endrule Can these rules fire concurrently ? No! Conflicts around: pc, bu and rf rule execute (True); case (it) matchestagged EAdd{dst:.rd,src1:.va,src2:.vb}: begin rf.upd(rd, va+vb); bu.deq(); end tagged EBz {cond:.cv,addr:.av}: if (cv == 0) then begin pc <= av; bu.clear(); end else bu.deq();tagged ELoad{dst:.rd,addr:.av}: begin rf.upd(rd, dMem.read(av)); bu.deq(); end tagged EStore{value:.vv,addr:.av}: begin dMem.write(av, vv); bu.deq(); end endcase endrule Seq Comp? Try 1. fetch < execute 2. execute < fetch http://csg.csail.mit.edu/6.375/

  21. rf pc CPU fetch & decode execute bu Two-stage Pipeline Analysis 1. fetch < execute 2. execute < fetch - will behave like a non-pipelined machine - will behave like a pipeline with bypasses http://csg.csail.mit.edu/6.375/

  22. Scheduling expectations: execute < fetch schedule rule fetch_and_decode (!stallfunc(instr, bu)); bu.enq(newIt(instr,rf)); pc <= predIa; endrule pc: conflict in case of Bz Separate the Bz part of the rule rule execute (True); case (it) matchestagged EAdd{dst:.rd,src1:.va,src2:.vb}: begin rf.upd(rd, va+vb); bu.deq(); end tagged EBz {cond:.cv,addr:.av}: if (cv == 0) then begin pc <= av; bu.clear(); end else bu.deq();tagged ELoad{dst:.rd,addr:.av}: begin rf.upd(rd, dMem.read(av)); bu.deq(); end tagged EStore{value:.vv,addr:.av}: begin dMem.write(av, vv); bu.deq(); end endcase endrule bu:(first < deq) < (find < enq) what about clear? rf: upd < sub http://csg.csail.mit.edu/6.375/

  23. One Element FIFO Analysis module mkFIFO1 (FIFO#(t)); Reg#(t) data <- mkRegU(); Reg#(Bool) full <- mkReg(False); methodAction enq(t x) if (!full); full <= True; data <= x; endmethod methodAction deq() if (full); full <= False; endmethod method t first() if (full); return (data); endmethod methodAction clear(); full <= False; endmethod endmodule deq < enq ? No. ME first < deq ? Yes. first < enq ? No. ME Expectation bu: (first<deq) < (find<enq) http://csg.csail.mit.edu/6.375/

  24. The good news ... • It is always possible to transform your design to meet desired concurrency and functionality http://csg.csail.mit.edu/6.375/

  25. write.x write.en read read’ 0 1 Register Interfaces read < write write < read ? D Q read’ – returns the current state when write is not enabled read’ – returns the value being written if write is enabled http://csg.csail.mit.edu/6.375/

  26. write0.x write1.x write1.en write0.en read1 read0 0 0 D Q 1 1 Ephemeral History Register (EHR) [MEMOCODE’04] read0 < write0 < read1< write1 < …. writei+1 takes precedence over writei http://csg.csail.mit.edu/6.375/

  27. Transformation for Performance rule fetch_and_decode (!stallfunc(instr, bu)1); bu.enq1(newIt(instr,rf)); pc <= predIa; endrule execute < fetch_and_decode  rf.upd0 < rf.sub1 bu.first0 < {bu.deq0, bu.clear0} < bu.find1 < bu.enq1 rule execute (True); case (it) matchestagged EAdd{dst:.rd,src1:.va,src2:.vb}: begin rf.upd0(rd, va+vb); bu.deq0(); end tagged EBz {cond:.cv,addr:.av}: if (cv == 0) then begin pc <= av; bu.clear0(); end else bu.deq0();tagged ELoad{dst:.rd,addr:.av}: begin rf.upd0(rd, dMem.read(av)); bu.deq0(); end tagged EStore{value:.vv,addr:.av}: begin dMem.write(av, vv); bu.deq0(); end endcase endrule http://csg.csail.mit.edu/6.375/

  28. One Element FIFOusing EHRs module mkFIFO1 (FIFO#(t)); EHReg2#(t) data <- mkEHReg2U(); EHReg2#(Bool) full <- mkEHReg2(False); method Action enq0(t x) if (!full.read0); full.write0 <= True; data.write0 <= x; endmethod methodAction deq0() if (full.read0); full.write0 <= False; endmethod method t first0() if (full.read0); return (data.read0); endmethod methodAction clear0(); full.write0 <= False; endmethod endmodule first0 < deq0 < enq1 methodAction enq1(t x) if (!full.read1); full.write1 <= True; data.write1 <= x; endmethod http://csg.csail.mit.edu/6.375/

  29. After Renaming • Things will work • both rules can fire concurrently Programmer Specifies: Rexecute < Rfetch Compiler Derives: (first0, deq0) < (find1, deq1) What if the programmer wrote this? Rexecute < Rexecute < Rfetch < Rfetch http://csg.csail.mit.edu/6.375/

  30. RF IF Dec Exe Mem Wb bI bD bE bW iMem dMem Experiments in schedulingDan Rosenband, ICCAD 2005 • What happens if the user specifies: No change in rules Wb < Wb < Mem < Mem < Exe < Exe < Dec < Dec < IF < IF a superscalar processor! A cycle in slow motion I9 I8 I7 I6 I5 I4 I3 I2 I1 I0 Executing 2 instructions per cycle requires more resources but is functionally equivalent to the original design http://csg.csail.mit.edu/6.375/

More Related