Construction Management at Risk Navigating Challenges and Maximizing Success

Construction Management at Risk (CMAR) is a project delivery method where a construction manager commits to delivering the project within a Guaranteed Maximum Price (GMP).

armandcorp
Télécharger la présentation

Construction Management at Risk Navigating Challenges and Maximizing Success

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ConstructionManagementat Risk:NavigatingChallenges andMaximizingSuccess ConstructionManagementatRisk(CMAR)isaproject deliverymethodwhereaconstructionmanagercommitsto delivering the projectwithinaGuaranteedMaximumPrice (GMP). RoleofConstructionManager:Actsasaconsultantduring thedesignphaseandasageneralcontractorduringthe constructionphase. WhyCMAR? Balancesriskbetween theownerand the contractor, promotescollaboration, andenhancesproject control.

  2. KeyPhasesinCMAR Pre-ConstructionPhase: Involvesplanning,design,andbudgeting. Earlyinvolvementoftheconstructionmanagerensures bettercostestimationandprojectplanning. ConstructionPhase: Transitionfromplanningtoactualconstruction. Construction manageroverseesprojectexecution,ensuring adherencetoschedule andbudget. Post-ConstructionPhase: Projectcloseout,finalinspections,and turnovertothe owner. Ensures allcontractualobligationsaremetand documentationiscompleted.

  3. BenefitsofCMAR CostControl:GMPlimitsthefinancialriskfortheowner. ScheduleAdherence:Earlyinvolvementoftheconstruction managerhelpsinrealisticschedulingandtimelycompletion. QualityAssurance:Continuousoversightensureshigh standardsandadherencetospecifications. Collaborative Environment:Promotesteamworkbetweenthe owner,architect,andcontractor,leadingtoinnovative solutionsandproblem-solving.

  4. ChallengesinCMAR RiskAllocation:Properlybalancingriskbetweentheowner andconstructionmanagercanbecomplex. CostOverruns:WhileGMPsets acap,unforeseen issuescan stillleadto financialchallenges. Communication:Requiresrobustcommunicationchannelsto ensurealignmentamongallstakeholders. ScopeChanges:Managing changes inproject scopewithout impactingtheGMPorschedulecanbechallenging.

  5. BestPracticesinCMAR EarlyInvolvement:Engage theconstruction manager earlyinthedesignphasetoleveragetheirexpertise. TransparentCommunication:Fosteropenandregular communicationamongallprojectstakeholders. DetailedPlanning:Investtimeinthoroughplanningand riskassessmenttoanticipateandmitigatepotential issues. ContinuousMonitoring:Implementrobustmonitoring systemstotrackprogress,costs,and qualitythroughout theprojectlifecycle.

  6. FutureTrendsinCMAR ·TechnologyIntegration:UtilizationofBuilding InformationModeling(BIM)andothertechnologiesto enhanceprojectplanningandexecution. ·SustainabilityFocus:Increasingemphasisonsustainable constructionpracticesandmaterials. ·EnhancedCollaborationTools:Adoptionofadvanced collaboration tools toimprovecommunicationand coordination. ·RegulatoryChanges:Awarenessofevolvingregulations andstandardsimpactingCMARpractices.

  7. ContactUs +212.542.4179 141West36thStreetSuite1602 NewYork,NY10018 www.armandcorp.com