1 / 10

The latest on GÉANT 100G+ … (Terabit capacity)

The latest on GÉANT 100G+ … (Terabit capacity). Richard Hughes-Jones DANTE Delivery of Advanced Network Technology to Europe LHCONE Meeting Stockholm, 3-4 May 2012. GÉANT & NREN Connectivity & Network Services. 40 European Countries Dark Fibre + DWDM Hybrid network:

armina
Télécharger la présentation

The latest on GÉANT 100G+ … (Terabit capacity)

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. The latest on GÉANT 100G+ …(Terabit capacity) Richard Hughes-Jones DANTE Delivery of Advanced Network Technology to Europe LHCONE Meeting Stockholm, 3-4 May 2012

  2. GÉANT & NRENConnectivity & Network Services • 40 European Countries • Dark Fibre + DWDM • Hybrid network: • IP Packet routedIPv6, multicast, VPN • Point-to-point Circuitstypically 1Gbit/s • Dedicated LambdasFull 10Gbit/s • BoD • Network monitoring • Security • Mobility To download this map: http://www.geant.net/Media_Centre

  3. The procurement trail • Started at the beginning of 2010 with an RFI exercise (6 months) • Launched a formal procurement process (Competitive Dialogue) at the end of 2010 in 3 lots • Dialogue ran throughout 2011 • Examined different approaches to: • “100G-optimised” transmission… • …that didn’t hinder continued flexible deployment of 10G services [lot 1] • “Packet transport” solutions for switching layer [lot 2] • Converged (“POTS”) solutions [lot 3] • Refined requirements during dialogue • Solicited another round of solutions (without lot 3) • Shortlisted • Hands-on (lab testing) & more dialogue • ITT issued at end of 2011

  4. Approach to technology choices • Technology agnostic approach to transmission • e.g. did not specify DCM-based or DCM-free, ROADM specifics, etc • BUT service & operational feature prescriptions were made, e.g. • “optimisation” for delivery of 100G; • in final ITT, suppliers mandated to include flexible, zero-touch provisioning of 10G “lambdas” (even if solution not supporting native 10G lambdas) • effectively meant include OTN switching • “Classical MPLS” approach to switching (lot 2) was mandated • Alternatives (MPLS-TP, PBB-TE) did not look sufficiently convincing during dialogue • Lot 3 dropped • Converged/integrated (“POTS”) solutions did not appear sufficiently convincing during dialogue

  5. And the winner(s) are… … sorry can’t say right now WATCH THIS SPACE…

  6. But … • Starting Q2 2012 • GEANT will roll-out its newest network providing 100s of Terabits of switching capacity across Europe… • …by creating a Hybrid infrastructure that is: • …Multi Domain with a dense Pan European footprint • …with aggregated Peta Bit Class switching and… • …with Multi Tera Bit nodes and… • …with hundreds of Giga Bit transmission and… • …with a Global reach to all regions in the World.

  7. Day-1 architecture (high level) PL RU ES HR SK CZ UK DK CH DE RO BG BE LT LV EE LU IE NL AT Fink HU KEY FR SI IT 100G lambda Nx10GE lambda Nx10GE lambda (detail TBD) Nx10G leased lambdas PT GR

  8. Switch Switch IP Router IP Router Inside the GÉANT PoPThe Hybrid GÉANT+ services Lambdas To NREN B To NREN A Lambdas IP Backup Primary IP Peering GÉANT+ IP Backup Primary IP Peering GÉANT+ Backup IP Peering for NREN A Dark fibre/amplifier chain GÉANT POP A GÉANT POP B

  9. IP Router IP Router Inside the GÉANT New PoP To NREN A To NREN B IP Backup GÉANT+ * BoD* GÉANT+ BoD IP Backup Lambdas Lambdas Primary IP Peering Primary IP Peering Backup IP Peering for NREN A GÉANT POP B GÉANT POP A Dark fibre/amplifier chain * Includes 10G and greater Optical Switch

  10. Summary Clear drivers to upgrade GÉANT infrastructure now to move it Towards Terabits Lengthy procurement process is now almost complete This means 1x100G this year (plus another ~100G’s worth of 10Gs) in production on many of the main trunks Growth thereafter… expect to keep up the ~50% pa Terabit ETA around 2016 Also expect to be field trialing 400G and TB transmission within similar time frames (research network remit)… And endeavour to support the more niche applications… e.g. “photonic services” Time scales: Start very soon – Rollout: June – May 2013

More Related