HT-7. ASIPP. Daily Operation Report Operation Team I. X.Gong, H.Wang, Y.Jie, J.Huang, Z.Chen, Y.Xu, X.Zhang. 22 –23 May 2004. Synergy of LHW+IBW (08:30-13:00) Ip Ramp-down (15:30-20:30) Probe Scan (01:30-06:30) SXS Calibration ( LHCD) (06:30-08:00) Shot No. #69280~#69***.
Télécharger la présentation
ASIPP
An Image/Link below is provided (as is) to download presentation
Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.
Content is provided to you AS IS for your information and personal use only.
Download presentation by click this link.
While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.
During download, if you can't get a presentation, the file might be deleted by the publisher.
E N D
Presentation Transcript
HT-7 ASIPP Daily Operation Report Operation Team I X.Gong, H.Wang, Y.Jie, J.Huang, Z.Chen, Y.Xu, X.Zhang 22 –23 May 2004
Synergy of LHW+IBW (08:30-13:00) • Ip Ramp-down (15:30-20:30) • Probe Scan (01:30-06:30) • SXS Calibration ( LHCD) (06:30-08:00) • Shot No. #69280~#69*** • It: 3500A-4100A • Pout~2.5E-4Pa Pin~4.5E-4Pa-9.0E-6Pa • PLHW:~280KW PIBW:~220KW • 2#TMP Quench! IBW system ?
Probe Scan (T.Lan USTC) IP~100KA/150KA ne~1.0/2.0