An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Shelter project PAKISTAN Federation Shelter Technical Training 03/03/08 – 07/03/08 Yverdon-Les-Bains, SUISSE

  2. Shelter project PAKISTAN Localisation Union Council Gijbori and Kuza Banda,Battagram District, North West Frontier Province, Pakistan IFRC Shelter Technical Training

  3. Shelter project PAKISTAN The Earthquake • In the zone of convergence between the Indian and the Eurasian plates  frequent earthquakes • Particularly affected because of the propensity for post-quake landslides • On 8th of October 2005, an earthquake (7.6 on the Richter scale) destroyed entire cities and villages in Azad Jammu and Kashmir and the Northwest Frontier Province  more than two and half million people homeless IFRC Shelter Technical Training

  4. Shelter project PAKISTAN Objective Provide to the earthquake victims a temporary shelter to protect them from extreme weather conditions in Battagram district  construction of 1000 shelters Duration of the operation The program ended on 2006, 21st of May and its implementation lasted 4 months IFRC Shelter Technical Training

  5. Shelter project PAKISTAN Designing project proposal First project proposal version: participatory approach using shelters made with sand bags, a basic wooden frame and covered with galvanized sheets  rejected regarding the short term dead line fixed IFRC Shelter Technical Training

  6. Shelter project PAKISTAN Designing project proposal Second version (approved) : shelter made with a basic iron frame, a set of banded and straight pipes covered by 14 CGI sheets, insulated by dry grass materiel and the whole structure covered by a water proof parachute tent IFRC Shelter Technical Training

  7. Shelter project PAKISTAN Shelter design MS banded galvanise pipe; Ø:1 In, Thick:18 gauges MS Strengthening galvanise pipe; Ø:1 In, Thick:18 gauges 13 ft/ 3.95 m 15 ft/ 4.5 m Detailed view Supporting pipes IFRC Shelter Technical Training

  8. Shelter project PAKISTAN Building specifications 1 – The iron frame structure is made with: • 6 iron MS banded pipes diameter 2,5 cm and thickness 2 mm • 8 iron strengthening pipes diameter 2,5 cm and thickness 2 mm 2 – The whole shelter is going to be covered by Corrugatedgalvanise iron pipe (CGI) 3 - Insulation material made by dry grass is going to be set up over the CGI and fixed on 4 - The whole structure will be covered by a water proof parachute 5 – Nuts, bolts and washers have to be factored trough galvanisation process Total surface : 17.75 m2, 13ft X15ft IFRC Shelter Technical Training

  9. Shelter project PAKISTAN Project methodology over view Three phases were necessary to carry out the project in a proper way: • Assessment phase • Distribution phase • Monitoring tasks and field feedback IFRC Shelter Technical Training

  10. Shelter project PAKISTAN Project methodology over view 1. Assessment phase IFRC Shelter Technical Training

  11. Shelter project PAKISTAN Project methodology over view 2. Distribution phase IFRC Shelter Technical Training

  12. Shelter project PAKISTAN Project methodology over view 3. Monitoring tasks and field feedback IFRC Shelter Technical Training

  13. Shelter project PAKISTAN Criteria of eligibility • Priority : widows and disables In total over both union councils: • 132 disables have been registered as a beneficiary • 387 widows have been registered as a beneficiary • An extra category has been targeted: the most vulnerable population according to the statement of their houses 481 persons have been registered as a beneficiary IFRC Shelter Technical Training

  14. Shelter project PAKISTAN Technical assistance and field monitoring • Technical assistance : carried out by 6 constructor specialists previously trained for the erection of the shelter. • A team of two construction specialists organized one practical training session per village involving the whole community  all the beneficiaries were enough sustainable to erect on their own the shelter they get. • A field visit was then organized in order to provide assistance and give advice for the shelter erection, location and maintenance. IFRC Shelter Technical Training