aspen
Uploaded by
21 SLIDES
387 VUES
210LIKES

Skyracks

DESCRIPTION

Skyracks. Sam Bennett Arbaaz Khan. Agenda. Team roles problem statement Statement of purpose Justification Timeline Research Market Research Buyers and consumers Market of backpacks Geography of selling Survey Data Designs Decision Matrix Prototype Testing and data

1 / 21

Télécharger la présentation

Skyracks

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Skyracks Sam Bennett Arbaaz Khan

  2. Agenda • Team roles • problem statement • Statement of purpose • Justification • Timeline • Research • Market Research • Buyers and consumers • Market of backpacks • Geography of selling • Survey Data • Designs • Decision Matrix • Prototype • Testing and data • Refinements • Final Solution • Future

  3. Team roles • Leader: Both • Scribe: Samantha • Timekeeper: Arbaaz

  4. Problem Statement • Due to the poor distribution of weight across the body by traditional two strap backpacks, over twenty million American middle and high school students exceed the recommended amount of stress (15% of their body weight) placed on their shoulders, neck, and lower back resulting in pain, distortion of the natural "S" curve of the spine, and poor posture. According to a study performed in May of 2002 to May of 2003 by the Consumer Product Safety Commission, an estimated 21,000 children were admitted to an emergency room from backpack related injuries.

  5. Statement of Purpose • Reduce the negative impact on posture and pain felt by students while wearing a backpack.

  6. Justification • A survey conducted by The American Academy of Orthopedic Surgeons of 101 doctors showed: • 70% of doctors believe backpacks are a clinical problem for children. • The majority of doctors believe backpacks become a clinical problem at 20% of the wearer’s body weight. • 58% of doctor’s surveyed have seen school-age patients complaining of back and shoulder pain from heavy backpacks. • Retrieved from: http://www.chiro.org/LINKS/FULL/AAOS_tells_media.shtml

  7. Justification • According the American Chiropractic Association, backpack related injuries were the cause of over 7,000 emergency room visists in 2001. • “In my own practice, I have noticed a marked increase in the number of young children who are complaining about back, neck and shoulder pain,” -Dr. Scott Bautch, a member of the ACA's Council on Occupational Health. Retrieved from: http://www.spineuniverse.com/wellness/ergonomics/backpack-misuse-leads-chronic-back-pain-doctors

  8. TimeLine

  9. Gantt Chart

  10. Performance Benchmarks • Fully functional and usable as a backpack • Can hold at least 444 Lbs • 1 lb = 4.44 N

  11. What problems do you currently experience with backpacks? (Taken from our online surveys) • “Too heavy to lift, hard to put on, and feels way to heavy on back.” • “Pain in my shoulders.” • “Textbooks are too heavy to carry on the shoulders/back.” • “The weight I carry is too heavy and it hurts my back/shoulders.” • “Painful straps or too little space”

  12. Sketches

  13. Decision Matrix

  14. Build process

  15. Test data

  16. Refinements

  17. Final Prototype

More Related