An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. CMPT371 – Team 1

  2. Project – Luminance • Puzzle game • Guide a beam of light using a limited set of tools to certain goals avoiding obstacles along the way. • Previous milestone • Adding polish and robustness. • Finished off important features for playing. • Current milestone • Further refinement and debugging. • User evaluations and play testing.

  3. New Development • Level Menu • For navigating between levels • Level Editor • To create levels for the game • In-game Help Documentation • Instructions for playing the game • Light beam • Bigger, better, flowier • Fixed a lot of little things for polish • Lots o levels!

  4. Issues With Development • Infuriating emulator • Slow, renders in software mode, bugs... • Incompatible OS • Android study we were borrowing phones from used a custom OS sans hardware acceleration! • Build setup • Initial overhead MUCH more than expected • Most of milestone 1 spent on this

  5. Issues With Development • Modularity without full discourse • We planned and designed well • However, we still ran into problems • Testing • High overhead but low impact • Build script issues • Did help strengthen our code base • New features • Didn’t have time to implement them • .. But we’re happy with our accomplishments!

  6. Software Engineering Processes • Use of issue tracker to drive development • Used for issues, enhancements, features • Helped with communication • Team modularity • Explicit task separation within each of the subgroups • Lead to very modular code base as well • Meetings within the group • Regular group meetings • Use of Skype

  7. Software Engineering Processes • Use of logger • Gave us high-level call stack • Chain of Command • Leads oversaw progress in their respective areas • Project manager overseeing everybody • Peer reviews, personal desk-checks, formal inspections • Further refinement of the code base • Flushing out bugs and defects

  8. Software Engineering Processes • Development environment • Eclipse, google code • Integration with TeamCity • Emulator did help with development • We don’t all own Android phones! • Smoke test build on TeamCity • Created with the purpose of running before commits

  9. Formal Inspections • Did 6 this milestone • Found a total of 82 defects this milestone • 101 altogether • Along with Professor Osgood’s advice from the lab, creating much nicer code.

  10. CPM Diagram

  11. Testing • GUI Testing • Complete • Mock Testing • On the interfaces we have • Test Suite • Up to date

  12. User Evaluations • Surveyed 22 people • 2 Groups: • Experienced players (10) • Inexperienced players (12) • Players split into control and experimental groups: • Control: told how to play and given help • Experimental: minimal instruction

  13. User Evalutation Results

  14. User Evalutation Results

  15. User Evaluation Results

  16. Risk Analysis: New Risks • Description • Limited test phones available due to OpenGL issues • Probability: High • Severity: High • Plan: • Attempt to locate devices that have the required libraries to make the game runnable • If all else fails, simply install a different custom OS on the devices that allow for acceptable graphics functionality • Status: Realized, dealing with it

  17. Risk Analysis: Final Update • Risks realized: 5/12 • Ensuring effective communication • Losing group members • Ensuring successful port • Android phone performance • Due date miscommunication • Risks resolved by contingency plan: 5/12 • Use of mailing lists and wiki • Enhanced communication helped us stay together • Eliminating extra features to ensure quality of core features • Found OS that is compatible with the application • PM smartened up and double checked due dates 

  18. Risk Analysis: Final Update • Risks prevented by mitigation plan: 7/12 • Continuous Integration • Use of TeamCity and Smoke test • Set up of development environment • Not an issue with the information readily on the wiki early and comprehensively • Touch input integration • Researched it thoroughly and found ReplicaIsland • Implementation of all resources in a convenient way • Zenja keeping it up to date

  19. Risk Analysis: Final Update • Con’t • Vague requirements causing defects • Formalize new ideas before implementation • Limited user evaluations resulting in game play issues • Completed user evaluations • Keep memory used low and performance high • Keeping textures small

  20. Time Spent • Milestone 1: 137.5 • Milestone 2: 180.5 • Milestone 3: 184 • Milestone 4: 133 • Milestone 5: TBA • Total: 635 • Average: 1.25 hours/day/person

  21. Questions? • The end!