1 / 7

9104/3 Re-write Team Update September 2014 – Savannah, GA Will Tate Triumph Group

9104/3 Re-write Team Update September 2014 – Savannah, GA Will Tate Triumph Group. Developed Technical Competence Requirements – Bremen, Germany Included new auditor grade – ALA (AQMS Lead Auditor), AELA (former AEA) 2 yrs /10 yrs experience in manufacturing - not in Aerospace (ALA)

Télécharger la présentation

9104/3 Re-write Team Update September 2014 – Savannah, GA Will Tate Triumph Group

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 9104/3 Re-write Team UpdateSeptember 2014 – Savannah, GAWill TateTriumph Group

  2. Developed Technical Competence Requirements – Bremen, Germany • Included new auditor grade – ALA (AQMS Lead Auditor), AELA (former AEA) • 2 yrs/10 yrsexperience in manufacturing - not in Aerospace (ALA) • No impact on existing AEAs that successfully complete CVP • Clarification of Aerospace Industry Experience (AELA) • Specifically identifies type of work/tasks performed • Auditor Grades • AA – ASD Auditor • ALA – ASD Lead Auditor - New • AELA (AEA) – ASD Experienced Lead Auditor • Completed team comments review and incorporation • Competence appendix table formatted and included in draft • QMS auditing competence table/form format update • SDR comments draft update resubmitted to SAE editor – 8/08/14 • SAE Editor feedback – 9/01/14 • Final SDR disposition - ECD 9/24/14

  3. Aerospace Experience Clarification • The full-time work experience shall have included at least 5 of the following specific aspects: • Aviation or space quality assurance and quality control • Military or civil aviation or space regulatory requirements • First article inspection, • Airworthiness and safety requirements, • Material traceability requirements, • Sub-contractor approval and control • Variation management of key characteristics, • Flow-down of requirements • Con’t

  4. Aerospace Experience Clarification (con’t) • Foreign object damage/debris (FOD) prevention program, • Use of customer supplied products, • Calibration controls and positive recall system, • Acceptance authority media, • Non-conforming material management, • Sampling, inspection, statistical process control requirements and limitations or testing • Special processes, • Configuration management/requirements control, • Manufacturing, maintenance or overhaul techniques, • Design and development

  5. AS auditor Authentication Process (in draft)

  6. Next Steps • Finalize SAE Editor 2nd review feedback – 9/24/2014 • Preparation of document for ballot – 9/2014 • Development of CVP (team in work) – John Horan: Team Leader

  7. Questions? Questions and Thoughts Indianapolis, IN - July 16/17, 2013

More Related