1 / 16

Locational Signals for Generation and Transmission investment

Locational Signals for Generation and Transmission investment. Transmission Investment: “the knottiest problem in the (energy) deregulation process” Steven Stoft. Locational Signals for Generation and Transmission investment. The aim is to avoid: Wrongly located generation

Télécharger la présentation

Locational Signals for Generation and Transmission investment

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Locational Signals for Generation and Transmission investment • Transmission Investment: “the knottiest problem in the (energy) deregulation process” Steven Stoft ACCC Regulation Conference 2010- Steve Edwell

  2. Locational Signals for Generation and Transmission investment • The aim is to avoid: • Wrongly located generation • Crowding out efficient generation by transmission overbuild • Delay in efficient transmission augmentation ACCC Regulation Conference 2010- Steve Edwell

  3. Locational Signals for Generation and Transmission investment • Transmission investment is lumpy • A “chicken and egg dilemma” • Outdated transmission flow analysis • Generation tends to happen first ACCC Regulation Conference 2010- Steve Edwell

  4. Chart 1 High Cost Generators Low Cost Generators Small Loads Large Loads A B ACCC Regulation Conference 2010- Steve Edwell

  5. Chart 2(a) High Cost Generators Low Cost Generators Small Loads Large Loads A B New Generator ACCC Regulation Conference 2010- Steve Edwell

  6. Chart 2(b) High Cost Generators Low Cost Generators Small Loads Large Loads A B X New Generator ACCC Regulation Conference 2010- Steve Edwell

  7. Chart 3 High Cost Generators Low Cost Generators Price Region 1 Price Region 2 Small Loads Large Loads A B X New Generator ACCC Regulation Conference 2010- Steve Edwell

  8. Chart 4 High Cost Generators Low Cost Generators Price Region 1 Small Loads Large Loads A B X New Generator ACCC Regulation Conference 2010- Steve Edwell

  9. Locational Signals for Generation and Transmission investment • Question: Do we need better regulatory incentives for TNSP’s, some exposure to transmission costs by generators, or a return to some form of central planning; or perhaps a mix of these? ACCC Regulation Conference 2010- Steve Edwell

  10. Locational Signals for Generation and Transmission investment • NEM Framework: • Generators pay direct connection costs and loss factor location signals • But these signals are weak • No location price signals • Mis-pricing/disorderly bidding ACCC Regulation Conference 2010- Steve Edwell

  11. Output of Kogan Creek and imports into Qld across QNI (1) Chart 5 ACCC Regulation Conference 2010- Steve Edwell

  12. Output of Kogan Creek and imports into Qld across QNI (2) Chart 5a ACCC Regulation Conference 2010- Steve Edwell

  13. Locational Signals for Generation and Transmission investment • Recent NEM policy initiatives in response to remote generation: • Remote generation zones (Scale efficient network extensions – SENEs) • Individual generators will pay only their own efficient network connection costs • Users will assume the risk of non arrival • Regulatory oversight of SENEs costs by AER. ACCC Regulation Conference 2010- Steve Edwell

  14. Locational Signals for Generation and Transmission investment • Recent NEM policy initiatives in response to remote generation (con’t): Further recommendations: • Introduce a transmission charge • Pockets of material/transitory congestion should be priced ACCC Regulation Conference 2010- Steve Edwell

  15. Locational Signals for Generation and Transmission investment • The Western Australian WEM: • Generators pay connection and costs of deep network impacts • Potential for recompensation • Quantifiable net market benefits of the connection can be offset ACCC Regulation Conference 2010- Steve Edwell

  16. Locational Signals for Generation and Transmission investment • Concluding Points: • We can’t rely on a market solution • Is better price signals part of the solution? • Better incentives for TNSP’s? • A role for (proactive) planning ACCC Regulation Conference 2010- Steve Edwell

More Related