This document outlines the structured project plan for the B-C Master Project, initiated on May 20, 1970. It includes detailed phases on procurement, assembly, testing, and circuit design, ensuring maximum performance across various components such as TTL/PWB routing rules and the development of critical prototypes (PROTOB1, PROTOB2, PROTOB3, PROTOA1, PROTOA2, PROTOA3). The plan emphasizes the importance of thorough testing and evaluation at every stage, alongside a timeline for artwork revisions and the management of design logic, ensuring a robust framework for project execution.
E N D
PROGETTO B-C … LIVELLO 62 Master project plan May 20, 1970
B A PROTOB3 T PWA’S TEST N I G M U TEST ASSY O J H Q TTL CIRCUITS PROCUREMENT PROTOB2 PWA’S ASSEMBLY P N I G M PWB’S PROCUREMENT ASSY TEST O J H Q PROTOB1 PRELIMINARY TTL/PWB ROUTING RULES FINAL TTL/PWB ROUTING RULES ROS & PWB’S PROCUREMENT TEST & DOC. RELEASE MAKE PWS’S ARTWORKS REVISION ASSY PWB’S SKETCHING LOGIC DESIGN C N I G M Y O J H Q PROTOA1 Z D E V SMALL DISK DEB. LINE DEB. CPU DEB. PROG. FLOWS PROGRAMMING FLOWS WW BACKPANELS WW CPU & ROS ASSY TEST MAX PERFORMANCES F G H ROS SIMULATION CPU DESIGN ROS STACKS PROCUREMENT ROS TEST Q W O I J L M PROGRAMS PROG. K N CPU & PERIF. DEB. DISK DEB. LINE DEB. PROTOA2 ASSY IPR STEP 2 Q O G H F M ASSY & UPDATE EVALUATION TEST TEST I J N R S IPR STEP 2 PREPARATION PROTOA3 F G H M N J I O Q B-C MASTER PROJECT PLAN MAY 20, 1970
B-C MASTER PROJECT PLAN MAY 20, 1970