SRP Ten Year Plan 2010 -2019

SRP Ten Year Plan 2010 -2019. WestConnect Annual Planning Workshop Robert Kondziolka Manager, Salt River Project Phoenix, Arizona November 4, 2009.

avi
Télécharger la présentation

SRP Ten Year Plan 2010 -2019

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. SRP Ten Year Plan2010 -2019 WestConnect Annual Planning Workshop Robert Kondziolka Manager, Salt River Project Phoenix, Arizona November 4, 2009 SRP Ten Year Plan - R. Kondziolka

  2. The Salt River Project (SRP)provides electricity to power usersin a 2,900 square-mile service areain parts of Maricopa, Gila and PinalCounties. SRP reservoirs feed the 135 milecanal system that, along with othersmaller waterways, carries water toeight cities, as well as agriculturaland urban irrigators. Electric service area servedexclusively by SRP. SRP provides full power requirementsof another utility for resale. SRP provides full power requirementsof another utility for resale. Projectmakes direct sales to customers forall mining loads. Electric service areas not served bySRP. SRP’s irrigated area. SRP Ten Year Plan - R. Kondziolka

  3. SRP Electric Service Territory Peoria Scottsdale Surprise Phoenix FountainHills ParadiseValley Eastern Mining Area LitchfieldPark Glendale Tolleson Mesa ApacheJunction Tempe Gilbert Avondale Chandler QueenCreek Goodyear SRP Ten Year Plan - R. Kondziolka

  4. 2014 FUTURE 500kV SUBSTATION 2016 2010 TBD 2020 TBD EXISTING 500kV SUBSTATION EXISTING LINES FUTURE LINES 500kV SYSTEM NAVAJO GS October 30 2009 MOENKOPI YAVAPAI (APS) DUGAS (APS) MARKETPLACE CHOLLA(APS) MORGAN (APS) 2010 MEAD SUGARLOAF (APS) In Service McCULLOUGH SUN VALLEY (APS) 2014 NEVADA CORONADO PINNACLE PEAK (APS) 2010 WESTWING PALO VERDE RUDD HASSAYAMPA TBD SPRINGERVILLE JOJOBA RS20 TBD KYRENE TBD TBD BROWNING SILVERKING 2011 2014 SANTA ROSA 2014 ABEL 2020 PINAL WEST 2014 2011 (TBD, place holder for CATS only, no current SRP plans) 2013/2014 2014 PINAL CENTRAL 2014 NORTH GILA (APS) SUNZIA (SPG) SAGUARO Central New Mexico 2014 TORTOLITA (TEP) SRP Ten Year Plan - R. Kondziolka

  5. TBD DOUBLE CIRCUIT, PHASE TIED LINE PINNACLE PEAK THUNDERSTONE October 30, 2009 GOLDFIELD 230kV SYSTEM, EAST ROGERS TBD BROWNING SANTAN To CORBELL TBD RS17 TBD 2018 DINOSAUR DINOSAUR RS21 TBD TBD TBD TO SILVER KING To SCHRADER 2017 RS24 TBD 2011 2018 2018 RS20 TO SILVER KING TBD LOOP IN TBD TBD 2017 TBD ABEL/RS22 ABEL/RS22 RS23 2011 TBD 2011 EXISTING 230kV CIRCUIT 2014 RANDOLPH SWITCHYARD FUTURE 230kV CIRCUIT DESERT BASIN 2011 EXISTING 230kV SUBSTATIONS 2014 PINAL CENTRAL 2014 2014 FUTURE 230kV SUBSTATIONS GENERATING STATION CATSHV03 TBD SRP Ten Year Plan - R. Kondziolka

  6. TBD DOUBLE CIRCUIT, PHASE TIED LINE 230kV SYSTEM, WEST October 30, 2009 TO W.A.P.A.PINNACLE PEAK TO APSPINNACLE PEAK SRPPINNACLE PEAK W.A.P.A. WESTWING TBD DEERVALLEY(APS) RS26 2014 W.A.P.A. PAPAGO ALEXANDER W.A.P.A. AGUAFRIA BRANDOW THUNDERSTONE To GOLDFIELD WHITETANKS TBD ROGERS RUDD TBD WARD TO APSOCOTILLO ORME LIBERTY(W.A.P.A.) SANTAN CORBELL To BROWNING KYRENE ANDERSON RS17 TBD KNOX EXISTING 230kV CIRCUIT SCHRADER FUTURE 230kV CIRCUIT To RS24 EXISTING 230kV SUBSTATIONS FUTURE 230kV SUBSTATIONS GENERATING STATION SRP Ten Year Plan - R. Kondziolka

  7. FUTURE SUBSTATION EXISTING LINE FUTURE LINE October 30,2009 ROOSEVELT 115kV, EASTERN MINING AREA MORMONFLAT HORSEMESA STEWARTMOUNTAIN FRAZIER TOSILVER KING500kV SILVERKING 230 TBD(230kV) PINTOVALLEY MIAMI GOLDFIELD TBD MOONSHINE 230kV 115kV PINAL TOTHUNDERSTONE CARLOTTA CARREL SPURLOCK ELLISON TBD(230kV) OAKFLAT TRASK DETAIL SEE DETAIL RS20 TBD(230kV) 230kV TBD KNOLL SUPERIOR RAY MORRIS SUPERIOR KEARNY 115KV TBD EXISTING SUBSTATION SUPERIOR HAYDEN 230KV BONNEYBROOK (APS) GENERATING STATION NEW HAYDEN TBD ASARC0 TO APACHE(AEPCO) COOLIDGE(W.A.P.A.) SRP Ten Year Plan - R. Kondziolka

  8. Summary Status Project I/S Status Study Forum Hassayampa – Pinal West 500kV 2008 Complete Yes CATS/ CATS HV/WATS/SEV E&O/ WECC SRWG, TSS Pinal West – Browning 500kV 2011, 2014 Des/ ROW Yes CATS/CATS HV/WATS/SEV E&O/ WECC SRWG, TSS Desert Basin – Pinal Central 230kV 2014 Des Yes CATS HV/WECC SRWG, TSS Pinal Central – Southeast Valley 230kV 2011 Des Yes CATS HV RS24 230kV Transmission Project 2018 Siting Yes RS26 Transmission Project 2014 Pre Siting Yes SRP Ten Year Plan - R. Kondziolka

  9. SRP Changes from 2009 to 2010 Completed Projects Sugarloaf in service Path 54 (Coronado Transmission System) Upgrades 50% Series Comp on Coronado – Silver King 500kV Thermal Upgrade on Silver King – Goldfield 230kV Coronado 2nd 500/345kV Transformer (delayed to 2010) SRP Ten Year Plan - R. Kondziolka

  10. SRP Changes from 2009 to 2010 500kV Projects 2014 Pinal West – Pinal CentralDelayed from 2013 2010 Morgan – Pinnacle Peak Formerly Raceway – Pinnacle Peak 2013/2014 SunZia Project Delayed from 2013 2014 Tortolita – Pinal Central Delayed from 2013 230kV Projects 2017/18 RS24 230kV Transmission ProjectDelayed from 2013 2014 Desert Basin – Pinal Central 230kV Delayed from 2013 SRP Ten Year Plan - R. Kondziolka

  11. Transformer Additions 2010 - 2nd Coronado 500/345kV 2011 - 3rd Kyrene 500/230kV 2011 - 1st Abel 230/69kV 2013 - 1st Rudd 230/69kV 2013 - 3rd Schrader 230/69kV 2014 - 1st & 2nd Pinal Central 500/230kV 2018 - 1st RS24 230/69kV SRP Ten Year Plan - R. Kondziolka