The DCWG meeting took place on April 9-10, 2008, in Washington, D.C., focusing on the group's scope and work plan. Participants reviewed previous action items and discussed EIA collaboration, including improvements to data collection, MOU updates, and upcoming meetings. Key topics included evaluating confidence levels for capacity, regional feedback on summer LTRA data, and risk assessment for capacity margins. Additionally, a task force was formed to define confidence levels, and a trial run for risk analysis approaches was planned, demonstrating ongoing commitment to data accuracy and collaboration.
E N D
DCWG Meeting April 9-10, 2008 (Washington, DC) • Met with EIA • Discussed DCWG Scope • Reviewed Action Items from the Last Meeting • Discussed DCWG Work Plan • Evaluated Confidence Levels for Capacity • Deliberated on Regional Feedback on Summer/LTRA data collection. • Discussed NERC’s current & future data analysis approach
Work Status: Joint Meeting with EIA (Task 6 of DCWG Work Plan) • Meeting held on April 9, 2008 in Washington D.C. • EIA to write letter to NERC outlining (Task 7 of DCWG work plan): • Improvements to Current EIA 411 Data Collection • Future Areas of Collaboration • Update NERC/EIA MOU • NERC to send letter to EIA thanking them (Bob Schnapp) for support on Schedule 7 (Transmission Outage Data) & Schedule 3. • DCWG to re-design Schedule 2 (Unified Generator Database): • Support LTRA • True-up to EIA 860 • NERC to support Presidential Permitting for Canadian/Mexico Interconnections • EIA desires Spring/Fall Meetings
Work Status: DCWG Meeting • Meeting held on April 9-10, 2008 in Washington D.C. • Consistent Posting of Meeting Materials • Formed a task force defining confidence levels for capacity data (Fedora, Simons & Molesky along with a representative from SERC and NERC) • SERC to summarize data submittal recommendations based on regional feedback on the Summer/LTRA data collection • Request RAS move the LTRA due date to May 1 corresponding to EIA’s new due data of July 15, 2008 • NPCC Representative (Fedora) will perform a trial run to demonstrate risk assessment approaches to capacity margin analysis (Supporting Task 4 of the DCWG Work plan)
Agenda & Meeting Objectives -061808 • Status of Risk Analysis and capacity confidence bounds – Phil Fedora • Comments on LTRA forms, as with Summer – Herb Schrayshuen • Update on NERC activities – Mark Lauby • RAITF • IVGTF • DRDTF • RMWG • Individual unit data collection 2009 - All • Status of Letter to EIA – Mark Lauby • Status of MOU with EIA – Mark Lauby • EIA – John Makens • Write DCWG a letter outlining areas of improvement that they would like to see • Presidential permits • Fall Meeting