1 / 6

Presented By : Joan Chamberlain Executive Director

St. Kieran Community Center for the Arts Berlin, New Hampshire Real Project Case Study Northeast Biomass Heating Expo April 4, 2013. Presented By : Joan Chamberlain Executive Director. St. Kieran Community Center for the Arts. Facility Information Located in Berlin, New Hampshire

azure
Télécharger la présentation

Presented By : Joan Chamberlain Executive Director

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. St. Kieran Community Center for the ArtsBerlin, New HampshireReal Project Case StudyNortheast Biomass Heating ExpoApril 4, 2013 Presented By : JoanChamberlain ExecutiveDirector

  2. St. Kieran Community Center for the Arts Facility Information • Located in Berlin, New Hampshire • 19th century Irish Catholic church, converted to an Arts Center in 2000 • Approximately 6,000 ft2 • Previously heated using fuel oil boilers and steam radiators • Converted to hot water distribution and wood pellet boilers in Fall 2012

  3. St. Kieran Community Center for the Arts Biomass System Information • Two 191,000 Btu/Hour wood pellet boilers • 300 gallons of hot water thermal storage • Two 6 ton flexible wood pellet storage bags

  4. St. Kieran Community Center for the Arts Project at a Glance • Funding • NCRC&D/ WERC Grant $80,020 • Berlin Better Buildings $38,862 • Retail Merchants Association of New Hampshire $31,090 • Northern Forest Center $10,000 • Benefits • Project Savings: $10,600 annual energy savings + over $100,000 in avoided costs • Energy Profile (annual): • > 5,000 gal #2 offset ($19,000) • 35 tons of wood pellets used ($8,400) • >25 Tonne Net CO2 Reduction

  5. St. Kieran Community Center for the Arts • Lessons Learned What we did right: • Biomass Heating is “cutting edge” for rural communities, with a learning curve for all involved. It is important to ask clarifying questions and develop a team approach in all phases of project. • Importance of an on-site Project Manager responsible for communications with funders, Board of Directors, Facilities Committee and Contractors. • Leveraged investments in the Biomass Heating System to attract funding for an additional $44,000 to insulate the building, increasing efficiency even more. What we could have done better: • More attention given to system balancing, on-site follow-up, and training once system went operational for the winter season. • BIGGEST “Why didn’t we think of that?” : Installed height of boiler air intake pipes & wood pellet delivery pipes too low for North/Eves side of building without pipe extensions or protective roofs during North Country snow season!