1 / 13

HFT Cone Options

HFT Cone Options. Eric Anderssen, LBNL. Current Cone Structure. TPC Volume. Existing support cone. SSD. SSD. End Planes. FGT Requires New West Cone. TPC Volume. replacement interface plate. End Planes. SSD. SSD. Either NEC or Modified East Cone. TPC Volume. FGT. FGT. IST. IST.

badrani
Télécharger la présentation

HFT Cone Options

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. HFT Cone Options Eric Anderssen, LBNL

  2. Current Cone Structure TPC Volume Existing support cone SSD SSD End Planes

  3. FGT Requires New West Cone TPC Volume replacement interface plate End Planes

  4. SSD SSD Either NEC or Modified East Cone TPC Volume FGT FGT

  5. IST IST ISC with integrated IST • IST Clam Shelled around Pixel Insertion Structure • Must fit thru Aperture in Cone for this to work • Requires either modified Cone or New West Cone

  6. SSD IST IST SSD Requires larger EC Aperture TPC Volume FGT PXL FGT

  7. PXL Pixel ISC Without IST ‘Card Cage’/PXL Installation Tool • ISC installed thru current East CONE plate—least modification • IST cannot fit, must be installed after • IST Services make more sense to route with SSD Services • IST SSD integrated serially, after ISC installation

  8. NCS Pxl IS IST IST IST IST New Cone Assembly Sequence SSD Integration PXL IS Insertion (includes BP and IST) SSD FGT FGT Integration SSD Pxl IS Beam Pipe Integration IST Integration PXL PXL Insertion Insertion into STAR

  9. NCS Pxl IS IST IST IST IST Assembly Sequence SSD Integration PXL IS Insertion (includes BP and IST) SSD FGT FGT Integration SSD Pxl IS Beam Pipe Integration IST Integration PXL PXL Insertion Insertion into STAR

  10. PXL Minimal change—Only New West Cone TPC Volume replacement interface plate existing SSD interface SSD GEM forward tracker IST IST GEM forward tracker SSD Existing support cone cone coupling beam new support cone nw existing interface plate

  11. SSD Service TPC Volume SSD GEM forward tracker pixel tube IST new central beam pipe supports SSD Service in Red IST GEM forward tracker SSD

  12. IST Service TPC Volume SSD GEM forward tracker pixel tube IST new central beam pipe supports IST Service in Red IST GEM forward tracker SSD

  13. IST IST Old Cone Assembly Sequence Pxl IS Beam Pipe Integration IST Integration PXL IS Insertion (includes BP and IST) FGT Pxl IS FGT Integration SSD PXL PXL Insertion SSD Insertion into STAR

More Related