Cerrillos Hills Cell Tower

Cerrillos Hills Cell Tower. Team Three: Sabrina Flores, Angela Wetz, Jane Sanderford, Bridget Clayton, Brenda Warner, and Jon Jasper Field Manager: Steve Fostberg Applicant: “Digital” Dave Grand from Grand Central Cell (GCC). GCC Proposed Project.

basil
Télécharger la présentation

Cerrillos Hills Cell Tower

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Cerrillos Hills Cell Tower Team Three: Sabrina Flores, Angela Wetz, Jane Sanderford, Bridget Clayton, Brenda Warner, and Jon Jasper Field Manager: Steve Fostberg Applicant: “Digital” Dave Grand from Grand Central Cell (GCC)

  2. GCC Proposed Project • 130’ self supporting lattice tower w/non glaring metallic finish supported on concrete pad • 75 x 75 foot fenced compound on 5 acres of Bureau of Land Management leased area • 1.5 miles x 25’ new access road

  3. Proposed Project Area • 20 miles southwest of Santa Fe, NM

  4. Background • VRM Class III • Cerrillos Historic Mining District • Nominated as a scenic vista by Santa Fe County • Endangered bat roosts in old mine adits • Company has history of controversy

  5. Analysis of Visual Impacts • KOP1- looking west from residential area and county road

  6. Analysis of Visual Impacts • KOP2- looking south from heavily traveled county road

  7. Analysis of Visual Impacts • Visual Contrast Rating Worksheet

  8. Landscape Contrast?

  9. Visual Simulation KOP1

  10. Visual Simulation KOP1 w/Tower

  11. Visual Simulation KOP1 w/Tower

  12. Visual Simulation KOP2

  13. Visual Simulation KOP2 w/Tower

  14. Project Mitigation • Required relocation • Reduction in footprint to 100 x 100 feet • No new road construction authorized • Required to paint 130’ lattice tower yuma green

  15. Final Project Area

  16. Project w/Mitigation

  17. Project w/Mitigation KOP1

  18. Project w/Mitigation KOP2

  19. Project w/Mitigation KOP2

  20. Benefits • Power located in close proximity • Avoidance of historic mining district • Visual sensitivity to residents and county roads • Minimize possible impacts to other resources • Provides necessary coverage desired by applicant • Applicant and BLM saved time, money, and public image • With mitigation project now meets VRM III