An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Technical Training in 2005 The ECDL Pilot Project 2005TEC, 6.12.2005 Davide VitèHR-PMD – TEC, 6.12.2005

  2. Technical Training: General • Restructuring of HR-PMD-ATT • Reduced administrative support during the second half of 2005 • some short-term help was made available • opportunity for process review • CTA2 - CERN Training Application • debugging phase • 2005 Revalidation exercise – year-end 2005 • withdrawal of pending Training Requests made prior to September or December 2004 (TBC)

  3. Internship from the University of Geneva:TT Evaluation project (1) • UNIGE Degree project with CERN Technical Training • Contacts with departments/units (DTOs, staff,…) and trainers • 4 DTOs and a couple of trainers already met • Evaluation of technical competences acquired following a specific training action – draft proposal being evaluated • Selection of a few appropriate course sessions • Identify needs and expectations before the training action • Training action • Feedback questionnaire (at the end of session) • Evaluation form (1-3 months later) • Evaluation interview (1-2 months later)

  4. Internship from the University of Geneva:TT Evaluation project (2) • Choice of course sessions more appropriateto an evaluation pilot project • AutoCAD, PCAD • LabVIEW, Siemens Step 7 • some office software (Excel, PowerPoint, Acrobat, FrontPage) • a possible next session of Technique du vide • Participation to other course evaluation and/or design activities when relevant to both parties • e.g., re-evaluation of recent training action on Dreamweaver (new training company) • Corrective action being designed, organised, and evaluated after a first session with mixed feedback • some DTOs contacted

  5. Technical Training in 2005:Provisional statistics

  6. 2005 Statistics – provisional (1)

  7. 2005 Statistics – provisional (2) Exceptional contributions to yearly statistics (1) • Software & System Technologies • PVSS/JCOP: 2 courses, CERN trainers15 sessions, 136 participants • EDMS: 4 courses, CERN trainers13 sessions, 110 participants • Electronics design • LabVIEW: 6 courses, external trainers (National Instruments)11 sessions, 68 participants • High-speed Digital PCB design: 1 course,external trainers (Oxford University Continuing Education)1 session, 47 participants

  8. 2005 Statistics – provisional (3) Exceptional contributions to yearly statistics (2) • Office software • CERN-specific (CET, LaTeX), 2 sessions, 22 participants • Special • EDMS: 1 course, CERN trainers2 sessions, 29 participants • Oracle Certifications: 2 sessions, 25 participants • AutoCAD: 1 course (training support to version migration, AutoCAD2002 to AutoCAD2006 transition), external trainers4 sessions, 32 participants

  9. 2005 Statistics – provisional (4) Course Series • ELEC-2005 - Electronics in High Energy Physics4 Terms, 28 two-hour lectures, 40 ave. registrations per term • IT3T - IT Technical Training Tutorials) - June 2005http://winservices.web.cern.ch/WinServices/seminars/Tutorials/4 Tutorials, 20 registrations per tutorial (on average) • AXEL-2005 - Introduction to Particle Accelerators10 one-hour lectures, 5 days, 53 registrations • EMAG-2005 - Electromagnetic Design and Mathematical Optimization Methods in Magnet Technology8 three-hour lectures + 8 topical seminars, 8 days22 registrations

  10. TT courses in preparation • CLEAN-2002: Working in a cleanroom (F/E) • cleanroom course being revised • AXEL-2006 or 2007 • Reviewed software engineering curriculum • Software engineering • C++ • Java • Office software curriculum • Short courses vs. long courses • ECDL? • Certification • LabVIEW, AutoCAD

  11. Technical Training Seminars 2005 • LEICA GEOSYSTEMS AGLaser Trackers:the Local Positioning Technology (LPT)May 2005 • CADSCHOOLForum AutoCAD Mechanical 2006November 2005Training support for 2002  2006 software migration 2 seminars being scheduled in early 2006 • Texas Instruments • A Physicist in the world of finance (AT)

  12. The ECDL Pilot Project 2005:Report

  13. Why ECDL? • internationally recognized competency model • CERN STI 2004 project • for personnel development (considering current structure of short- and long-term contracts) • modularity is a key factor • objective benchmark • increase knowledge of relevant applicationsto enhance productivity • within an ongoing development process • ECDL Start, ECDL, ECDL Advanced, CAD (Computer Aided Design), CTP (Certified Training Professional)

  14. The 7 Modules • M1 Basic concepts of IT • M2 Using the computer and managing files • M3 Word processing • M4 Spreadsheets • M5 Database • M6 Presentation • M7 Information and Communication computerised tests NB: ECDL is not vendor oriented

  15. ECDL at CERN – peculiarities • importance of a modular approach • all commercial software at CERN is made available by IT in English only • need of a training offer for office software in English AND in French on the English software

  16. The CERN ECDL 2004Evaluation Project (Pilot #1) • phase 1a: evaluation by external consultant • phase 1b: internal evaluation • policy, evaluation of need and interest levels, project definition, initial endorsement by TEC and JTB • phase 2: pilot project with selected users • 3 information sessions • special training sessions • CERN ECDL Test Day: 2.12.2004 • phase 3: final evaluation • phase 4: recommendation of second pilot

  17. The CERN ECDL 2005PH Project (Pilot #2) • New Pilot Project 2005 for the first “standard” ECDL certification at CERN(official ECDL Test Centre CH-180) • the DTO of PH collaborated in gradually introduce ECDL • Identification of a group of 9 people (in particular new LS with LD contracts) • special project aimed at offering the ECDL Start • financial support – cost was about 3’200.- CHF (tests, trainer) • 4 sessions (April-July 2005) • facilitated by TT and external (ECDL certified) trainer

  18. PH Pilot project 2005 - ECDL

  19. How is ECDL currently used at CERN? • ECDL for staff recruiting – diagnostic tests • 10 selection boards since March 2005 • ECDL for training – diagnostic tests • Proposed at the end of relevant training sessions (classroom- or Web-based) • Pilot course with ECDL test proposed: • ACCESS 2003 - Level 1 • Limited interest if left optional

  20. ECDL proposal for 2006 • Renew site license • Propose ECDL certification • Identify target audience – open attitude preferred • Support from JTB, TEC, DTO & management if possible (at the GL level at least) • Apply new evaluation method (UNIGE intern) • Training: continue with diagnostic tests • Recruiting: continue with diagnostic tests Proposal submitted to the JTB on 22.11.2005

  21. A possible implementationof ECDL at CERN • The ECDL Start Certificate • Any 4 of the 7 modules • Suggested choice (PH, TT, IT): • M1 Basic concepts of IT • M2 Using the computer and managing files • M7 Information and Communication • M3 Word processing or M4 Spreadsheets • Training to be offered, where necessary