Interface Level Measurement (Water/Oil)

Interface Level Measurement (Water/Oil). Challenge: Gravity seperation, crude oil is collected at storage tanks from wells, its allowed to settle so that water will be collected at bottom and oil surface. The challenge is to depose safely water without draining oil. Environment:

baylee
Télécharger la présentation

Interface Level Measurement (Water/Oil)

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Interface Level Measurement (Water/Oil) Challenge: • Gravity seperation, crude oil is collected at storage tanks from wells, its allowed to settle so that water will be collected at bottom and oil surface. • The challenge is to depose safely water without draining oil. Environment: • Limitations at installation. • Emulsion separation layer between Water and Oil. Big question about performance Solution: • DC11 Full insulated Capacitive probe with carefully calculated length + FMC671z Product group: Level Industry: Oil & Gas Installed at: Saudi Aramco Benefit: Reliable safe and inexpensive interface switching.

  2. Interface Level Measurement (Water/Oil) • Customer: Saudi Arabian Oil Co. (Saudi Aramco) • World largest Oil producer, (currently 12.5 MMBPD) • At gravity separation, disposing water without draining oil can be difficult to control. Saudi Aramco was looking for a solution to drain water until a point where all water has been drained and it is now only oil is at bottom. They requires a valve to switch off once all the water was drained. • Slight problem with calibration, we proposed an exact length cylinder as the probe to be used externally for calibration. • Performing since May 2003  • Sold 22 units with potential 60 (order expected within weeks)

  3. Interface Level Measurement (Water/Oil) • Installation

  4. Interface Level Measurement (Water/Oil) • The Ultimate success is what every body is looking for: specification sheet with all particular details.